HomeMy WebLinkAboutOrdinance 19858-08-2011ORDINANCE NO. 19858 -08 -2011
AN ORDINANCE ESTABLISHING MAXIMUM PERMITTED RATES
AND CHARGES THAT ATMOS ENERGY CORP., MID -TEX DIVISION,
MAY ASSESS CUSTOMERS IN THE CITY OF FORT WORTH;
APPROVING AND RATIFYING A RELATED SETTLEMENT AND
RESOLUTION BETWEEN ATMOS ENERGY CORP., MID -TEX
DIVISION, AND THE ATMOS CITIES STEERING COMMITTEE, OF
WHICH THE CITY IS A MEMBER; ADOPTING DECLARATIONS AND
FINDINGS RELATED TO RATES AND CHARGES ASSESSED TO
CUSTOMERS IN THE CITY OF FORT WORTH; DIRECTING ATMOS
ENERGY CORP., MID -TEX DIVISION, TO REIMBURSE ALL RATE
CASE EXPENSES; REPEALING ANY PREVIOUSLY ADOPTED
ORDINANCES IN CONFLICT HEREWITH; PROVIDING FOR
SEVERABILITY; AND ESTABLISHING AN EFFECTIVE DATE.
WHEREAS, on May 16, 2006 the City Council adopted Resolution No. 3348 -05 -2006
authorizing participation by the City of Fort Worth (the "City ") in the Atmos Cities Steering
Committee (the "Steering Committee ") for assistance in rate cases involving Atmos Energy
Corp., Mid -Tex Division ( "Atmos "), including the retention of consultants and outside legal
counsel associated with such assistance ; and
WHEREAS, on February 19, 2008 the City Council adopted Ordinance No. 17989 -02-
2008 approving a Settlement Agreement between Atmos and the Steering Agreement as to
disputed matters in certain matters identified in that Ordinance, including, but not limited to,
continuing disagreement, disputes, and litigation over the application of and basis for Gas
Reliability Infrastructure Program (GRIP) surcharges, as provided in Section 104.301 of the
Texas Utilities Code (the "Settlement Agreement "); and
WHEREAS, in accordance with the Settlement Agreement, pursuant to Ordinance No.
17989 -02 -2008, the City Council approved an expedited rate review mechanism ("RRM") for
future rate proceedings involving Atmos through at least 2011; and
Page 1 45
Annos RRM Ordinance (201 1)
WHEREAS, in accordance with the process outlined in the Settlement Agreement, on or
about April 1, 2011, Atmos filed with the City an application pursuant to the RRM tariff to
increase natural gas rates by approximately $15.7 million aggregate increase applicable to each
municipality that adopted the RRM tariff as part of their approval of the Settlement Agreement
(the "2011 RRM Filing "); and
WHEREAS, the Steering Committee and its lawyers and consultants have reviewed the
2011 RRM Filing and concluded that the evidence provided by Atmos in support of its 2011
RRM Filing does not justify the proposed rate increase; and
WHEREAS, on the basis of the review and analysis of Atmos's 2011 RRM Filing
undertaken by the Steering Committee's lawyers and consultants, the Steering Committee's
executive committee has recommended that the City Council adopt the rate tariffs attached
hereto as Exhibit "A ", which is hereby made a part of this Ordinance for all purposes, resulting
in an increase of approximately $6.6 million in Atmos's revenue requirements in all
municipalities that adopted the RRM tariff as part of their approval of the Settlement Agreement;
and
WHEREAS, the negotiated resolution of the 2011 RRM Filing and the resulting rates
are, as a whole, in the public interest;
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE
CITY OF FORT WORTH, TEXAS:
Pagc 2 of 5
Atmos RRM Ordinancc 1201 1 1
Section 1.
FINDINGS.
That the City Council, pursuant to its exclusive original jurisdictional authority over the
rates, operations, and services of Atmos within the City and in the exercise of its sound
legislative discretion, makes the following findings of fact:
1.1. The statements set forth in the Recitals above are true and correct and are hereby
incorporated as part of the findings herein.
1.2. Independent analysis by the Steering Committee's rate expert concluded that
Atmos's 2011 RRM Filing is unable to justify an increase over current rates
except for undisputed costs of $6.6 million to cover the costs of a steel service
line replacement program initiated in 2010.
1.3. Based on all information previously provided to and before the City Council, the
City Council hereby finds that the rates proposed by Atmos in its 2011 RRM
Filing are unreasonable.
1.4. The tariffs attached hereto as Exhibit "A ", which will increase Atmos's revenue
requirement by $6.6 million to allow recovery of incremental direct costs of a
steel service line replacement program, are just and reasonable and in the public
interest.
