Loading...
HomeMy WebLinkAboutContract 35401-A3 AMENDMENT NO. 3 A. STATE OF TEXAS S CITY SECRETARY CONTRACT NO. �J Ca r3 (No M&C Needed) COUNTY OF TARRANT $ WHEREAS, the City of Fort Worth (City) and URS Corporation, [Engineer] made and entered into City Secretary Contract No. CS35401. (the Contract) which was authorized by the City Council by M&C C22169 on the 12 day of June 2007; and WHEREAS. the Contract involves engineering services for the following project: East Rosedale and Sycamore Creek, Project No. 00138 WHEREAS, it has become necessary to execute Amendment No. 3 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE. City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated June 28, 2010■ a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $16.345.25. 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $133, 803 .25. OFFICIAL RECORD CITY SECRETARY City of Fort Worth,Texas r.WORTH,TX Amendment to Engineering Agreement PMO Of iclal Release Date!6.18.2010 Page 1 of 2 08-26-TQ A09:06 IN 3 . All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the day of AU� , a D 10 . in Fort Worth, Tarrant County, Texas. ATTEST: �p A� Marty Hendrixb v�+� City Secretary AU.4 APPROVAL RECOMMENDED: APPROVED: William V kest, .E. Director, Fernando Costa Transportation/PublicWorks Assistant City Manager Department URS Corporation ENO 1' &C REQUIRED ENGINEER By: _ Name: . E tM .EY a./ r C_. . Vice President `f 1300 Summit Ave, Suite 600 Fort Worth, TX 76102 APPROVED AS TO FORM AND LEGAL 'I'Y: Assistant City Attar e OFFICIAL.RECORD City of Fort Worth,Texas Amendment to Engineering Agreement CITY SECRETARY PMD O ficial Release Date:6.18.2010 Page 2 of 2 FT.WORTH,TX EXHIBIT A-4 Services to Be Provided By the Engineer Additional construction phase services will be provided and limited to the following: 1. Coordinate efforts with TxDOT, City of Fort Worth, UPRR and Texas Sterling Inc and its sub consultants for configuration of hydraulic structure. 2. Present all parties involved the results of the HECRAS hydraulic modeling,for CMP pipe option and smooth steel pipe option that will be equal or better than the 2-1 0'X1 0' boxes that are currently designed. 3. Incorporate comments and changes to finalize the hydraulic model in HECRAS. 4. Update plan sheets and hydraulic data sheets as required. 5. Submit final HECRAS model and summarize the design changes. 6. Attend up to two coordination/design meetings. 1 of 1 East Rosedale City Contract No.CS354 EXHIBIT B-4 -FEE SCHEDULE/BUDGET URS Corporation East Rosedale and Sycamore Creek Total PM Senior Design DESCRIPTION OF WORK TASK Plan Sheet Engr Engr Count $70.00 $55.00 $50.00 LHECRAS MODELLING 1 Project Management 4 4 2 HECRAS Modelling for CMP pipe 2 16 3 HECRAS Modelling for Smooth Steel Pipe 2 16 4 Design and Construction Review Meeting 2 2 4 5 j Revise and Finalize HECRAS Model 2 2 4 6 Incorporate changes into Plan Sheets 6 2 4 7 Post Design support 4 4 5 Total Construction Phase Services:(FC:351) 6 12 18 50 GRAND TOTAL 6 12 IS 50 Pay Page 1 of 1 Young, Linda S. From: Juan_Sierra@URSCorp.com Sent: Monday, June 28, 2010 10:00 AM To: Young, Linda S, Cc: Deepak—Manglorkar@URSCorp.com Subject: Drainage Proposal Attachments: Rosedale-Scope of Work-HFCRAS Modelling.doc; East Rosedale HFCRAS Modelling- Fee Proposal.xlsx Linda: Attached is our fee proposal for the Drainage analysis at the UPRR location. Thanks Juan This e-mail and any attachments contain URS Corporation confidential information that in ay be proprietary or privileged.If you receive this message in error or are not the intended recipient,you should not retain,distribute,disclose or use any of this information and you should destroy the e-mail and any attachments or copies- 7/27/2010