HomeMy WebLinkAboutContract 46252-FP1 Department of TPW ConstAServices
CPN#O Vo-5O`*4' Date
' Project Manage �' - RT WO RT�I®
Risk Management S. Gatewood CITY SECRETARY
D.O.E. Brotherton L CONTRACT NO.
4z
Water V. Gutzier
CFA Janie Morales/Scanned ❑
ki rATION AND PUBLIC WORKS 6 - C 6:21<0
The�din*people have been Contacted concerning the request )F PROJECT COMPLETION5 oZ S oL
for final payment&have released this project for such payment
Ci Project Ne: 02144
Clearance Conducted B Etta Bac _ 6Q I -I C)g a
Regarding contract 46252 for BELLAIRE WATER& SEWER IMPROVEMENTS-WATER DEPARTMENT
as required by the WATER DEPARTMENT as approved by City Council on 12/09/14 through M&C C-27132 the
director of the WATER DEPARTMENT upon the recommendation of the Assistant Director of the Transportation&
Public Works Department has accepted the project as complete.
Original Contract Prices: $4,172,626.00
Amount of Approved Change Orders: $469,865.75 Ns 1
Revised Contract Amount: $4,642,491.75
Total Cost Work Completed: $4,0755533.25
LessF Deductions:
Liquidated Damages: Days @$210.00/Day
Pavement Deficiencies:
Total Deduction Amount: $0.00
Tot4t Cost Work Completed: $4,075,533.25
I
Les,Previous Payments: $3,898,425.47
Final Payment Due $177,107.78
Recommended for Acceptance Date
Asst. Director, TPW - Infrastructure Design and Construction
dE
Accepted Date
Asst. Director, WATER DEPARTMENT
.cam
Asst. City Manager Date
Comments:
w
\a'D
,9Q�� OFFICIAL RECORD
CITY SECRETARY
°"c� FT. WORTH,TX
.L L
FEB 0 7 2019
.i ,. - 59 Cis r. Co
City Project Numbers 02144 ?j_ -• DOE Number 709 �J
Contract Name BELLAIRE WATER&SEWER IMPROVEMENTS Estimate Number 54
Contract Limits Payment Number 54
Project Type WATER&SEWER For Period Ending 11/30/2018
Project Funding
Project Manager Sauceda City Secretary Contract Number 46252
Inspectors RODGERS / CROWLEY Contract Date 12/9/2014
Contractor CONATSER CONSTRUCTION TxLP Contract Time 845 CD
5327 WICHITA ST Days Charged to Date 1025 CD
FORT WORTH, TX 76119 Contract is .000000 Complete
CITY OF FORT WORTH PQ # ��
SUMMARY OF CHARGES INVOICE 52" -- 59
Line Fund Account Center Amount Gross Retainage Net
Funded
1 1(�c,I Cy21 U�I 75 GYM Zo (�S,cI�SZ•u + !S J. s l _ y/
SJ�'1e0�—C!ff7[QLI3L Tl�S�—uo 1Z,C31-1. 75 -1- Z_O M'
Total Cost of Work Completed $4,075,533.25
Less %Retained $0.00
WATER D Net Earned $4,075,533.25
ENGINEERING ANDARTA9ENT
FISC AL SERVICES Earned This Period $177,107.78
Contact Person- li.ather Oakes- _,
D a t ApP at tgnarure for:E�t 5252 Retainage This Period $0.00
DEPARTMENTCHECK PICKUP Less Liquidated Damages
YES 0 0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $3,898,425.47
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $177,107.78
Tuesday,January 29,2019 Page 8 of 8
FORTORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name BELLAIRE WATER&SEWER IMPROVEMENTS
Contract Limits
Project Type WATER&SEWER
City Project Numbers 02144
DOE Number 7092
Estimate Number 54 Payment Number 54 For Period Ending 11/30/2018
