HomeMy WebLinkAboutContract 49932-A2 RECEIVED 72019 AMENDMENT NO-2 CONTRACT NORI/
7 20- 49 9, a-�a
FEBF
CIN OF FORT WORTH
CITY SECRETARY TO CITY SECRETARY CONTRACT No. 49932
WHEREAS, the City of Fort Worth (CITY) and Dunaway Associates, LP,
(ENGINEER) made and entered into City Secretary Contract No. 49932, (the
CONTRACT) which was authorized on the 17 day of November, 2017 in the
amount of $ 58, 825 . 00; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment Number
1 in the amount of $ 21, 700 . 00 which was authorized October 10, 2018; and
WHEREAS, the CONTRACT involves engineering services for the
following project :
HAMMOND STREET DRAINAGE IMPROVMENTS - FINAL DESIGN AND CONSTRUCTION
PHASE SERVICES; and
WHEREAS, it has become necessary to execute Amendment No. 2 to the
CONTRACT to include an increased scope of work and revised fee .
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1 .
Article I of the CONTRACT is amended to include the additional
engineering services specified in a proposal dated December 18, 2018, a
copy of which is attached hereto and incorporated herein. The cost to
City for the additional design services to be performed by Engineer
totals $19, 350 . 00 . (See Attached Funding Breakdown Sheet, Page -3-)
2 .
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $99, 875 . 00 .
3 .
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect .
City of Fort Worth �K �;����� ���®��
Professional Services Agreement Amendment No.2 Hammond Road CS49932 '
CFW Official Release 9/19/2017 I Cll uY SECRETARY
Page 1 of 4
FT `FORTH,'TX
EXECUTED and EFFECTIVE as of the date last written by a signatory,
below.
APPROVED:
City of Fort Worth ENGINEER
"- DunawaAssoci es,
Susan lanis o W i t PE, FM
Assistant City Manager scip ne Lead II
DATE: ItI DATE:
AOVACOMMEND
Stephen ooke
Interim Director, Transportation & Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements .
Mik Be nett, PE, PMP
Project Manager
City of Fort Worth
Professional Services Agreement Amendment No.2 Hammond Road CS49932 OFFICIAL RECORD
CFW Official Release 9/19/2017
Page 2 of 4 CITY SECRETARY
FT. WORTH,TX
APPROVED AS TO FORM AND LEGALITY: M&C:JN2�
Date :
Douglas . Black
Assistant City Attorney
Aa.arJKayser
xj4t- 61� 0:
City Secretary
City of Fort Worth
Professional Services Agreement Amendment No.2 Hammond Road CS49932 OFFICIAL RECORD
CFW Official Release 9/19/2017
Page 3 of 4 CITY SECRETARY
FT WORTH,TX
FUNDING BREAKDOWN SHEET
City Secretary No. 49932
Amendment No. 2
Department Fund-Account-Center Amount
TPW 52002-0200431-5330500-C00488-CO2830 $19, 350 . 00
Total : $19, 350 . 00
City of Fort Worth
Professional Services Agreement Amendment No.2 Hammond Road CS49932
CFW Official Release 9/19/2017
Page 4 of 4
DUNAWAY
Dunaway No. 2006041.003
Firm Registration #10098100
December 18, 2018
Mike Bennett, PE, PMP
Transportation and Public Works Department
City of Fort Worth
200 Texas Street,
Fort Worth, 76102 Via e-mail: Mike.Bennett@forthworth.gov
Reference: Proposal for Professional Engineering Services
Hammond Road Drainage Improvements
Amendment No. 2 to Contract No. 49932
Mr. Bennett:
Dunaway Associates, L.P. (Dunaway) is pleased to submit for your consideration this proposal
for additional professional engineering services on the above-referenced project. Based upon
your request for the extension of existing proposed storm sewer in Timothy Road south of
Spurgeon St, Fort Worth, Texas, we believe the following scope of professional services will
address the City of Fort Worth (Client) needs for this project.
Executive Fee Summary
1. Topographic Survey..............................................................$4,250.00 Hourly Not to Exceed
2. Construction Documents.......................................................$6,490.00 Hourly Not to Exceed
3. Subsurface Utility Exploration (SUE).....................................$8,610.00 Hourly Not to Exceed
Total: Hourly Not to Exceed Services $19,350.00
FEE
Dunaway proposes to provide the scope of work described below for a fee as shown above. All
administrative and application fees required by review authorities will be paid by the Dunaway
and are included in Dunaway's proposed fee. Please find attached to this proposal our Standard
Terms & Conditions for professional services, which is also a part of this proposal.
