Loading...
HomeMy WebLinkAboutContract 35348-A1 AMENDMENT NO. 1 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. COUNTY OF TARRANP b WHEREAS, the City of Fort Worth (City) and HDR, Inc. , (Engineer) made and entered into City Secretary Contract No. 35348, (the Contract) which was authorized by the City Council by M&C C-35348 on the 21st day of June, 2007; and WHEREAS, the Contract involves engineering services for the following project: Mercado Channel Improvements, Project No. 00779: DOE No. 5682 WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article 1, of the Contract is amended to include the additional engineering services specified in a proposal letter dated May 7, 2009, copies of which are both attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $ 24,605.00. 2. Article II, of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $ 79,465.00. 3 . All other provisions of the Contract which are not expressly OFFICIALRECOK0 CITY SECRETARY FT.WORTH,TX amended herein shall remain in full force and effect. EXECUTED on this the 1 I{ day of 2 o09, in Fort Worth, Tarrant County, Texas. ATTES ENO: M&( 11 Hendrix RED City Secretary APPROVAL RECOMMENDED: APPROVED: William . Ver st■ P.E. Fernando Costa Director, Department of Assistant City Manager 7",',or Public Works Engineer Name: De 2 0 � � Z APPROVED AS TO FORM AMD LEGALITY: qhu Assistant 'Cl t, rney OFFICIAL RECORD flTY SECRETARY FT,WORTH,TX So lie tio ns- May 7, 2009 Ms. Linda Young, PE Storm Water Management Transportation and Public Works Department City of Fort Worth 1000 Throckmorton Street Fort Worth, Texas 76102 RE: Amendment No. 1 Storm Water Utility Projects-Mercado Channel City Project Number 00779 Dear Ms. Young: On June 21, 2007 the City of Fort Worth authorized HDR to provide a hydrologic and hydraulic study of Mercado Channel. The original scope included a study of Mercado Creek beginning at its confluence with Marine Creek. The scope included the establishment of a hydrologic and hydraulic model of the channel based on current or existing conditions. Upon completion of the model, the scope provided for a report which would outline three alternative designs that would mitigate the known flooding in the area. The original scope did not include models of the proposed alternatives, the new box culverts installed at NE 21't and 22"d Street, nor FEMA CLOMRILOMR applications or USACE environmental permitting. A report was submitted to the City in accordance with the original scope and a final review meeting was held on August 11, 2008 to discuss the recommendations. In attendance at this meeting were: Mike Owens - CFW, Steve Eubanks - CFW, Richard Argomaniz — CFW, Kathy Berek — HDR, and Rodrigo Vizcaino — HDR. The City requested the contract be amended to include the proposed detention pond upstream [data to be provided by the City], the new box culverts at NE 2151 and 22"0, and three design alternatives as directed by Steve Eubanks. In response, this request for an amendment seeks to revise the scope of work of the previously approved Storm Water Utility Projects, City Secretary Contract No. 00779 Design Pians and Contract Documents. The work to be included will augment the channel improvement evaluations and the designs associated with the original contract. The specific works to be included in this amendment are as follows: Determine maximum flows assuming detention upstream of the study area on Marine Park to avoid overland flooding beyond the top of banks. The conceptual data related to this pond will be provided by the City. It is assumed, per Mr. Steve Eubanks' direction, that the design of an adequate detention basin to match these calculated flows will be conducted at a later date. HDR Engineering,Inc. 210 E.31d Street Phone:(817)333.2800 $uRa 300 Fax:(817)333-2818 Fort Worth,TX 76102-4002 www.hdrinc.com • A maximum of 3 conceptual alternatives intended to resolve the flooding and overtopping shown in the conceptual flood study report of existing conditions submitted in November, 2007 will be modeled and evaluated. These alternatives will include a natural or bio-engineered channel, a flexible pavement channel, and/or a gabion lined channel. Each alternative may incorporate the following: o Conceptual design layout of channel areas to be improved. o Hydraulic modeling with gabion lining at areas of improvement. o Hydraulic modeling with grass lined stream bed, stabilized bank vegetation and bio-engineered to enhance sustainability. ❑ Modeling with flexible pavement lining at areas for improvement. o Document results and meet with the City to discuss the best alternative. • Model and Upgrade boxes at 21st and 22n4 Streets as directed by Mr. Steve Eubanks. o Determine necessary culvert box size to avoid overtopping of street assuming detained flows as mentioned in the first bullet point of this document. Schedule HDR assumes that it will take approximately six to seven weeks to prepare and submit the technical report and exhibits associated with this drainage study. Deliverables ➢ HDR will provide the City with a detailed report and exhibits for their review. Key Understanding Proper project management will allow for good communication during the project and promote the integration of teamwork between client, contractor and consultant. This scope of work is for study purposes only and does not include any design or construction fees. A scope and fee proposal will need to follow this study. Fee Estimate HDR is proposing to complete services and deliverables outlined above for a lump sum fee of $24,605.00. This fee does not include any additional City review fees and/or any additional surveying fees. Invoices will be sent monthly and will be based on a percent complete of the lump sum fee. HOR Engineering.Inc. 210 E.3rd Street Phone:(817)333-2806 Suite 300 Fax:(817)333-2818 Fort Worlh,Tx 76102.4602 www.hdrinc.00m 0 N E C 0 M PA N Y I YW,,,�y S,he tio ns- HDR's fees for the aforementioned services are itemized below: Conceptual layout of design alternatives = $ 4,925.00 Hydraulic modeling of 3 different alternatives = $ 13,015.00 Analysis and documentation of results and City meetings = $ 6,215.00 Expenses = $ 450.00 Total Contract Amendment No. 1 Value: = $ 24,605.00 Contract value revisions are as follows: Original Awarded Contract Fee in 2007: $54,860.00 Amendment request No. 1: $ 24,605.00 TOTAL CONTRACT AMOUNT $79,465.00 If you have any questions or there is additional documentation needed for this scope of work, please contact Mr. Gary Lee McKay, PE at (817) 333-2802. We look forward to your response at your earliest convenience. - e , Dennis Schulze, PE Gary Lee McKay, P.E., CFM Vice President Water Resources Program Manager HOR Engineering,Inc. 210 E.3,dStreet Phone:(817)333-2800 5uRe 300 Fax:(817)333.2818 Fart Worth,TX 78102-4002 www.hdrinc.com