CD
City Secretary Contract Number 46252 Contract Time 84ED
Contract Date 12/9/2014 Days Charged to Date 1025
Project Manager Sauceda Contract is 88.000 Complete
Contractor CONATSER CONSTRUCTION TxLP
5327 WICHITA ST
FORT WORTH, TX 76119
Inspectors RODGERS / CROWLEY
Tuesday,January 29,2019 Page 1 of 8
City Project Numbers 02144
DOE Number 7092
Contract Name BELLAIRE WATER&SEWER IMPROVEMENTS Estimate Number 54
Contract Limits Payment Number 54
Project Type WATER&SEWER For Period Ending 11/30/2018
Project Funding
Unit IA-Water Improv-P253-541200-609170214483
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
IA 3311.064124"Water Pipe-Steel 2774 LF
1B 3311.064124"Water Pipe-Ductile I 2774 LF
1C 3311.064124"Water Pipe-PVC 2774 LF $150.00 $416,100.00 2768 $415,200.00
2 3311.065124"DIP Water 113 LF $155.00 $17,515.00 40 $6,200.00
3 3311.0561 16"PVC C905 Water Pipe CO#5 2020 LF $97.50 $196,950.00 1935 $188,662.50
4 3311.0461 12"PVC Water Pipe 1260 LF $65.00 $81,900.00 1410 $91,650.00
5 3311.0451 12"DIP Water 167 LF $95.00 $15,865.00 100 $9,500.00
6 3311.0452 12"DIP Water,CSS Bacicfil 201 LF $120.00 $24,120.00 135 $16,200.00
7 3311.0261 8"PVC Water Pipe 162 LF $60.00 $9,720.00 112 $6,720.00
8 3311.0161 6"PVC Water Pipe CO#5 230 LF $50.00 $11,500.00 117 $5,850.00
9 3305.1104 24"Casing by Other than O 60 LF $500.00 $30,000.00
10 3305.1103 20"Casing by Other than 0 59 LF $450.00 $26,550.00 59 $26,550.00
11 3305.2004 12"Water Carrier Pipe 60 LF $90.00 $5,400.00 60 $5,400.00
12 3305.2002 8"Water Carrier Pipe 59 LF $65.00 $3,835.00 161 $10,465.00
13 0241.1353 Salvage 20"Water Valve 2 EA $3,000.00 $6,000.00 1 $3,000.00
14 0241.1510 Salvage Fire Hydrant 2 EA $500.00 $1,000.00 2 $1,000.00
15 0241.1511 Salvage 3/4"Water Meter 9 EA $200.00 $1,800.00 9 $1,800.00
16 0241.1512 Salvage 1"Water Meter 18 EA $100.00 $1,800.00 16 $1,600.00
17 0241.1513 Salvage 1 1/2"Water Mete 2 EA $300.00 $600.00 2 $600.00
18 0241.1514 Salvage 2"Water Meter 3 EA $350.00 $1,050.00 2 $700.00
19 0241.1209 10"-20"Water Abandonme 10 EA $1,500.00 $15,000.00
20 0241.1203 8"Water Abandonment Plug 9 EA $1,000.00 $9,000.00 1 $1,000.00
21 3312.3008 24"Gate Valve w/Vault 3 EA $26,000.00 $78,000.00 4 $104,000.00
22 3312.3006 16"Gate Valve w/Vault CO#5 3 EA $18,000.00 $54,000.00 4 $72,000.00
23 3312.3005 12"Gate Valve 4 EA $2,000.00 $8,000.00 4 $8,000.00
24 3312.3003 8"Gate Valve 3 EA $1,100.00 $3,300.00 3 $3,300.00
25 3312.3002 6"Gate Valve CO#5 8 EA $1,000.00 $8,000.00 8 $8,000.00
26 3312.6002 6"Blow Off Valve 2 EA $6,500.00 $13,000.00 2 $13,000.00
27 3312.1002 2"Combination Air Valve A 2 EA $8,000.00 $16,000.00 2 $16,000.00
28A 3304.0002 Cathodic Protection for 24 1 LS
28B 3304.0002 Cathodic Protection for 24 1 LS $2,000.00 $2,000.00
Tuesday,January 29,2019 Page 2 of 8
City Project Numbers 02144 DOE Number 7092
Contract Name BELLAIRE WATER&SEWER IMPROVEMENTS Estimate Number 54
Contract Limits Payment Number 54
Project Type WATER&SEWER For Period Ending 11/30/2018
Project Funding
