HomeMy WebLinkAboutContract 51802 Received Date: 01/30/19
Received Time:8:03 AM
Developer and Project Information Cover Sheet:
Developer Company Name: Westhouse Residences,LLC
3 Address,State,Zip Code: 2204 Lakeshore Drive,Suite 450 Birmingham,AL 35209
Phone&Email: 205-484-2849;michael@livdev.com
Authorized Signatory,Title: Robert B.Crumpton,III,Manager
i
3 Project Name: Park Vista Apartments a
Brief Description: 318-unit multifamily development i
i €
j Project Location: I -4140 Keller Hicks Road
Plat Case Number: FS-18-162 Plat Name: Park Vista Apartments
i 1
Mapsco: ? Council District: l
j CFA Number: CFA18-0131 City Project Numbqr: 101734
City of Fort Worth,Texas
Standard Community Facilities Agreement-Park Vista Apartments
CFA Official Release Date:02.20.2017 EFT.
AL RECORD
Page I of 11
ECRETARY
ORTH, TX
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. 51802
WHEREAS,Westhouse Residences,LLC,("Developer"),desires to make certain specific
improvements as described below and on the exhibits attached hereto("Improvements")related to
a project generally described as Park Vista Apartments ("Project") within the City or the
extraterritorial jurisdiction of Fort Worth,Texas("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS,any future City participation in this CFA is subject to the availability of City
funds and approval by the Fort Worth City Council and shall be memorialized as an amendment
to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW,THEREFORE,for and in consideration of the covenants and conditions contained
herein,the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth,as amended, is hereby incorporated
into this Agreement as if copied herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and obligations hereunder and to
cause all contractors hired by Developer to comply with the Policy in connection with the
work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Park Vista Apartments
CFA Official Release Date:02.20.2017
Page 2 of 11 OFFICIAL RECORD
CITY SECRETARY
FT. WORTH,TX
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by Developer
for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike manner
and in accordance with all City standards and the City-approved construction plans,
specifications and cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water(A) ®, Sewer(A-1) ®,Paving(B) ®, Storm Drain(B-1) ®, Street Lights& Signs
(C) O.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered
in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its
contractor(s)pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified,insured, licensed and
bonded to do work in public ways and/or prequalified to perform water/wastewater
construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure,and a maintenance bond in the name of the City
for one hundred percent (100%) of the contract price of the infrastructure for a
period of two (2)years from the date of final acceptance insuring the maintenance
and repair of the constructed infrastructure during the term of the maintenance
bond. All bonds to be furnished before work is commenced and to meet the
requirements of Chapter 2253,Texas Government Code.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Park Vista Apartments
CFA Official Release Date:02.20.2017
Page 3 of I 1
iii. To require the contractor(s)it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer-awarded
infrastructure construction contracts. The City shall be named as additional insured
on all insurance required by said documents and same will be evidenced on the
Certificate of Insurance (ACORD or other state-approved form) supplied by the
contractor's insurance provider and bound in the construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available;to require the contractor to allow the construction to be
subject to inspection at any and all times by City inspection forces,to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed,and to make such laboratory
tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community facilities
to be installed hereunder.
City of Fort North,Texas
Standard Community Facilities Agreement-Park Vista Apartments
CFA Official Release Date:02.20.2017
Page 4 of I 1
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans,specifications and cost estimates supplied
by the Developer for this Agreement.
