Loading...
HomeMy WebLinkAboutContract 35428-A2 SECOND AMENDMENT TO CITY SECRETARY CONTRACT NO. 35428 WHEREAS, on June 25, 2007, the City of Fort Worth ("City") and Cliff Garten & Associates, Inc., d/b/a Cliff Garten Studio ("Artist") entered into City Secretary Contract No. 35428 (the"Contract") as authorized by City Council(M&C C-21291)on February 14,2006 and the City designated the Arts Council of Fort Worth and Tarrant County, Inc. as its Contract Manager; and, WHEREAS, on January 24, 2008, the City of Fort Worth ("City") and Cliff Garten & Associates, Inc., d/b/a Cliff Garten Studio("Artist") and entered into City Secretary Contract No. 36533 (the "Contract Amendment"} as authorized by City Council (M&C C-22334) on August 21, 2007; and, WHEREAS, under the Contract, as amended, Artist is to design, fabricate and install six (6) three-dimensional, freestanding, internally-lit stainless steel sculptures approximately 35' in height with associated spot lighting entitled "Avenue of Light" (the "Work") on Lancaster Avenue in downtown Fort Worth, Texas (the "Site"); and, WHEREAS, the City desires to delete the following items from Artist's scope of work, including, unloading and installing the sculptures at the Site and furnishing and installing sculpture lighting; and, WHEREAS, the City requires that Artist's Fee under the Contract, as amended, be adjusted accordingly; and, WHEREAS, it the mutual desire of City and Artist to further amend the Contract. NOW, THEREFORE, City, whose address is 1000 Throckmorton Street, Fort Worth, Texas 76102, acting by and through Fernando Costa, its duly authorized Assistant City Manager, and Artist acting by and through Cliff Garten, President, whose address is 1315 Preston Way, Venice, CA, 90291, do hereby agree as follows: I. Recitals—The third paragraph of the Agreement is amended to be read as follows: "WHEREAS, the Artist was selected by the City through a selection process conducted by the Contract Manager with oversight of the Fort Worth Art Commission to design, fabricate and deliver six (6) three-dimensional, freestanding, stainless steel sculptures approximately 35' in height entitled "Avenue of Light", as described in Artist's proposal attached hereto as Exhibit"B", (the"Work"); and," OFFICIAL RECORD CITY SIT'CRE TRY CONTRACT AMENDMENT 92 � ����� � Cliff Garten Studio , r 11. Section L L General. This Section is amended as follows: A. Section I.La. is amended to remove reference to installation. "a. The Artist shall perform all services and will furnish all supplies, materials, and equipment as necessary for the transportation of the Work at the Site, as set forth in Section 1.4. Serviccs shall be performed in a professional manner and in substantial compliance with all material terms and conditions in this Agreement." B. Section 1.1.c. is deleted in its entirety. C. Section 1.1.e is deleted in its entirety. Ill. Section 1.3. Execution af the Work. This Section is amended to remove reference to installation, as follows: "a. Upon execution of this Agreement, Artist shall promptly furnish to the Contract Manager a schedule for the completion of the fabrication of the Work, including a schedule for the submission of progress reports, and engineered drawings as required. After written approval of the schedule by the City, the Artist shall oversee the work, the fabrication, and transportation of the Work in accordance with such schedule. Schedule changes may be accomplished by written agreement between the Artist and the City." IV. Section 1.4. Delivery and Installation. This Section is amended to remove reference to Artist's responsibility to install the Work,as follows: "Section 1.4. Delivery a. The Artist shall notify the City, through its Contract Manager, in writing when fabrication of the Work is completed and is ready for its delivery and installation at the Site. CONTRACT AMENDMENT 42 Page 2 C1ifrGarten Studio b. The Artist shall deliver the completed Work at the Site in compliance with the schedule approved pursuant to Section 1.4; provided, however, that delivery may not commence until written permission is delivered to the Artist by the Contract Manager. C. The City is responsible for the installation and cost of concrete pilings and bases for the sculptures. The City shall cause the construction of the pilings and bases according to the stamped engineering drawings provided by the Artist, as approved by the City. The Artist is responsible for providing two (2) concrete forms and hardware for the construction of the pilings and bases in a timely fashion. d. The City is responsible for providing electrical service to the sculpture sites in substantial conformance with the electrical engineering plan provided by the Artist, as approved by the City. e. The City is responsible for landscaping the medians. £ The Artist, individually and through its subcontractors, including its fabricator, shall take all necessary precautions to protect and preserve the integrity and finish of the Site while delivering the Work. The Artist shall repair any damage to the Site due to delivery or his negligence or the negligence of his subcontractors. g. Prior to installation of the Work, Artist shall provide to City written instructions for appropriate maintenance and preservation of the Work. The appropriate maintenance and preservation instructions shall not be substantially different from the maintenance and preservation anticipated and conveyed to City for the Work in the design phase for the Work." V. Section 2.1. Fee. This Section is amended to be read as follows: "a. The City shall pay the Artist a fee of ONE MILLION ONE HUNDRED FOURTEEN THOUSAND ONE HUNDRED FORTY DOLLARS AND NO CENTS ($1,114,140) (the "Fee"'), which shall constitute full compensation for all services and materials to be performed and furnished by the Artist under this Agreement, inclusive