Loading...
HomeMy WebLinkAboutContract 35464-A3 (2) AMENDMENT No.3 TO CITY SECRETARY CONTRACT Na. 35464 WHEREAS, the City of Fort Worth (CITY) and Stream Water Group, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 35464, (the CONTRACT) which was authorized by M&C C---22174 on the 12th day of June, 2007 in the amount of $ 112, 898 . 00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $76, 565. 00 which was authorized by M&C C-24012 on January 12, 2010 and Amendment Number 2 in the amount of $7Q, 480 . 00 which was authorized by M&C C-25126 on August 23, 2011; and WHEREAS, the CONTRACT involves engineering services for the following project: E'ast Como Channel Improvements; and WHEREAS, it has become necessary to execute Amendment No. 3 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated December 12, 2014, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $18, 960. 00. (See Attached Funding Breakdown Sheet, Page -3-) M C-) M 2 . rr Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under t%* the Contract, as amended, so that the total fee paid by the City for all cc work and services shall be an amount of $278, 903. 00. 3. All other provisions of the Contract, which are not expressly amended herein, shall Tremain in full force and effect. City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page t of 3 OFFICIAL RECORD CITY SECRETARY FT.WORTHY TX EXECUTED and EFFECTIVE as of the date Last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER Stream Water Group, Inc. Fernando Costa Shamsu A efin, P.E. Assistant City Manager President DATE: - ',5- DATE: �- 2 APPRO L RECOMMENDED: o- w Douglas W. Wiersig, P.E. Director, Transportation/Public Works Department APPROVED AS TO FORM AND LEGALITY: M&C: Date : Douglas W. Black Assistant City Attorney ATTEST: _ 0 0 f Mary J. a sego o� City Secretary A OFFICIAL RECORD CITY SECRETARY City of Fort Worth .7& .WORTH,TX Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 2 of 3 FUNDING BREAICDDWN SHEET City Secretary No. 35464 Amendment No. 3 Department Fund-Account-Center Amount TPW P227-531200-207280098130 $18. 960. 00 Total: $18, 950 . 00 City of Fort Worth Professional Services Agreement A mend in en t Te in pi ate PMO Official Release 8/1/2012 Page 3 of 3 �J December 10,2014 Mr.Michael A.Owen,P.E. Project Manager Transportation and Public Works Department 1000 Throckmorton St Fort Worth,TX 76102 Phone;(817)392-8079 RE: Contract Amendment No.3 Engineering Design Services: East Como Culvert&Channel Improvements City Project No.00481,DOE No.5421 Dear Mr. Owen: The following is a summary of additional work requested for Amendment No. 3 to the above referenced project,per recent design meetings with City of Fort Worth officials. Amendment No.3: •:+ Preparation of additional 11 Permanent Easements, 12 ROW Documents, and additional boundat y survey for property Acquisition. Amendment No.3 amount(see Exhibit B-313-1): $18,950.00 The current status of the contract between Stream Water Group,Inc. and City of Fort Worth for the above referenced project is as follows: Original Contract Amount= $112,848.00 Amendment No. 1 Amount= $ 76,565.00 Amendment No.2 Amount= $ 70,480.00 Amendment No.3 Proposed Amount= $ 18.960.00 Total Contract Amount including Amendment No.3= $278,903.00 Please process Amendment No.3,to the East Como Avenue Culvert&Channel Improvements City Project No.00481,DOE No. 5421 in the amount of$18,960.00 If you require any additional information or have any questions regarding this matter,please give me a call at 817-446-4171.We appreciate the opportunity to provide engineering design services for the City of Fort Worth. Sincerely, Stream Water Group,Inc. 4X;-- Shamsul Arefin,P.E. President Copy:File Attachments:Exhibit B-3B-1 (Level of Effort) 6737 BrenIwond Stair Rd • Suitc 230 . Fort Worlh, TX 761 12 • Phonr: 811A46.41 71 • Fsiz: S 17.446.4335 \%,ww. sireamnalrrgrniih.conn CO V) m r LL O L w op W r �7 0 F � N O Go U f�7 r U M ff1 z LO 69 U E C 41 LO N E C a C u7 a-- y C Do) 0 GJ w U L O C'7 CL G N LU G 2 z a FQ- W r t co 2i 0 B E C G � sa aro G v' a W 0 d z Z _ m a U 'o- 0 a m a Z� 7 cc = tl1 W R N 0 L d C IL m a r � 1'v N N d1 C_ E Q n LY W 12 c Y e m a