Section 2.
RATES AND CHARGES ORDERED.
That based on the findings of fact set forth in Section 1 of this Ordinance and all other
information before the City Council, Atmos is hereby authorized and ordered to implement the
tariffs attached hereto as Exhibit "A ".
Page 3 of i
Atmos RRM Ordinance (201 1 )
Section 3.
REIMBURSEMENT OF RATE CASE EXPENSES.
That Atmos shall reimburse the reasonable ratemaking expenses of the City, as part of
the Steering Committee, in processing the 2011 RRM Filing.
Section 4.
REPEAL OF ORDINANCES IN DIRECT CONFLICT.
That if any provisions or conditions of this Ordinance directly conflict with any
provisions or conditions of other Ordinances previously adopted by the City Council, the
conflicting provisions of such previously adopted Ordinances are hereby repealed.
Section 5.
COMPLIANCE WITH OPEN MEETINGS ACT REQUIREMENTS.
That the meeting in which this Ordinance was adopted was in all things conducted in
strict compliance with the Texas Open Meetings Act, as codified at Chapter 551, Texas
Government Code.
Section 6.
SEVERABILITY.
That if any portion, section or part of a section of this Ordinance is subsequently declared
invalid, inoperative or void for any reason by a court of competent jurisdiction, the remaining
portions, sections or parts of sections of this Ordinance shall be and remain in full force and
effect and shall not in any way be impaired or affected by such decision, opinion or judgment.
Page 4 of 5
ntmos RRM Ordinance (201 1)
Section 7.
EFFECTIVE DATE.
That this Ordinance shall take effect and be in full force and effect from and after the date
of its adoption, with the tariffs attached hereto in Exhibit "A" to be effective for bills rendered
on and after September 1, 2011. The City Secretary is hereby directed to deliver a certified copy
of this Ordinance to Atmos, care of David Park, Vice President Rates and Regulatory Affairs,
Atmos Energy Corporation, 5420 LBJ Freeway, Suite 1862, Dallas, TX 75240, and to the
Steering Committee's outside legal counsel, Geoffrey Gay, Lloyd Gosselink Rochelle &
Townsend, P.C., P.O. Box 1725, Austin, TX 78767 -1725.
AND IT IS SO ORDAINED.
ADOPTED AND EFFECTIVE: August 23, 2011
APPROVED AS TO FORM AND LEGALITY:
By:_ fiAE
Peter Vaky
Deputy City Attorney
M &c: G-17,361 Z -23 -/l
Page 5 of 5
Atmos RRM Ordinance (201 1 )
MID -TEX DIVISION
ATMOS ENERGY CORPORATION
RATE SCHEDULE:
R — RESIDENTIAL SALES
APPLICABLE TO:
All Cities except the City of Dallas
EFFECTIVE DATE: i
Bills Rendered on or after 9/1/2011
Application
Applicable to Residential Customers for all natural gas provided at one Point of Delivery and measured
through one meter.
Type of Service
Where service of the type desired by Customer is not already available at the Point of Delivery, additional
charges and special contract arrangements between Company and Customer may be required prior to
service being furnished.
Monthly Rate
Customer's monthly bill will be calculated by adding the following Customer and Mcf charges to the
amounts due under the riders listed below:
Charge
Amount
Customer Charge per Bill
$ 7.50 per month
Commodity Charge — All Mcf
$ 2.5116 per Mcf
Gas Cost Recovery: Plus an amount for gas costs and upstream transportation costs calculated
in accordance with Part (a) and Part (b), respectively, of Rider GCR.
Weather Normalization Adjustment: Pius or Minus an amount for weather normalization
calculated in accordance with Rider WNA.
Franchise Fee Adjustment Plus an amount for franchise fees calculated in accordance with Rider
FF. Rider FF is only applicable to customers inside the corporate limits of any incorporated
municipality.
Tax Adjustment: Plus an amount for tax calculated in accordance with Rider TAX.
Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s).
Agreement
An Agreement for Gas Service may be required.
Notice
Service hereunder and the rates for services provided are subject to the orders of regulatory bodies
having jurisdiction and to the Company's Tariff for Gas Service.
EXHIBIT "A"
MID -TEX DIVISION
ATMOS ENERGY CORPORATION
RATE SCHEDULE:
C — COMMERCIAL SALES
APPLICABLE TO:
All Cities except the City of Dallas
EFFECTIVE DATE:
Bills Rendered on or after 9!1!2011
Application
Applicable to Commercial Customers for all natural gas provided at one Point of Delivery and measured
through one meter and to Industrial Customers with an average annual usage of less than 3,000 Mcf.