29 3312.0001 Fire Hydrant CO#5 6 EA $3,000.00 $18,000.00 6 $18,000.00
30A 3311.0001 Ductile Iron Water Fitting CO#5 29.7 TO $4,000.00 $118,800.00 24.2 $96,800.00
30B 3311.0011 Steel Fittings 1 LS
31 3312.0108 Connection to Existing 16"CO#5 3 EA $4,000.00 $12,000.00 3 $12,000.00
32 3312.0117 Connection to Existing 4"-CO#5 19 EA $2,000.00 $38,000.00 12 $24,000.00
33 3304.0101 Temporary Water Services 1 LS $40,000.00 $40,000.00 1 $40,000.00
34 3312.2002 1"Bored Water Service 1 EA $4,000.00 $4,000.00 1 $4,000.00
35 3312.2003 1"Water Service CO#5 27 EA $1,500.00 $40,500.00 19 $28,500.00
36 3312.2103 1 1/2"Water Service 2 EA $2,500.00 $5,000.00 2 $5,000.00
37 3312.2203 2"Water Service 3 EA $3,500.00 $10,500.00 3 $10,500.00
38 3312.2001 1"Water Service,Meter R CO#5 28 EA $600.00 $16,800.00 28 $16,800.00
39 3312.2101 1 1/2"Water Service,Met 2 EA $700.00 $1,400.00 2 $1,400.00
40 3312.2201 2"Water Service,Meter 3 EA $800.00 $2,400.00 2 $1,600.00
41 3216.0102 7"Cone Curb and Gutter 200 LF $30.00 $6,000.00 165 $4,950.00
42 3213.0301 4"Cone Sidewalk 40 SF $5.00 $200.00 266 $1,330.00
43 3213.0401 6"Concrete Driveway 480 SF $8.00 $3,840.00
44 3216.0301 9"Cone Valley Gutter,Res 5 SY $80.00 $400.00 4 $320.00
45 3213.0104 9"Cone Pvmt 1329 SY $75.00 $99,675.00 2146 $160,950.00
46 3211.0502 8"Lime Treatment 1476 SY $4.00 $5,904.00 2679 $10,716.00
47 3211.0400 Hydrated Lime 25.1 TN $200.00 $5,020.00 25 $5,000.00
48 3201.0616 Cone Pvmt Repair,Arterial CO#5(CO 2914 SY $60.00 $174,840.00 106 $6,360.00
49 3201.0112 5'Wide Asphalt Pvmt Repai 2080 LF $50.00 $104,000.00 2087 $104,350.00
50 3201.0123 6'Wide Asphalt Pvmt Repai 178 LF $60.00 $10,680.00 169 $10,140.00
51 3201.0202 Asphalt Pvmt Repair Beyond 106 SY $20.00 $2,120.00 21 $420.00
52 3201.0400 Temporary Asphalt Paving R 78 LF $30.00 $2,340.00 327 $9,810.00
53 3305.0109 Trench Safety 6577 LF $4.00 $26,308.00 6527 $26,108.00
54 3292.0100 Block Sod Placement 144 SY $10.00 $1,440.00 600 $6,000.00
55 3305.0202 Imported EmbedmentBackfil 25 CY $95.00 $2,375.00
56 3305.0204 Imported EmbedmentBackfil 25 CY $65.00 $1,625.00
57 0241.2001 Grouting for Water Lines t 29 CY $200.00 $5,800.00
58 0330.0001 Concrete Encase Pipe 5 CY $250.00 $1,250.00
59 3305.0103 Exploratory Excavation of 10 EA $600.00 $6,000.00 10 $6,000.00
60 3471.0001 Traffic Control 5 MO $4,000.00 $20,000.00 5 $20,000.00
61 3125.0101 SWPPP >1 acre 1 LS $5,000.00 $5,000.00 1 $5,000.00
Tuesday,January 29,2019 Page 3 of 8
City Project Numbers 02144 DOE Number 7092
Contract Name BELLAIRE WATER&SEWER IMPROVEMENTS Estimate Number 54
Contract Limits Payment Number 54
Project Type WATER&SEWER For Period Ending 11/30/2018
Project Funding
62 24"VALVE INTO VAULT CO#2 1 EA $53,500.00 $53,500.00 1 $53,500.00
63 16"VALVE WITHOUT VAULT CO#2 1 EA $15,800.00 $15,800.00 1 $15,800.00
64 INSERT 24"X 24"TEE CO#2 1 LS $12,800.00 $12,800.00 1 $12,800.00
65 REMOVE SUBGRADE FOR 11"PAVEMENT 1 LS $5,200.00 $5,200.00 1 $5,200.00
CO#2
66 11"CONCRETE REPLACEMENT CO#2 120 SY $94.00 $11,280.00 120 $11,280.00
