WHEREAS, the City of Fort Worth (City) and TCB, Inc. , (Engineer)
made and entered into City Secretary Contract No. 35274, (the Contract)
which was authorized by the City Council by M&C C-22038 on the 3rd day of
April 2007; and
WHEREAS, the Contract involves engineering services for the
following project:
Milam-Robinhood Drainage, Far East Fart Worth Drainage, and Wilbarger-
Hughes Storm Drain Extension, Project No. 00182.
WHEREAS, it has become necessary to execute Amendment No. 2 to said
Contract to reflect the merger and subsequent name change of TCB, Inc.
to AECOM USA, Inc. , and to include an increased scope of work and
revised maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through
their duly authorized representatives, enter into the following
agreement which amends the Contract:
1.
Change the Engineer name from TCB, Inc. to AECOM USA, Inc.
2.
Article I, of the Contract is amended to include the additional
engineering services specified in a proposal letter dated November 3,
2008, copies of which are both attached hereto and incorporated herein.
The cost to City for the additional services to be performed by Engineer
total $58,253.00.
3.
Article II, of the Contract is amended to provide for an increase
in the maximum fee to be paid to Engineer for all work and services
performed under the Contract, as amended, so that the total fee paid by
OI Irfliu-1AL RECORD
CITY SECRETARY
�T.WORTH,TX
the City for all work and services shall not exceed the sum of
$216,513.00-
4.
All other provisions of the Contract which are not expressly
amended herein shall remain in full force and effect.
EXECUTED on this the Lp day of 2009, in Fort
Worth, Tarrant County, Texas.
ATTEST,
z
Contract. Authorizat.i.ou
Marty Hendri — -
City Secretary Date
APPROVAL RECOMMNDED: APPROVED:
William Verkes Fernando Costa
Director, Department of Assistant City Manager
Transportation and Public Warks
AECOM USA, INC.
Engineer
By:
Name: on D' dam
Vice President
90Q West 15th Street, Suite 500
Austin, TX 78701
APPRO AS TO FORM LEGALITY:
Assistant orney
OFFICIAL tECO t
ilTY SECRETA
fi"i:1A#oRTHt TX. '
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 9/15/2409
DATE: Tuesday, September 15,2009 REFERENCE NO.: **C-23774
LOG NAME: 20AMEND2—MILAM—ROBINHOOD
Authorize Amendment No. 2 to City Secretary Contract No. 35274 to Change the Engineering Firm from
TCB Inc.,to AECOM USA,Inc.,and Increase the Amount by$68,263.00 for the Milam—Robinhood
Drainage,Far East Fort Worth Drainage and Wilbarger—Hughes Storm Drain Extension(Project No. 00482)
RECOMMENDATION:
It is recommended that the City Council authorize the City Manager to execute Amendment No.2 to City
Secretary Contract No. 35274 to change the Engineering Firm TCB,Inc.,to AECOM USA,Inc.,and
increase the total by$68,253.00, thereby revising the total contract amount to$216,513.00.
The Storm Water Management Program was established to reduce flooding in Fort Worth,preserve streams,
minimize water pollution and to operate the storm water system in a more effective manner to fully comply
with state and federal regulatory requirements.This will be accomplished by infrastructure reconstruction
and system maintenance,master planning,enhanced development review and increased public education and
outreach.
The scope of the original agreement included the design of storm drainage facilities near the intersections of
Milam and Robinhood,Meadowbrook and Ederville, and Wilbarger and Hughes. Amendment No. 2 provides
additional design services to incorporate roadside ditches and a closed storm drain system for the
Meadowbrook and Ederville drainage area.
A request for qualifications to provide drainage design was issued by the City in January of 2006 and 24
design consultants submitted statements of qualifications,including TCB,Inc.
TCB,Inc., was selected to provide design services for drainage improvements.
On October 16,2007,(Ordinance No. 17840-10-2007)City Council authorized the issuance and sale of
$25,000,000 in Storm Water(Drainage)Revenue Bonds, Series 2007,to fund a two year Storm Water
Capital project program.