Type of Service
Where service of the type desired by Customer is not already available at the Point of Delivery, additional
charges and special contract arrangements between Company and Customer may be required prior to
service being furnished.
Monthly Rate
Customers monthly bill will be calculated by adding the following Customer and Mcf charges to the
amounts due under the riders listed below:
Charge
Amount
Customer Charge per Bill
$ 16.75 per month
Commodity Charge - All Mcf
$ 1.0217 per Mcf
Gas Cost Recovery: Plus an amount for gas costs and upstream transportation costs calculated
in accordance with Part (a) and Part (b), respectively, of Rider GCR,
Weather Normalization Adjustment: Plus or Minus an amount for weather normalization
calculated in accordance with Rider WNA_
Franchise Fee Adjustment: Plus an amount for franchise fees calculated in accordance with Rider
FF. Rider FF is only applicable to customers inside the corporate limits of any incorporated
municipality.
Tax Adjustment: Plus an amount for tax calculated in accordance with Rider TAX.
Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s).
Agreement
An Agreement for Gas Service may be required_
Notice
Service hereunder and the rates for services provided are subject to the orders of regulatory bodies
having jurisdiction and to the Company's Tariff for Gas Service.
MID -TEX DIVISION
ATMOS ENERGY CORPORATION
RATE SCHEDULE:
1— INDUSTRIAL SALES
APPLICABLE TO:
All Cities except the City of Dallas
EFFECTIVE DATE:
Bills Rendered on or after 8/1/2011
Next 3,500 MMBtu
Application
Applicable to Industrial Customers with a maximum daily usage (MDU) of less than 3,500 MMBtu per day
for all natural gas provided at one Point of Delivery and measured through one meter. Service for
Industrial Customers with an MDU equal to or greater than 3,500 MMBtu per day will be provided at
Company's sole option and will require special contract arrangements between Company and Customer.
Type of Service
Where service of the type desired by Customer is not already available at the Point of Delivery, additional
charges and special contract arrangements between Company and Customer may be required prior to
service being furnished.
Monthly Rate
Customer's monthly bill will be calculated by adding the following Customer and MMBtu charges to the
amounts due under the riders listed below:
Charge
Amount
Customer Charge per Meter
$ 450.00 per month
First 0 MMBtu to 1,500 MMBtu
$ 0.2750 per MMBtu
Next 3,500 MMBtu
$ 0.2015 per MMBtu
All MMBtu over 5,000 MMBtu
$ 0.0433 per MMBtu
Gas Cost Recovery: Plus an amount for gas costs and upstream transportation costs calculated
in accordance with Part (a) and Part (b), respectively, of Rider GCR.
Franchise Fee Adjustment: Plus an amount for franchise fees calculated in accordance with Rider
FF. Rider FF is only applicable to customers inside the corporate limits of any incorporated
municipality.
Tax Adjustment: Plus an amount for tax calculated in accordance with Rider TAX,
Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s)
Curtailment Overpull Fee
Upon notification by Company of an event of curtailment or interruption of Customer's deliveries,
Customer will, for each MMBtu delivered in excess of the stated level of curtailment or interruption, pay
Company 200% of the midpoint price for the Katy point listed in Platts Gas Daily published for the
applicable Gas Day in the table entitled "Daily Price Survey."
MID -TEX DIVISION
ATMOS ENERGY CORPORATION
RATE SCHEDULE:
I — INDUSTRIAL SALES
APPLICABLE TO:
All Cities except the City of Dallas
EFFECTIVE DATE:
Bills Rendered on or after 8/1/2011
Replacement Index
In the event the "midpoint" or "common" price for the Katy point listed in Platfs Gas Daily in the table
entitled "Daily Price Survey" is no longer published, Company will calculate the applicable imbalance fees
utilizing a daily price index recognized as authoritative by the natural gas industry and most closely
approximating the applicable Index.
Agreement
An Agreement for Gas Service may be required.
Notice
Service hereunder and the rates for services provided are subject to the orders of regulatory bodies
having jurisdiction and to the Company's Tariff for Gas Service.
Special Conditions
In order to receive service under Rate I, Customer must have the type of meter required by Company.
Customer must pay Company all costs associated with the acquisition and installation of the meter.