67 11"CONCRETE REPLACEMENT CO#2 1050 SY $94.00 $98,700.00 1050 $98,700.00
68 CUT IN 20 INCH GATE VALVE(CO#6) 1 LS $42,152.00 $42,152.00 1 $42,152.00
69 INSTALL WHIP-DOWN ON 20 INCH WATER 1 LS $18,000.00 $18,000.00 1 $18,000.00
LINE(CO#6)
0 1-INCH BLOW OFF WITH MH(C#6) 1 LS $5,500.00 $5,500.00 1 $5,500.00
Sub-Total of Previous Unit $2,113,154.00 $1,915,383.50
Unit 113-SS Improv-P258-541200-709170214483
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 3331.440130"Sewer Pipe 2282 LF $245.00 $559,090.00 2282 $559,090.00
2 3305.3012 30"Sewer Carrier Pipe 897 LF $145.00 $130,065.00 897 $130,065.00
3 3305.1304 54"Tunnel Liner Plate by 897 LF $800.00 $717,600.00 903 $722,400.00
4 3331.4115 8"Sewer Pipe 134 LF $60.00 $8,040.00 20 $1,200.00
5 3331.4116 8"Sewer Pipe,CSS Backfil 20 LF $100.00 $2,000.00 20 $2,000.00
6 3331.4119 8"DIP Sewer Pipe 68 LF $95.00 $6,460.00
7 9999.0001 8"DIP By Other Than Open 62 LF $200.00 $12,400.00
8 3331.4201 10"Sewer Pipe 175 LF $65.00 $11,375.00
9 3331.4205 10"DIP Sewer 517 LF $100.00 $51,700.00
10 3331.4206 10"DIP Sewer,CSS Back-fil 20 LF $120.00 $2,400.00
11 3331.4212 12"DIP Sewer Pipe 20 LF $130.00 $2,600.00 58 $7,540.00
12 3341.0409 48"RCP,Class III 6 LF $200.00 $1,200.00
13 3331.1104 12"Pipe Enlargement 204 LF $85.00 $17,340.00 204 $17,340.00
14 3331.1103 10"Pipe Enlargement 346 LF $75.00 $25,950.00 840 $63,000.00
15 3331.1102 8"Pipe Enlargement 576 LF $60.00 $34,560.00 1075 $64,500.00
16 3331.11016"Pipe Enlargement 568 LF $55.00 $31,240.00
17 0241.2201 Remove 4'Sewer Manhole 9 EA $500.00 $4,500.00 9 $4,500.00
18 0241.2202 Remove 5'Sewer Manhole 6 EA $600.00 $3,600.00 4 $2,400.00
19 3331.31014"Sewer Service 25 EA $1,750.00 $43,750.00 15 $26,250.00
Tuesday,January 29,2019 Page 4 of 8
City Project Numbers 02144 DOE Number 7092
Contract Name BELLAIRE WATER&SEWER IMPROVEMENTS Estimate Number 54
Contract Limits Payment Number 54
Project Type WATER&SEWER For Period Ending 11/30/2018
Project Funding
20 3331.3103 4"Bored Sewer Service CO#5 18 EA $3,000.00 $54,000.00
21 9999.0002 4"Sewer Service by Hand T 68 LF $80.00 $5,440.00
22 3331.3102 4"Sewer Service,2-Way Cl CO#5 66 EA $200.00 $13,200.00 21 $4,200.00
23 3331.1201 Service Reinstatement,Pip 14 EA $500.00 $7,000.00 15 $7,500.00
24 3339.1001 4'Manhole 9 EA $3,000.00 $27,000.00 10 $30,000.00
25 3339.1002 4'Drop Manhole 1 EA $4,000.00 $4,000.00 1 $4,000.00
26 3339.1003 4'Extra Depth Manhole 13 VF $200.00 $2,600.00 7 $1,400.00
27 3339.1004 4'Shallow Manhole 2 EA $3,500.00 $7,000.00
28 3339.1101 5'Manhole 21 EA $5,000.00 3105,000.00 22 $110,000.00
29 3339.1103 5'Extra Depth Manhole 132 VF $225.00 $29,700.00 119 $26,775.00
30 3305.0114 Manhole Adjustment,Major 5 EA $600.00 $3,000.00 4 $2,400.00
31 3339.0003 Wastewater Access Chamber CO#5 7 EA $2,500.00 $17,500.00 2 $5,000.00
33 3305.0112 Concrete Collar 29 EA $350.00 $10,150.00 24 $8,400.00
34 0330.0001 Concrete Encase Sewer Pipe 10 CY $200.00 $2,000.00