of execution, CONTRACT AMENDMENT#2 Page 3 Cliff Garten Studio fabrication, transportation, insurance, incidental costs, Artist's fees and all travel expenses. (a) FIVE HUNDRED FIFTY THOUSAND DOLLARS ($550,000) upon full execution of'this Agreement and submission of schedule; (b) TWO HUNDRED FIFTY-ONE THOUSAND NINE HUNDRED FIFTY-THREE DOLLARS ($251,)53) upon full execution of the Contract Amendment and submission of revised schedule; (c) ONE HUNDRED FORTY-NINE THOUSAND SEVEN HUNDRED THIRTY DOLLARS ($149,730) upon completion of post-processing of steel plates; (d) FIFTY-FIVE THOUSAND EIGHT HUNDRED FIFTY-TWO DOLLARS ($55,852) upon completion of fabrication of the first two sculptures and approval of City before delivery of the first two sculptures to site; (e) ONE HUNDRED SIX THOUSAND SIX HUNDRED FIVE DOLLARS ($106,605) within thirty-five (35) days after Delivery of all six sculptures and Final Acceptance and receipt by City of such documentation it may require concerning payment of services and supplies rendered to the Artist [see Section 1.6 (a)]; provided, however, that final delivery shall not be tendered prior to the expiration of thirty(30)days after Final Acceptance." Funds previously paid to the Artist prior to this amendment shall apply toward the total fee. VI. Section 2.1. Fee. This Section is amended to delete 2.1.b. VII. Section 5.1. General. This Section is amended to remove reference to installation. "The Artist shall carry insurance as set out in Exhibit "C". CONTRACT AMENDMENT 42 Page 4 Cliff Garten Studio "Except as provided in Section 1.7 hereof, the risk of damage to or loss of the Work shall, during fabrication and delivery but prior to Final Acceptance, shall be solely that of the Artist. This risk shall transfer to the City and shall no longer be the responsibility of the Artist upon Final Acceptance." VIII. All other terms and conditions of City Secretary Contract No. 35428 not amended herein remain unaffected and in full force and effect, are binding upon the parties, and are hereby ratified by the parties. IN WITNESS WHEREOF, the parti s kereto have executed four copies of this contract amendment in Fort Worth,Texas, this day of _, 2008. ATTEST: CITY OF FORT WORTH By: ��....._, City Secretary Fernando Costa Assistant City Manager L.-a,3 i 's 0 AP ROVE TO FORM AND LEGALITY: Contract authorization 1® 128 n ssistant City Atto ney � ARTIST Cliff WSStes,Inc. By: liff Garten Title: _ &-4Z1 E1V7'"- OFFICIAL RECORD CONTRACT AMENDMENT 92 CITY SECRETA Cliff Garten Studio Fr.WORTH,rx Page 1 of 2 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 10/2812008 DATE: Tuesday, October 28, 2008 LOG NAME: 20AVEOFLIGHT REFERENCE NO.: C-23150 SUBJECT: Authorize a Construction Contract with Northstar Construction, Inc., for Infrastructure Construction, Lighting, Site Work and Installation of the Lancaster Avenue Median Lighting Project (Avenue of Light) in an Amount Not to Exceed $247,750.00 RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute a construction contract with Northstar Construction, Inc., in an amount not to exceed $247,750.00 for infrastructure construction, lighting, site work and installation of the Lancaster Avenue Median Lighting Project (Avenue of Light). DISCUSSION: This Construction Contract will provide site work, electrical infrastructure, light fixtures, concrete pilings and bases and installation of six 35 foot stainless steel sculptures being fabricated and delivered by Cliff Garten and Associates, Inc., d/b/a Cliff Garten Studio, for the median of Lancaster Avenue between Lamar and Commerce Street. The contract budget of$247,750.00 shall be provided from two funding sources: 1. Economic Development Initiative (EDI) Special Project grant in the amount of$198,400.00 from the U.S. Department of Housing and Urban Development (HUD), as previously approved by City Council (M&C G- 15787) for the Lancaster Avenue Median Lighting project. The HUD EDI grant would reimburse City funds used to provide necessary infrastructure for the sculptures; and 2. The remaining $49,350.00 shall come from the project budget previously approved by City Council on August 21, 2007, (M&C C-22334) authorizing a contract amendment with Cliff Garten and Associates, Inc., d/b/a Cliff Garten Studio, in the amount of $550,000.00. (NOTE: A contract amendment is currently being executed with Cliff Garten and Associates, Inc., d/b/a Cliff Garten Studio, to reduce the artist's scope of work and budget in light of the scope of work to be provided through the contract with Northstar�` Construction, Inc.). The project was advertised on September 11 and 18, 2008. The following bids were received on October 9, 2008: BIDDER AMOUNT Northstar Construction, Inc. $247,750.00 Vendignm Construction, LLC $258,250.00 AUI Contractors, Inc. $265,090.00 MICA Corporation $387,025.00 Time of Completion: 45 Calendar Days Specified. httn:Ilwww_fortworthgov.orelcouncit nacket/Renortslmc prirnt.asD 11/6/2008 Page 2 of 2 In addition to the construction cost, funding in the amount of$9,910.00 is required for inspection services. Northstar Construction, Inc., is in compliance with the City's Disadvantaged Business Enterprise Program (DBE) by committing to 21 percent DBE participation. The City's goal on this project is 20 percent. The project is located in COUNCIL DISTRICT 9, Mapsco 76C and 77A. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budgets, as appropriated, of the Specially Funded Capital Projects Fund and the Grants Fund. TO Fund/Accnunt/Centers FROM Fund/Account/Centers 0291 541200 03998003788.0 X59,260,00 GR76 541200 006246164010 $198,400.00 Submitted_for City Manager's Office by: Fernando Costa (6122) Originating Department Head: Greg Simmons (7862) Jim Walker {8009} Additional Information Contact: Martha Peters (298-3025) httn://www.fortworthizov.orizlcouncit packet/Reports/mc print.asp 11/6/2008