K. Developer agrees to provide,at its expense,all necessary rights of way and easements across
those portions of the Project property owned by Developer and required for the construction
of the current and future improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers,agents and employees
from all suits,actions or claims of any character,whether real or asserted,brought for
or on account of any injuries or damages sustained by any persons (including death)
or to any property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said Developer, its
contractors, subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers,agents or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers,agents and employees from and against any and all claims,suits or
causes of action of any nature whatsoever,whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from,or in any way connected with,the construction of the infrastructure contemplated
herein. Further, Developer will require its contractors to indemnify,and hold harmless
the City for any losses, damages, costs or expenses suffered by the City or caused as a
result of said contractor's failure to complete the work and construct the improvements
in a good and workmanlike manner,free from defects, in conformance with the Policy,
and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor,whether express or implied. Further,Developer agrees that all contracts with any
City of Fort Worth,Texas
Standard Community Facilities Agreement-Park Vista Apartments
CFA Official Release Date:02.20.2017
Page 5 of 11
contractor shall include provisions granting to the City the right to enforce such contracts as
an express intended third-party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent(2%)for a total of 4%of the Developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent(4%)and material testing fees equal to two percent(2%) for a total of 6%
of the Developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing
the streetlights,inspection fees equal to four percent(4%)of the Developer's share
of the streetlight construction cost as stated in the construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two-year
period, the Developer may request that the CFA be extended for one additional
year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two(2)years from the date of this Agreement(and any extension period)
the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
City of Fort Worth,Texas
Standard Community Facilities Agreement-Park Vista Apartments
CFA Official Release Date:02.20.2017
Page 6 of 11
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction,the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government
Code,the City is prohibited from entering into a contract with a company for goods or services
unless the contract contains a written verification from the company that it: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms
"boycott Israel" and "company" shall have the meanings ascribed to those terms in Section
808.001 of the Texas Government Code. By signing this contract, Developer certifies that
Developer's signature provides written verification to the City that Developer: (1)does not
boycott Israel; and(2)will not boycott Israel during the term of the contract.
IMMIGRATION AND NATIONALITY ACT
R. Developer shall verify the identity and employment eligibility of its employees who perform
work under this Agreement, including completing the Employment Eligibility Verification
Form(I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms
and supporting eligibility documentation for each employee who performs work under this
Agreement. Developer shall adhere to all Federal and State laws as well as establish
appropriate procedures and controls so that no services will be performed by any Developer
employee who is not legally eligible to perform such services. DEVELOPER SHALL
INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES,
LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY
DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR
LICENSEES. City, upon written notice to Developer, shall have the right to immediately
terminate this Agreement for violations of this provision by Developer. If City provides
written notice to Developer to provide City with copies of all 1-9 forms and supporting
eligibility documentation for each employee who performs work under this Agreement,
Developer shall have ten(10)business days to provide the documentation to the City.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Park Vista Apartments
CFA Official Release Date:02.20.2017
Page 7 of 11
Cost Summary Sheet
Project Name:Park Vista Apartments
CFA No.: CFA 18-0131 City Project No.: 10 1734
An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developers Cost
A. Water and Sewer Construction
1. Water Construction $ 68,932.39
2.Sewer Construction $ 47,981.35
Water and Sewer Construction Total $ 116,913.74
B. TPW Construction
1.Street $ 159,960.84
2.Storm Drain $ 477,325.42
3.Street Lights Installed by Developer $ -
4. Signals $
TPW Construction Cost Total $ 637,286.26
Total Construction Cost(excluding the fees): ®,20000
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 2,338.28
D. Water/Sewer Material Testing Fee(2%) $ 2,338.28
Sub-Total for Water Construction Fees $ 4,676.56
E. TPW Inspection Fee(4%) $ 25,491.45
F. TPW Material Testing(2%) $ 12,745.73
G. Street Light lnspsection Cost $ -
H. Signals Inspection Cost $
H. Street Signs Installation Cost $
Sub-Total for TPW Construction Fees $ 38,237.18
Total Construction Fees: $ 42,913.74
Choice
Financial Guarantee Options,choose one Amount Mark one
Bond=100% $ 754 200.00 x
Completion Agreement=100%1 Holds Plat $ 754 200.00
Cash Escrow Water/Sanitary Sewer-125% $ 146,142.18
Cash Escrow Paving/Storm Drain=125% $ 796,607.83
Letter of Credit=125%w/2yr expiration period $ 942 750.00
City of Fort Worth,Texas
Standard Community Facilities Agreement-Park Vista Apartments
CFA Official Release Date:02.20.2017
Page 8 of 11
ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
Westhouse Residences,LLC
By:
s J.Cha a(Jan 019) LIV Westhouse Partners, LLC
Jesus J. dapa it's Manager
Assistant City Manager
Date: Jan 28,2019
Recommended by:
(
Ro61fert 5 krurniaton III(Jan 25,2019)
Evelyn Robe 5(Jan 25,2019) Name: Robert B. Crumpton, III
Evelyn Roberts/Jennifer Ezernack Title: Manager
Project Assistant
Planning and Development Date: Jan 25,2019
Approved as to Form &Legality: Contract Compliance Manager:
Richard A. McCracKen By signing, I acknowledge that I am the
Richard A.McCracken(Jan 25,2019) person responsible for the monitoring and
Richard A. McCracken administration of this contract, including
Assistant City Attorney ensuring all performance and reporting
M&C No. NSA requirements.