35 3305.0113 Clay Dams 6 EA $500.00 $3,000.00 6 $3,000.00
36 3305.0204 Imported Embedment/Backfil 25 CY $70.00 $1,750.00
37 3201.0616 Cone Pvmt Repair,Arterial 259 SY $60.00 $15,540.00
38 3201.0112 5'Wide Asphalt Pvmt Repai CO#5(CO 1533.3 LF $50.00 $76,665.00 955 $47,750.00
#6)
39 3201.0113 6'Wide Asphalt Pvmt Repai 2356 LF $60.00 $141,360.00 2356 $141,360.00
40 3201.0201 Asphalt Pvmt Repair Beyond 113 SY $20.00 $2,260.00 49 $980.00
41 3212.0601 HMAC Speed Cushion 1 EA $500.00 $500.00 1 $500.00
42 3216.0102 7"Cone Curb and Gutter 149 LF $30.00 $4,470.00 146 $4,380.00
43 3213.0401 6"Concrete Driveway 420 SF $8.00 $3,360.00 932 $7,456.00
44 3213.0301 4"Cone Sidewalk 40 SF $5.00 $200.00
45 3301.0001 Pre-CCTV Inspection 5114 LF $3.00 $15,342.00
46 3301.0002 Post-CCTV Inspection CO#5 6547 LF $2.00 $13,094.00
47 330 1.0 101 Manhole Vacuum Testing 38 EA $500.00 $19,000.00
48 3305.0103 Exploratory Excavation of 10 EA $600.00 $6,000.00 9 $5,400.00
49 0241.2001 Sanitary Line Grouting 373 CY $175.00 $65,275.00 72 $12,600.00
50 0241.211124"Sewer Abandonment Plug 8 EA $1,000.00 $8,000.00 4 $4,000.00
51 0241.2103 6"-8"Sewer Abandonment P 10 EA $500.00 $5,000.00
52 3305.0109 Trench Safety CO#5 3919 LF $4.00 $15,676.00 3919 $15,676.00
53 3292.0100 Block Sod Placement 459 SY $6.00 $2,754.00 75 $450.00
54 3471.0001 Traffic Control 5 MO $4,000.00 $20,000.00 11 $44,000.00
Tuesday,January 29,2019 Page 5 of 8
City Project Numbers 02144 DOE Number 7092
Contract Name BELLAIRE WATER&SEWER IMPROVEMENTS Estimate Number 54
Contract Limits Payment Number 54
Project Type WATER&SEWER For Period Ending 11/30/2018
Project Funding
55 3125.0101 SWPPP >_1 acre 1 LS $500.00 $500.00 1 $500.00
56 C-905 WATER PIPE FOR SEWER LINE CO#5 677 LF $78.00 $52,806.00
57 PRE CONSTRUCTION DE-HOLE CO#5 7 EA $600.00 $4,200.00
58 CORE EXISTING MH CO#5 4 EA $1,500.00 $6,000.00
59 SEWER LINE TAP CO#5 15 EA $1,400.00 $21,000.00
60 ROCK BOULDERS AT SS CROSSING FOR 1 LS $62,410.00 $62,410.00 1 $62,410.00
EROSION CONTROL(CO#6)
61 EXPOSED AGGREGATE AT 900 BELLAIRE DR. 46.5 SF $13.50 $627.75 46.5 $627.75
S.(CO#6)
62 BRICK SIDEWALK AT 4004 BELLAIRE DR& 2 EA $650.00 $1,300.00 2 $1,300.00
3117 E OVERTON PARK(CO#6)
63 POND CLEANING(CO#6) 1 LS $7,800.00 $7,800.00 1 $7,800.00
Sub-Total of Previous Unit $2,529,349.75 $2,160,149.75
--------------------------------------
Tuesday,January 29,2019 Page 6 of 8
City Project Numbers 02144 DOE Number 7092
Contract Name BELLAIRE WATER&SEWER IMPROVEMENTS Estimate Number 54
Contract Limits Payment Number 54
Project Type WATER&SEWER For Period Ending 11/30/2018
Project Funding
Contract Information Summary
Original Contract Amount $4,172,626.00
ChanjZe Orders
Change Order Number 5 $262,858.00
Change Order Number 2 $98,580.00
Change Order Number 3 $98,700.00
Change Order Number 6 $9,727.75
Total Contract Price $4,642,503.75
i- Date I 3 y Total Cost of Work Completed $4,075,533.25
or A Less %Retained $0.00
Date -!X31 Y/ Net Earned $4,075,533.25
yyy►YYfttfff�((( L� 7