MID TEX DIVISION
ATMOS ENERGY CORPORATION
RATESCHEDULE:
T— TRANSPORTATION
APPLICABLE TO:
All Cities except the City of Dallas
EFFECTIVE DATE:
Bills Rendered on or after 9/1/2011
Next 3,500 MMBtu
Appllcation
Applicable, in the event that Company has entered into a Transportation Agreement, to a customer
directly connected to the Atmos Energy Corp., Mid -Tex Division Distribution System (Customer) for the
transportation of all natural gas supplied by Customer or Customer's agent at one Point of Delivery for
use in Customer's facility.
Type of Service
Where service of the type desired by Customer is not already available at the Point of Delivery, additional
charges and special contract arrangements between Company and Customer may be required prior to
service being fumished.
Monthly Rate
Customer's bill will be calculated by adding the following Customer and MMBtu charges to the amounts
and quantities due under the riders listed below:
Charge
Amount
Customer Charge per Meter
$ 450.00 per month
First 0 MMBtu to 1,500 MMBtu
$ 0.2750 per MMBtu
Next 3,500 MMBtu
$ 0.2015 per MMBtu
All MMBtu over 5,000 MMBtu
$ 0.0433 per MMBtu
Upstream Transportation Cost Recovery: Plus an amount for upstream transportation costs in
accordance with Part (b) of Rider GCR.
Retention Adjustment: Plus a quantity of gas as calculated in accordance with Rider RA.
Franchise Fee Adjustment Plus an amount for franchise fees calculated in accordance with Rider
FF. Rider FF is only applicable to customers inside the corporate limits of any incorporated
municipality.
Tax Adjustment: Plus an amount for tax calculated in accordance with Rider TAX.
Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s).
imbalance Fees
All fees charged to Customer under this Rate Schedule will be charged based on the quantities
determined under the applicable Transportation Agreement and quantities will not be aggregated for any
Customer with multiple Transportation Agreements for the purposes of such fees.
MID -TEX DIVISION
ATMOS ENERGY CORPORATION
RATE SCHEDULE:
T — TRANSPORTATION
APPLICABLE TO:
All Cities except the City of Dallas
EFFECTIVE DATE:
Bills Rendered on or after 9/1/2011
Monthly Imbalance Fees
Customer shall pay Company the greater of (i) $0.10 per MMBtu, or (ii) 150% of the difference per MMBtu
between the highest and lowest "midpoint" price for the Katy point listed in Platts Gas Daily in the table
entitled "Daily Price Survey" during such month, for the MMBtu of Customer's monthly Cumulative
Imbalance, as defined in the applicable Transportation Agreement, at the end of each month that exceeds
10% of Customer's receipt quantities for the month.
Curtailment Overpull Fee
Upon notification by Company of an event of curtailment or interruption of Customer's deliveries,
Customer will, for each MMBtu delivered in excess of the stated level of curtailment or interruption, pay
Company 200% of the midpoint price for the Katy point listed in Platts Gas Daily published for the
applicable Gas Day in the table entitled "Daily Price Survey."
Replacement Index
In the event the "midpoint" or "common" price for the Katy point listed in Platts Gas Daily in the table
entitled "Daily Price Survey" is no longer published, Company will calculate the applicable imbalance fees
utilizing a daily price index recognized as authoritative by the natural gas industry and most closely
approximating the applicable index.
Agreement
A transportation agreement is required.
Notice
Service hereunder and the rates for services provided are subject to the orders of regulatory bodies
having jurisdiction and to the Company's Tariff for Gas Service.
Special Conditions
In order to receive service under Rate T, customer must have the type of meter required by Company.
Customer must pay Company all costs associated with the acquisition and installation of the meter.
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 8/2312011 - Ordinance Nu: 19858 -08 -2011
DATE: Tuesday, August 23, 2011
LOG NAME: 12ATMOS 2011 RRM
REFERENCE NO.: * *G -17361
SUBJECT:
Adopt Ordinance Establishing Maximum Permitted Rates and Charges that Atmos Energy Corporation,
Mid -Tex Division, May Assess Customers in the City of Fort Worth (ALL COUNCIL DISTRICTS)
RECOMMENDATION:
It is recommended that the City Council adopt the attached ordinance establishing maximum permitted
rates and charges that Atmos Energy Corporation, Mid -Tex Division, may assess customers in the City of
Fort Worth pursuant to a negotiated settlement and resolution of Atmos' proposed rate increase under
2011 Rate Review Mechanism Filing.
DISCUSSION:
On May 16, 2006, the City Council adopted Resolution No. 3348- 05 -06, which authorized participation
with other cities in the Atmos Energy Corporation ( Atmos) service area to form a standing steering
committee with the authority to act on behalf of its members in any proceeding relating to gas utility
regulation (M &C G- 15202). This committee is known as the Atmos Cities Steering Committee (ACSC).