Date:
9ar2ie Sca�Ce�tmorA ek
Form 1295: NI/A Janie Scarlett Morales(Jan 25,2019)
Name: Janie Morales
ATTEST: e: Development Manager
SORT .
MSN 7r�^ 0 .
Maryfyser(Jan2ac(,2019) `
Mary J. Kayser/Ronald Gonzales U
City Secretary/Assistant City Secre r
XC14'.i
City of Fort Worth,Texas
Standard Community Facilities Agreement-Park Vista Apartments
CFA Official Release Date:02.20.2017
Page 9 of I I OFFMAL RECORD
CITY SECRETARY
F'. WORTH,TX
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
® Location Map
® Exhibit A:Water Improvements
® Exhibit A-1: Sewer Improvements
® Water and Sewer Cost Estimates
® Exhibit B: Paving Improvements
® Paving Cost Estimate
® Exhibit B-1: Storm Drain Improvements
® Storm Drain Cost Estimate
❑ Exhibit C: Street Lights and Signs Improvements
❑ Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Park Vista Apartments
CFA Official Release Date:02.20.2017
Page 10 of 11
City of Fort Worth,Texas
Standard Community Facilities Agreement-Park Vista Apartments
CFA Official Release Date:02.20.2017
Page 11 of 11
00443
DM-BID PROPOSAL
Pota 1 ar3
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
r
Project Item Infomlation Bidden Proposal
No
Hidllem Unit of Bid
No. Description SpeaiitenlonSection No. Measure Quantity Unit Price Bid Value ;
UNIT I:WATER IMPROVEMENTS I
1 3305.0109 Trench Safety 33 05 10 LF 47 $1.11 $52.17
2 3311.0001 Ductile Iron Water Fittings w/Restraint 33 11 11 TN 0.6 $3,098.4 $1 859.09 f
3 3311.0261 4"PVC Water Pie 33 11 10,33 11 12 LF 5 $28.78 $143.90
4 3311.0261 8"PVC Water Pie 34 11 10.33 11 12 LF 16 $37.64 $602.24
5 3312.0117 Connection to Existing 4"-12"Water Main 32 12 25 EA 3 $1,741.31 $5,223,93
6 3312.2203 2"Water Service 33 12 10 EA 1 $3.514.73 $3,514.73 +
7 3312.4102 10"x6"Topping Sleeve•&Valve 33 12 25 EA 2 $4.428.00 $8,856.00
8 3312.4103 10"x8"Tapping Sleeve&Valve 34 12 25 EA 3 $4,483.3 $13,450.05
9 3312.4107 12"x8"Tapping Sleeve&Valve 351225 FA 4 $4,428.0 $17,7f2.00 t
10 3312.2802 4"Domestic Water Meter&Vault 331211 EA 1 ;13,837.50 $13,837.50
11 3312.2803 2"Domestic Water Meter Box 331210 FA 1 $3,614.73 $3,514.73
12 9999,0001 6"x4"Reducer 00 00 00 EA 1 $166.05 $166.05
TOTAL U I i-WATE I PROVEMENTS $68,932.39
UNIT It:SANITA Y SEWER MP V MENTS
1 3301.0002 Post-CCTV Inspection 330131 LF 545 $2.21 $1204.45
2 3301.0101 Manhole Vacuum Testing 33 01 30 FA 4 $719.55 $2,878.20
3 3305.0109 Trench Safely 330510 LF 545 $2.21 $1,204.45
