Loading...
HomeMy WebLinkAboutContract 35138-A3 CITY SECRUARY AMENDMENT No.3 CCWMCT?107� r TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and EJES, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 35138, (the CONTRACT) which was authorized by M&C C-22015 on the 20th day of March, 2007 in the amount of $160, 650 . 00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $20, 560.00 which was administratively authorized and Amendment No. 2 in the amount of $9, 905. 00 which was administratively authorized on August 3, 2011; and WHEREAS, the CONTRACT involves engineering services for the following project: Water and Sanitary Sewer Replacement Contract 2005, WSM--L; and WHEREAS, it has become necessary to execute Amendment No.3 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated August 28, 2013, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $12,060. 00. 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $203, 175.00. OFFICIAL RECORD I:.it7 O 3 A 13 a i d CITY SECRETARY page - - FT WORTI19 TX 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth EJES, Inc. Fernando Costa Edwin B. Jones, P.E. Assistant City Manager President DATE, 9 sc ., DATE: 7,7(-�J S. Frank Crumb, P.E. Director, Water Department APPROVED AS TO FORM AND LEGALITY: M&C: N/A Date: N/A h 1 r L h e l f t YY1. J-rG - Assistant City Attorney ATTEST: 7 FO 0 Mary J. er l � City Secr terry o� �fAS OFFICIAL RECORD CITY SECRETARY Page _ _ FT. WORTH, TX CORPORATE OFFICE •Architectural 12655 N.Central Expy., Suite 500 • Engineering Dallas, Texas 75243 • Planning Phone: 214 343-1210 ■Construction Management I N c o R P v a n r e o Fax:214 343-3$85 • Environmental Services ■ IT Services Service With Excellence August 28, 2013 Rakesh Chaubey, P.E. City of Fort Worth Water Department Engineering & Fiscal Services Division 1000 Throckmorton Street Fort Worth, TX 76102-6311 817-392-6051 RE: Amendment No. 3 Water& Sanitary Sewer Replacement Contract 2005, WSM-L City Project No. 00388 Colonial Parkway— Country Club Cir. to Park Hill Dr. Dear Mr. Chaubey: Per your request we are pleased to submit this Amendment No. 3 for additional design services required to complete the above referenced project, The requested modifications will be outside of our scope of services as set forth in City Secretary Contract No. 35138 and as amended by City Secretary Contract No. 35138- A2, therefore this Amendment No. 3 is being developed to further identify these services and summarize the associated costs. The additional services required to prepare final construction documents will include the following: • Modify design to add 8"water line replacement from existing 8"water line on Colonial Parkway south of Country Club Circle to Park Hill Drive • Modify remaining plan sheets to conform to new sheet numbering,project limits and construction notes • Revise contract documents&specifications • Revise summary of quantities and cost estimate ■ Obtain Topographic Survey We are requesting your assistance in the execution of this Amendment No. 3 in order for us to expeditiously perform these services. The attached EXHIBIT I, outlines the additional tasks, personnel and man-hours we anticipate to be required to make the requested revisions to the construction documents. The total fee for these additional services will bean amount not to exceed 112,060. In order to avoid any further delay in the project schedule, EJES, Inc. will proceed to make the requested revisions outlined above at this time. Fort Worth Houston Shrevenort 7524 Mosier View Court, Suite 104 525 N. Sam Houston Pkwy. 6047 Financial Plaza, Suite 511 Fort Worth, TX 76118 Suite 440 Shreveport, LA 71129 (817)284-2640 Houston, TX 77060 (318)670-7275 (28 t)272-1612 Page 2 These Amendment No. 3 services will be performed with the good faith understanding that an executed agreement for additional compensation is forthcoming and will be received prior to submittal of the final documents. The total contract amount to date, including amendments, is as follows: Original Contract Amount = $160,650.00 Amendment No. 1 = $20,560.00 Amendment No. 2 = $9,905.00 Amendment No. 3 = $12.060.00 New Contract Amount = $203.175.00 If you have any questions or require additional information, please contact me at 214-343-1210, Ext. 133. Sincerely, Edwin B. Jones, P.E., President EJES, Inc. 12655 N. Central Expressway, Suite 500 Dallas, TX 75243 Tel: 214-343-1210 ejones@ejesinc.com Attachment