On September 20, 2007, Atmos filed with the City of Fort Worth (City) a Statement of intent to Increase
Gas Utility Rates within the Incorporated Areas Served by the Mid -Tex Division. ACSC and Atmos
representatives negotiated an Agreement to settle this case that included a provision for an annual rate
review. The Rate Review Mechanism (RRM) was intended to expedite the rate review process by the
cities without costly litigation. On February 19, 2008, the City Council adopted Ordinance No. 17989 -02-
2008 approving the Settlement Agreement and authorizing the RRM tariff.
Atmos filed an application to increase natural gas rates pursuant to the RRM tariff with the cities which
approved the Settlement Agreement on or about April 1, 2011. The application requested approximately
$15.7 million in additional revenue. ACSC designated a negotiation committee made up of city
representative, which included the Utility Administrator for the City of Fort Worth, assisted by ACSC's
attorney, and consultant, to resolve issues identified in the Company's RRM filing. The negotiating
committee and Atmos reached an Agreement to increase Atmos' revenue requirement by $6.6 million to
be recovered through the customer charge component of rates to cover direct incremental costs
associated with a steel service line replacement program approved as part of last year's rate adjustment.
All other relief requested by Atmos Mid -Tex is denied.
In 2010, under pressure from the Railroad Commission to establish a comprehensive program to replace
service lines that contain steel which is subject to corrosion and leaks, ACSC worked with Atmos Mid -Tex
to establish a risk based approach to steel service line replacement that accomplishes the following goals:
1. Replace all service lines throughout the Mid -Tex Region with the highest degree of risk within two
years;
Logname: 12ATMOS 2011 RRM Page 1 of 3
2. Coordination between ACSC city members and Atmos Mid -Tex to minimize disruption of rights of way
without compromising safety;
3. To minimize and spread the rate impact on customers of the replacement program, the service lines
with little relative risk of leaks should be replaced over a 10 -year period; and
4. Current recovery of incremental (above and beyond normal maintenance and repair addressed in RRM
proceedings) direct (excluding Atmos Mid -Tex overheads) cost of service line replacement should be
permitted as an adder to customer charges.
The Agreement between ACSC and Atmos approved in 2010 contemplates that incremental revenue to
cover future steel service line replacement costs would be recovered through customer charges.
Consistent with that approach, the $6.6 million in additional revenues to be recovered following the
passage of the Ordinance is accomplished by increasing customer charges.
The tariffs to be approved by the Ordinance set monthly customer charges at $7.50 and $16.75 for
residential and commercial customers, respectively. Under this settlement the average residential
customer (using 4.5Mcf a month) will have an increase of $0.31 per month or 0.66 percent, the average
commercial customer (using 34.8Mcf a month) will have an increase of $0.88 per month or 0.88 percent.
ACSC recommends that its members approve the attached rate tariffs (Exhibit A) and find that the rates
therein are just, reasonable and in the public interest.
The following table shows the current and recommended rates:
Residential
Present
Recommended
Customer Charge
$7.15
$7.50
All Mcf
$2.5246
$2.5116
Commercial
Present
Recommended
Customer Charge
$13.91
$16.75
All Mcf
$ 1.0796
$ 1.0217
Industrial
Present
Recommended
Customer Charge
$450.00
$450.00
First 1,500 MMBtu
$ 0.2750
$ 0.2750
Next 3,500 MMBtu
$ 0.2015
$ 0.2015
All over 5,000 MMBtu
$ 0.0433
$ 0.0433
Transportation
Present
Recommended
Customer Charge
$450.00
$450.00
First 1,500 MMBtu
$ 0.2750
$ 0.2750
Next 3,500 MMBtu
$ 0.2015
$ 0.2015
All over 5,000 MMBtu
$ 0.0433
$ 0.0433
Upon adoption of the attached ordinance, the rate schedule set forth in Exhibit A of the ordinance will take
effect with bills rendered after September 1, 2011.
FISCAL INFORMATION / CERTIFICATION:
Logname: 12ATMOS 2011 RRM Page 2 of 3
The Financial Management Services Director certifies that this action will have no material effect on City
funds.
FUND CENTERS:
TO Fund /Account/Centers
CERTIFICATIONS:
Submitted for City Manager's Office by:
Originating Department Head:
Additional Information Contact:
FROM Fund /Account/Centers
Charles Daniels (6199)
Sarah Fullenwider (7606)
Bridgette Garrett (8518)
Logname: 12ATMOS 2011 RRM Page 3 of 3