4 3331.4115 8"Sewer Pipe 33 11 10,33 3112,33 3120 LF 545 $38.75 $21,118.75
5 3339.1001 4'Manhole 33 39 10,33 39 20 EA 4 $3,985.20 $15.940.80 (
6 3339.1003 4'Extra Depth Manhole 33 39 10,33 39 20 VF 14 $315.50 $4,417.00
7 9999.0002 Connect to Existing Manhole by Coring 000060 EA 1 $1,217.70 $1,217.70
TOTAL UWJ 11:SANITARY SEWER IMPLtOVEMENTSI $47,981.35
i
i
i
i
I
1
1
t
CITY OF FORT WORT" P.dc V&s A�pinwat
STANDMO COWJtt 7W SPECIFICATION DOCUMW13-DEVELOPER AWMWED PROJECTS atrPm1ailaa.WON
Fam Vurlon FebN•ry 16,2011 201111,a20rfdM Lbrt 6tfe.d�irpdMr+1 Q+ 'e
,
00 JI30
DM-BID PROPOSAL
Paea 2 er0 1
j
i
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
t
UNIT PRICE BID Bidder's Application
Projed Item IDfennation Bidders Proposal
Bidlist Item Unit 0f Bid
No. Description Specification Section No. Measare Quantity Unit Price Bid Value
UNIT III:DRAINAGE IMPROVEMENTS
1 3125.0101 SWPPP 2 1 Acres 31 25 00 LS 1 $5,534.79' 9
2 3341.0205 18"RCP,Class iii 3341 10 LF 150 $65.31EN$43,173.00
50
3 3349.4105 18"SET,1 pie 33 49 40 EA 2 $1,992.60
4 3137.0101 Concrete Ripra 3137 00 SY 1300 $33.2105 3137.0106 Medium Stone Ri ap,grouted 31 3700 SY 475 33.2156 9999.0003 Toewall(4'tall, 9"thick 000000 LF 615 $132 840TOTAL U I II:DRAINAGE IMPROVEMENTS $ 4 f
UNITIV:PAVI G ROVEMENTS
1 3211.0212 6"Flexible Base,Type B,GR-2 Travel Lanes 32 11 23 JSY
3418 $9.27 $31 684.86
2 3211.0400 Hydrated Ume(Travel Lanes) 32 1129 72 5157.66 $11,351.52
3 3211.0502 8"Lime Treatment(Travel Lanes) 321129 3418 $3.87 $13,227.66
4 3213.0106 11"Conc Pvmt Travel Lancs 32 13J3 2924 $102.54 $299.826.96 j
SUB TOTAL UNIT IV:PAVING IMPROVEMEN ITRAVEL LANE $356,091.00
5 3211,0212 6"Flexible Base,Type B,GR-2(Driveways) 321123 SY 686 $9.27 $8,359.22
6 3211.0400 Hydrated Lime Driveways 321129 TN 14 $162.73 $2,276.22
7 3211.0502 8"Lime Treatment Driveways 32 11 29 SY 686 $3.87 $2,654.82 1
8 3213.0106 11"Conc Pvmt(Driveways) 32 13 13 SY 609 $70.44 $42.897.96
SUBTATA U T IV:PAVING IMPROVE E TS DRIVEWAYS $54,190.22
9 3213.0301 4"Conc Sidewalk 32 13 20 SF 1 7713 $6.56 $50,597.28
SUB TOTAL NIT IV:PAVING IMPROVEMENTS S1DEWALKS) $50,597.28 {
10 3213.0501 Barrier Free Ramp,Type R-1 32 13 20 EA 4 $553.50 $2,214.00
11 0241.1100 Remove Asphalt Pvmt 02 4115 SY 787 $11.07 $8,712.09 #
12 9999.0004 Stop Sign&Post R1-1 00 00 00 EA 2 $387.45 $774.90 t
SUB TOTAL UNIT IV:PAVING IMPROVEMENTS MISC $11,700.99
13 3217.0003 4"BRK Pvmt Marking HAS 32 17 23 LF 5731 $0.50 $286.50