DETAILED SCOPE OF WORK
1. Topographic Survev
Dunaway will provide a topographic survey of Timothy Road from Right of way to Right of way
One-foot interval contours will be developed based on the results of the measurements taken.
Existing visible utility facilities will be located and depicted on the face of the survey along with
other visible improvements situated within the defined area. The vertical datum on which the
elevations are based will be The vertical datum on which the elevations will are based will be
the City of Fort Worth.This proposed Topographic Survey data will be blended and supplement
Corporate: 550 Bailey Avenue,Suite 400 9 Fort Worth,Texas 76107 Tel:817.335.1 121 S Fax:817.335.7437 - dunawayassociates.com
Fort Worth - Austin Midland - San Antonio
Proposal for Professional Engineering Services
Hammond Road Drainage Improvements—Amendment No. 2
Page 2
existing survey which Dunaway has already obtained as part of the base scope of the
Hammond Road Drainage Improvements project.
2. Construction Documents
Dunaway will prepare construction documents for the public infrastructure improvements
required for this project. The anticipated improvements consist of two inlets, laterals, and
extension of the existing proposed stormwater trunk line in Timothy to connect to the proposed
laterals. Design will include basic hyrologic and hydraulic calculations and review Existing
proposed inlets See attached exhibit. As part of design, one (1) alternate configuration of
junction boxes and inlets will be considered. These construction documents will be signed and
sealed by a Registered Professional Engineer licensed in the State of Texas and will be
processed with the City of Fort Worth for approval and construction.A tentative list of drawings
anticipated to be created follows:
Storm Drain Layout(Revision to Sheet No. 17)
Storm Drain Profiles(Revision to Sheet No. 20)
POL Sheet showing new extents of pavement(Revision to Sheet No. 23)
Dunaway proposes to address up to one (1) round of review comments from City staff. If
additional comments are made by City staff that are not indicative of design deficiencies
caused by the design team, the time required to revise and resubmit the study will be
tracked and billed on an hourly basis and is not a part of this proposed scope of work.
3. Subsurface Utility Exploration (SUE)—Dunaway has solicited a bid for a subsurface utility
exploration (SUE) for this project by SurvWest. The SUE will identify franchise & public
utility locations and potential conflicts with the proposed project. This work will be
coordinated with the topographic survey to minimize utility conflicts during construction
and increase the accuracy of the construction documents. Construction documents will
show utilities in their relocated state.
The scope of this proposal includes Quality Level "B"SUE along the proposed stormwater
alignment. Utilities will be designated from right of way to right of way within the proposed
street alignment. Designating of utilities on the private/city property adjacent to this
proposed roadway extension is also included in the scope of work of this proposal. Utilities
to be designated include both city (water, sanitary sewer, storm drains) and franchise
(telecommunications, electric, gas, etc.) utilities. Quality Level "A" SUE is also included in
the scope of work. For the purpose of this proposal, we have assumed that three (3) test
holes will be required.
Only those services specifically mentioned in the Scope of Work section are offered as a part of
this proposal.
ADDITIONAL SERVICES
The following is a partial list of services that are not anticipated to be required for your project and
are not proposed to be provided by Dunaway. Some of these services can be provided if they are
desired or if it is later determined that they are necessary. In general, additional services will be
authorized either by a contract amendment or a separate proposal.
Fort Worth - Austin a Midland m San Antonio
dunowayassociates.c om
Proposal for Professional Engineering Services
Hammond Road Drainage Improvements—Amendment No. 2
Page 3
1. Boundary Survey beyond the right-of-way of Timothy Road
2. Survey services such as as-built surveys, platting and easements by separate instrument.
3. Revisions to drainage area map, Infoworks modeling revisions or verifications.
4. Franchise utility relocation coordination
5. ISWM revision and/or resubmittal
6. Public meetings
If this proposal meets with your approval, please indicate so by signing below and returning one
copy to our office as our notice to proceed. We appreciate the opportunity to assist you with this
project and look forward to its success.
Respectfully submitted,
Josh Wright, PE, CFM
DUNAWAY ASSOCIATES, L.P.,
a Texas limited partnership
Jo Wright, PE, CFM
Discipline Lead II
Attachment: Standard Terms & Conditions
JDW/kmg
Fort Worth — Austin Midland z San Antonio
dunawayassociates.com