Inspection Supervis r l L� Earned This Period $177,107.78
�y�� Date Z /1� / I 1 Retainage This Period $0.00
Less Liquidated Damages
Project Manager
Days @ /Day $0.00
N I A Date LessPavement Deficiency $0.00
Asst.Direccttoo�r/TPW Less Penalty $0.00
/lam
dc— Date Less Previous Payment $3,898,425.47
Director/Contracting Department Plus Material on Hand Less 15% $0.00
Balance Due This Payment $177,107.78
Tuesday,January 29,2019 Page 7 of 8
0
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a Notary Public in the state and county aforesaid,
on this day personally appeared Brock Huggins, President of Conatser Management Group, Inc.,
general partner of Conatser Construction TX, LP, known to me to be a credible person, who
being by me duly sworn,upon his oath deposed and said:
That all persons, firms, associations, corporations or other organizations furnishing
labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of Fort Worth, has
been paid in full; and
That there are no claims pending for personal injury and/or property damages;
On Contract described as:
BELLAIRE DRIVE NORTH
WATER& PAVING IMPROVEMENTS
DOE#: N/A
CFA PRJ #: 2015-073
CITY PROJCT #: N/A
CITY OF FORT WORTH
STATE OF TEXAS
CONATSER CONSTRUC ION TX, LP
Brock Huggins
Subscribed and sworn to before me this 9" day of Febru 7.
BERTHA GIANULIS Notary Public in Tarrant County, Texas
Notary Public,State of Texas
My Commission Expires
I .,i:�.• :.,
September 18, 2019
CONSENT OF OWNER ❑
SURETY COMPANY ARCHITECT ❑
CONTRACTOR ❑
TO FINAL PAYMENT SURETY ❑
Conforms with the American Institute of OTHER
Architects,AIA Document 6707
Bond No 0195685
PROJECT:
(name, address)Bellaire Drive North
Fort Worth,TX
TO (Owner)
CFA No.
TEXAS CHRISTIAN UNIVERSITY AND CITY OF FORT ARCHITECT'S PROJECT NO: 2015-073
WORTH CONTRACT FOR:
3589 Bellaire Drive North Bellaire Drive North-Water and Paving Improvements
Fort Worth,TX 76109
L_ CONTRACT DATE:
CONTRACTOR: CONATSER CONSTRUCTION TX, L.P.
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the
(here insert name and address of Surety Company)
BERKLEY INSURANCE COMPANY
475 Steamboat Road
Greenwich CT 06830 , SURETY COMPANY
on bond of (here insert name and address of Contractor)
CONATSER CONSTRUCTION TX, L.P.
5327 Wichita St.
Fort Worth TX 76119-6035 , CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its obligations to (here Insert name and address of Owner)
TEXAS CHRISTIAN UNIVERSITY AND CITY OF FORT WORTH
3589 Bellaire Drive North
Fort Worth,TX 76109 , OWNER,
as set forth in the said Surety Company's bond,
IN WITNESS,WHEREOF,
the Surety Company has hereunto set its hand this 8th day of February,2017
BERKLEY INSURANCE COMPANY
Surety
Company
Attest: ` � (_ �� �7" -Z
(Seal): Signature of Authorized Representative
Robbi Morales Attorney-in-Fact
Title
NOTE: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS,
Current Edition
ONE PAGE
No. BI-7280f
POWER OF ATTORNEY
L
BERKLEY INSURANCE COMPANY
WILMINGTON, DELAWARE
NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully.
KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly
organized and existing under the laws of the State of Delaware,having its principal office in Greenwich, CT, has made, constituted
and appointed, and does by these presents make, constitute and appoint: Ricardo J. Reyna; Don E Cornell, Vena DeLene
a Marshall;Sophinie Hunter,Robbi Morales; or Kelly A. Westbrook of Aon Risk Services Southwest, Inc. of Dallas, 7x its true
and lawful Attorney-in-Fact,to sign its name as surety only as delineated below and to execute, seal, acknowledge and deliver any
and all bonds and undertakings, with the exception of Financial Guaranty Insurance, providing that no single obligation shall
J exceed Fifty Million and 00/100 U.S. Dollars (U.S.$50,000,000.00),to the same extent as if such bonds had been duly executed
.6 and acknowledged by the regularly elected officers of the Company at its principal office in their own proper persons.
1
This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws of the State of Delaware,
without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following
y' resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January 25,2010:
m' RESOLVED, that, with respect to the Surety business written by Berkley Surety Group, the Chairman of the Board, Chief
Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant
' Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney-in-fact named therein
to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the
corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such
attorney-in-fact and revoke any power of attorney previously granted;and further
L• ' RESOLVED, that such power of attorney limits the acts of those named therein to the bonds, undertakings, recognizances,
r or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the
manner and to the extent therein stated; and further
RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-in-fact named; and
further
C, ; RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any
L power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or
other suretyship obligation of the Company;and such signature and seal when so used shall have the same force and effect as
though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any
person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have
C-L ceased to be such at the time when such instruments shall be issued.
V °-a IN WITNESS WHEREOF, the Company has cause- these presents to be signed and attested by its appropriate officers and its
corporate seal hereunto affixed this�70f�ay ofc -1-5:-
Attest: Berkley Insurance Company
�i (Seal)
BY By AVrt/
' Ira S. e erman Je after
Senior Vice President&Secretary e r ' Preside
tYi
WARNING, THIS POWER INVALID IF NOT PRINTED ON BLUE "BERKLEY" SECURITY PAPE..
" STATE OF CONNECTICUT)
ss:
COUNTY OF FAIRFIELD )
..m Sworn to before me, a Notary Public in the State of Connecticut, this :)(? da of '�-� 2015, by Ira S. Lederman and
' Jeffrey M. Hafter who are sworn to me to be the Senior Vice President and Secre ry�;�nthe Senior Vice Pre dent, respectively, of
Berkley Insurance Company. MARIA C.RUNDBAKEN
'. NOTARY PUBLIC
MY COMMISSION EXPIRES otary Public, State of Connecticut
" APRIL 30.2019
CERTIFICATE
4 I, the undersigned, Assistant Secretary of BERKLEY INSURANCE COMPANY, DO HEREBY CERTIFY that the foregoing is a
true, correct and complete copy of the original Power of Attorney;that said Power of Attorney has not been revoked or rescinded
a and that the authority of the Attorney-in-Fact set forth therein, who executed the bond or undertaking to which this Power of
Attorney is attached, is in full force and effect as of this date.
Given under my hand and seal of the Company,this 8th day of February 2017
(Seal) 'A/ —
A a
FoRTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: Bellaire Water,Sewer Improvements
PROJECT NUMBERS 2144
DOE NUMBER: 7092
WATER
PIPE LAID SIZE TYPE OF PIPE LF
C-900 24" PVC 2768
iron 24" DIP 40
C-90or 16" Pvc 1935
C-900 12" PVC1410
iron 12" DIP 100
front 12" DIP(CSS Backfill) 135
C-900 8" PVC 112
0300 6" PVC 117
FIRE HYDRANTS: 6 VALVES(16"OR LARGER) 14
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES:
NEW SERVICES:
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
Hobas 3011 Hobas(fiber glass) 2282
SDR 26 $" PVC 20
Iron 12" DIP 58
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES:
NEW SERVICES:
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth-1000 Throckmorton Street-Fort Worth,TX 76012-6311
a
(917)392-7941 -Fax:(817)392-7845
City of Fort Worth
Departmental Request for Waiver
Of MBE/SBE Subcontracting/Supplier Goal
Water Department 97,088.00 2/1/16
DEPARTMENT NAME: ESTIMATED COST / PROPOSAL DATE
Bellaire South Drive Water,Sanitary Sewer and Storm Drain Improvements DOE 7092
NAME OF PROJECT/BID; DOE/PROJECT NO,
Roberto Sauceda 2387 6/8/16 925-83
SIGNATURE OF /PROJECT MANAGER EXTENSION DATE NIGP CODE
Prior to advertisement, the contracting/managing department shall determine whether the bid/proposal is one which MBE/SBE
requirements should not be applied. MBE/SBE requirements may be waived upon written approval of the MWBE Manager. If one
of the conditions listed below exists,the contracting/managing department shall notify the Manager via this form, stating the specific
reason(s)for requesting a waiver.