14 3217.0201 B"SLD Pvmt Markt HAS 33 17 23 LF 90 $0.60 $54.00
15 3217.1002 Lane Legend Arrow 341723 EA 1 $27.68 $27.68
16 3217.1004 Lane Legend Only 35 17 23 EA 1 $27.68 $27.68
17 3217.2102 REFL Raised Marker TY I-C 36 17 23 EA 5 $27.68 $138.40
18 3-217.2104 REFL Raised Marker TY Ii-C-R 37 17 23 EA 59 $27.68 $1,633.12
19 3110.0110 Remove and Transplant 6"Tree 31 10 00 EA 4 $553.50 $2,214.00
20 13292.0400 Seeding,H dromulch 32 92 13 SYJ 3170 $0.12 $364.55
TOTAL UNIT IV:PAVING IMPROVEMENTS $477,325.42
TOTAL UNIT V:STREET LIGHTING IMPROVEMENTS N/A
UNIT VI:TE6FEIC SIGNAL IMPROVEMENTS
TOTAL UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS NIA
CRY OPPORT WORTH PakYuu APatmeW
tRANDARD CO"TRUCTMN aPEC1PMATM DOCUMENTS-DEYSLOPRR AWA"1D PROJECTS Chi h*AWa 1017J4
Pam Veerim Fibmry 16,1019 201`IL02 ORSbe cw Rt*wA.J*ddW Quvdatn
is
OU 42 43
DAP.Olt)PROPOSAL
Paco 7 ora
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Description Specification Section No. '-lnit of Bid Unit Price Bid Value
No. Measure Quantity
Bid Summary _
UNIT I:WATER IMPROVEMENTS $68,932.39
UNIT IL SANITARY SEWER IMPROVEMENTS $47,981.35
UNIT III:DRAINAGE IMPROVEMENTS $477,325.42
UNIT IV:PAVING IMPROVEMENTS $159,960.84
UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS NIA
Total Construction Bid $754,200.00
This Did is submitted by the entity nanied below:
BIDDER: BY:
Jim Cooper Construrlian Company,Inc.
TITLE: �( V
DATE:
Contractor agrees to complete WORK for FINAL ACCEPTANCE ;1�?07 calendar drys after the dale when the
CONTILACT commences to rum as provided in the General
Conditions.
END OF SECTION
`s
CITY OF FO3r woltT1t Puk Visua Ayanments
. STANDAM)CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPERAWARDED PROIECTS City Ntjest Na 101724
i Form Versiao F<bmnry 16.2019 2019.11.0E OR-Silo Cnst Estinwtp Updated Qnmtitia
ILLA
A
IZ
S'A
4-
IL I
Gs F 0 N p k
,10-02 PRITAI E
-w-
SITE.
4
fir PP-lE
GOLDEN
TRIANGLE PP-16-031
CROSSING
_4 f
f-WP.Lkv*l
GTE BUSINESS
-012 MIS fE.I'M RAFK-
AE-Vtsx*
GTB
BUSINESS
-055 PARK GOLDEN
7. ,
rCFP 17
GTE BUSSINESS TRIANGLE
PARK ADDITION
ADDITION
Pp-14.-027
FP-14-058
GOLDEN
GmDEN
GOLDEN TRIANGLE
TRIANGLE
-%FUANGLE ADDITION
ADDITION
.w 59 FF-15-Ul1 ADDITION FP-15-126
ON REMINGTON urcE q
IER Ge
ri ai,.Mih-5(DpenstreetMap contributors,
fAL.L,l L
-�'tin'
F�G*
el 5p h,t\r. USDA,UsGGrr, A(�ki
h t66G. arap E-SlAirbus DS
'gilimbg,
C-4
t.3 VICINITY MAP.