If the contracting/managing department and the Manager are in conflict over the granting of a waiver, either
may appeal to the City Manager, or designee, and his/her decision is final,
Please Check Applicable Reason:
A. MWBE Office: A waiver of the goal for MBE/SBE subcontracting requirements was requested
by the Department and approved by the MWBE Office, in accordance with the M/WBE or BDE
Ordinance, because the public or administrative emergency exists which requires the goods or
services to be provided with unusual immediacy; or
X B.• MWBE Office: A waiver of the goal for MBE/SBE subcontracting requirements was requested
by the Department and approved by the MWBE Office, in accordance with the M/WBE or BDE
Ordinance, because the purchase of goods or services from source(s) where subcontracting or
supplier opportunities are negligible; or
C. MWBE Office: A waiver of the goal for MBE/SBE subcontracting requirements was requested
by the Department and approved by the MWBE Office, in accordance with the M/WBE or BDE
Ordinance, because the application of the provisions of this ordinance will impose an economic
risk on the City or unduly delay acquisition of the goods or services; or
D. MWBE Office; A waiver of the goal for MBE/SBE subcontracting requirements was requested
by the Department and approved by the MWBE Office, in accordance with the M/WBE or BDE
Ordinance, because the MWBE Waiver is solicited based on the sole source information
provided to the MWBE Office by the managing department's project manager.
Justify Commodity or Service Waiver Request:
Needed to install sheet pilling for pond drainage improvements and emergency concrete street repair.
Please use additional sheets,if needed
M/WBE OFFICE USE ONLY:
-!
Jb�- V----1 �t A-Z
Approved Signature of M/WBE Authorized Personnel
Date
Not Approved Signature of M/WBE Authorized Personnel Date
Rev.2-20.13
FORTWORTH.
TRANSPORTATION AND PUBLIC WORKS
STATEMENT OF CONTRACT TIME
STATEMENT#
FINAL STATEMENT# _Final DOE 7092
NAME OF PROJECT: Bellaire Water,Paving,Sewer&Storm DrainContractor Conatser
YEAR: 2018
PROJECT NO.: FINAL INSPECTION DATE
2144&1081I WD CD
CONTRACT TIME 1025 X
PERIOD FROM: 1 71112018 TO: 1 7115/2018 1 BEG - Month I JDEVELOPME
WORK ORDER EFFECTIVE: 1/20/2015 BEG fy 1 n` y MID /n n 100.0%
DAY OF MONTH DAYS REASON FOR DAY OF MONTH DAYS REASON FOR
CHARGED DAYS CREDITED CHARGED DAYS CREDITED
1 Sun N/A 16
2 Mon N/A 17
3 Tue N/A -- -- - - 18
4 Wed NIA - - 19 -
5 Thu N/A 20
6 Fri N/A 21
7 Sat N/A 22
8 Sun NIA 23
9 Mon N/A 24
10 Tue NIA 25
11 Wed N/A 26
12 Thu_ _ N/A _ - 27
13 Fri NIA 28
14 Sat N/A 29
15 Sun NIA 30
31
NA 'Wkn &Hoi Wea iltl Oth
Not Applicable SAT,SUN,and WEATHER UTILITIES OTHERS DAYS TOTAL DAYS
HOLIDAYS RELOCATE CHARGED
THIS PERIOD 0 0 0 0 0 0
PREVIOUS PERIOD 0 1025 1025
TOTAL TO DATE 0 0 0 0 1025 1025
REMARKS:
Time was stopped previously
Signature; Signature:
(Print Name) y John Crowley
CONTRACTOR DATE I INSPECTOR DATE 11127/2018