NOT-TO-SCALE
CITY FIRM 101734
WATER PROD. 56008-0600430-101734-001580
SEWER PROJ. 56006-0700430-101734-001380
X-XXX)O(X
E ig, K-XXXXXX
CL ED
A�
Ln
e r-
4
DO
NJOB 140. 61175-00 VICINITY MAP EXHIBIT PAPE-DAWSON
0 DATE SEPT Zola
0 DESIGNER F0 ENGINEERS
PARK VISTA APARTMENTS rd
0 CHECKED_EP—DRAM PO
0 FORT WORTH I SAN ANTONIO I AUSTIN I HOUSTON I DALLAS
to 6500 WEST FWY,STE 700 1 FORT WORTH,TX 76116 1 817.870.3868
i) SHEET 1 OF FORT WORTH, TEXAS TEXAS BOARD OF PROPESSiOUAL ENGINEERS,FIRM REGISTRATION 4470
O
THIS DOCUMENT HAS BEEN PRODUCED FROM MATERIAL THAT WAS STORED AND/OR TRANSMITTED ELECTRDN:CAJ-LY AND MAY HAVE BEEN
INADVERTENTLY ALTERED. RELY ONLY ON FINAL HARDCOPY MATERIALS BEARING THE CONSULTANTS ORIGINAL SIGNATURE AND SEAL
KELLER HICKS ROAD
PROPOSED
B'WATER LINE i
CONNECTION PROPOSED
WATER LINE
CONNECTIONS
_ 10' X10'
_ WATER EASEMENT
SCALE: 1'=200'
0 200
r
II,
DETAIL = -
SCALE: 1' = 20' �� I
rn \ I I I
x
w
u- ( `
HANNA ROSE LN
U
r Z � I .
Lu Y
CV O I I
aloir
O + I
>D�
.N (L
� o
LEGEND —f
fV
EE PROPOSED WATER LINE — \O
oto
j
Gd
N JOB Na BIIzs-GD EXHIBIT A-WATER PAPE-DAWSON
DATE SEPT 2D18 ENGINEERS
DESIGNER PD PARK VISTA APARTMENTS rai
0 CHECKED PD DRAHM,P-P- FORT WORTH I SAII ANTONIO 1 AUSTIN I HOUSTON I DALLAS
(A 2 OF 5 FORT WORTH, TEXAS 5500 WEST FWV.STE 700 1 FORT WORTH.TI 70115 1517.570.0688
N SHEET TEXAS BOARD OF PROFESSIONAL ENGINEERS.FIRM REGISTRATION 4470
0
THIS DOCUMENT HAS BEEN PRODUCED FROM MATERIAL THAT WAS STORED AND/OR TRANSMITTED ELECTRONICALLY AND MAY HAVE BEEN
INADVERTENTLY ALTERED. RELY ONLY ON FlNAL HARDCOPY MATERIALS BEARING THE CONSULTANT'S ORIGINAL SIGNATURE AND SEAL
SCALE: 1'=200'
I
0 200 ❑
It
0
I `?s
1
}
t
PROPOSED u
8' SAN. SEWER
15' UTILITY EASEMENT
W HANNA ROSE LN I
w
Z I
� Y
JR 00
i ICY]
a ir
0 ROPOSED
0 I �-- /
8` SAN.
o
IL 0_t:
_ SEWER
15' UTILITY EASEMENT
z
LEGEND - - -
o PROPOSED SANITARY SEWER LINE
C.,; WITH FLOW ARROW
E PROPOSED SANITARY MANHOLE ---�--
0 In
N JOB NO. 51175-00
EXHIBIT Al -SEWER PAPE w
DAWSON
DATE SEPT 2015 M31 ENGINEERS
DESIGNER PD PARK VISTA APARTMENTS
p •• CHECKED ED DRAWN 'D FORT WORTH i SAN ANTONIO I AUSTIN I HOUSTON 1 DALLAS
1n 3 OF 5 6300 WEST FWY,STE 7001 FORT WORTH,TX 76116 1817.870.3884
N SHEET FORT WORTH, TEXAS TC%AS EOARD OF PROPESSIOIIAL HIOINEERS FIRM REGISTRATION 4470
o�
THIS DOCUMENT HAS BEEN PRODUCED FROM MATERIAL THAT WAS STORED AND/OR TRANSMITTED ELECTRONICALLY AND MAY HAVE BEEN
INADVERTENTLY ALTERED. RELY ONLY ON FINAL HARDCOPY MATERIALS BEARING THE CONSULTANTS ORIGINAL SIGNATURE AND SEAL
KELLE (_KS ROAD
CONNECT
TO EXISTING
SIDEWALK
SCALE: 1`a 200'
0 200 LIMITS OF
IIII I SIDEWALK
PROPOSED
a CONCRETE
PAVEMENT
•I ' PROPOSED R1-1
TOP SIGN
L7 PROPOSED
LEFT—TURN LANE
' PROPOSED
ADDITIONAL
5' SIDEWALK
I
LIMITS OF
I ' SIDEWALK
I
w
L � � di
i HANNA ROSE LN PROPOSED
L" Z ;` ADDITIONAL
Y I 12.5' LANES
r O ( ; !
w O
0
m PROPOSED
x I CONCRETE
g PAVEMENT
O L)
a d PROPOSED R1-1
LEGEND STOP SIGN
o L- y �---LIMITS OF
o PROPOSED SIDEWALK
PAVEMENT
O
CV /
1E/
M/
cx
cV j
N N JOB NO. 01175-00
,:.oDATE SEPT 2018 EXHIBIT B - PAVING PAPE DAWSON
DESIGNER PD PARK VISTA APARTMENTS F ENGINEERS
CHECKED PODRAWN,Q FORT WORTH I SAIL ANTONIO I AUSTIN 1 HOUSTON I DALLAS
Crn FORT WORTH TEXAS 8500 WEST M,STE 7001 FORT WORTH,TX 7111181 817.870.0888
N sir 4 OF 5 ! TEXAS BOARD OF PROPBSSIWIAL BtIOINEBRS,FIRU RCOISTRATION 1170
THIS DOCUMENT HAS BEEN PRODUCED FROM MATERIAL THAT WAS STORED AND/OR TRANSMITTED ELECTRONICALLY AND MAY HAVE BEEN
INADVERTENTLY ALTERED, RELY ONLY ON FINAL HARDCOPY MATERIALS BEARING THE CONSULTANTS ORIGINAL SIGNATURE AND SEAL
A
t \
I
SCALE: 1"=200' o
O 200ji
r' 1
r
� til
,_r77:,
HANNA ROSE N
Z
PROPOSED
I 24" RCP
Li IZ
LEGEND
7 -``�
PROPOSED STORM DRAIN
m
PROPOSED SAFETY END
c3i ® TREATMENT HEADWALL
r
E�
..n
rn/
s JW ND. 01175-DD EXHIBIT B1 - STORM DRAIN PAPE-DAWSON
l X DATE SEPT 201G ENGINEERS
DESIGNER PO PARK VISTA APARTMENTS rd
N CHECKED�-DRAWN-M FORT WORTH 1 SAN ANTONIO 1 AUSTIN I HOUSTON I OALLAS
H SHEET 5 OF 5 FORT WORTH, TEXAS 1300 WEST F.OF RO SSI I FORT WORTH, FI 71111 1817.870.3668
� � TEXAS BOARD OF PROI'WSIOIIAL lNOINS[II!FUM RC019TRAT1011 I470
v r
o LL
THIS DOCUMENT HAS BEEN PRODUCED FROM MATERIAL THAT WAS STORED AND/OR TRANSMITTED ELECTRONICALLY AND MAY HAVE BEEN
INADVERTENTLY ALTERED. RELY ONLY ON FINAL HARDCOPY MATERIALS BEARING THE CONSULTANT'S ORIGINAL SIGNATURE AND SEAL