On April 3,2007,(M&C C-22038)City Council approved an engineering agreement with TCB, Inc„for the
design of Milam—Robinhood Drainage,Far East Fort Worth Drainage, and Wilbarger—Hughes Storm Drain
Extension for a lump sum fee of$128,780.00.
On May 8,2008,Amendment No. i was executed administratively for a lump sum fee of$19,470.00.
Amendment No. 1 included services to perform subsurface utility engineering(SUE)for Quality Level "A".
Effective January 3,2009,TCB,Inc. was merged with AECOM USA,Inc., (AECOM)and has been reflected
as such in the City's database as of March 2009.
AECOM proposes to perform the design services under Amendment No.2 for a lump sum fee of$68,263.00.
City staff considers the fee to be fair and reasonable for the scope of services proposed.
AECOM is in compliance with the City's MIWBE Ordinance by committing to an additional 14 percent
MIWBE participation for this Amendment No.2.
This project is located in COUNCIL DISTRICT 5,Mapsco 80F.
FISCAL INFORMATION:
The Financial Management Services Director certifies that funds are available in the current capital budget,
as appropriated,of the Storm Water Capital Projects 2007 Revenue Bond Fund.
FUND CENTERS:
TO FunrllAccountlCenter� FROM FundlAccnuntlCenters
-- P229 531200 705280048231 $2 54
P229 53 200 205280048232 $31,927,
P229 531200205280048233 4 2
P229 5 120 20 280048251 $11,110.00
CERTIFICATIONS:
Subruitted for Cily Ma a e 's O five Fernando Costa (6122)
Originating Drpartme t Head: William Verkest (7801)
Additional Information Contact: David Harbour (7952)
ATTACHMEN S
1. Al~COM—A en ment2.pdd
2. —
3. map.pd
4. mweol. df
AECOM
AECOM
1200 summkl Avenue,5ulte 600,Fort Worlh,Texas 78102-4409
T817,698.6700 F817.698-6701 www.aecom.com
November 3,2008
Mr. Richard Argomaniz, P.E., Project Manager
City of Fort Worth- Department of Engineering
1000 Throckmorton
Fort Worth,TX 76142
Subject: Stormwater Utility--Far East Fort Worth Amendment Request No.2
EdervillelMeadowbrook Storm Drain,Roadside Ditch Design
City of Fort Worth Project No. 00482,DOE NO.5422,CS No.35274
Dear Mr. Argomaniz:
Attached for your review is TCB's request for Amendment No.2, including additional information
requested by Dena Johnson on Monday,November 3,2008.The amendment reflects the design
fee associated with the proposed schematic presented during the July 29,2008,project review
meeting for the Far Bast FW Meadowbrook and Edervllle drainage improvements area.The
proposed schematic delineates roadside ditches and a closed storm drain system discharging to
Findlay Park Lake in the City of Arlington. In addition to this area, Steve Eubanks requested tree
speciation be provided for the Milam-Robinhood project area.
Additional survey will be performed by our subconsultant,Gorrondona&Associates, Inc. Forestry
services will be performed by Urban Forestry Consultant, Larry Schaapveld,a non MIWBE firm.A
breakdown of fees and Opinion of Probable Construction cost is attached.
Summar
Additional Services per Exhibit 8-313{includes 10%markup for Subs}
$21,435.00
Storm drain design improvements for Meadowbrook and Ederville Area L!16
Total Request .0a
Original Contract Amount $ 128,780.00
Amendment Request No. 1 (GAI SUE Services) $ 19,470.40
Amendment Request No. 2 6 263.00
Revised Contract Amount $216,513.00
City MlWBE Goal--22%
Total MIWBE Project Participation {$59,5301$216,513,00}=27%
if you have any questions, please call me at 817.698.8719.
Sincerely,
R�Yne.APE
Project Manager
Attachments
jAECOM
MCOM
1200 Summit Avenue,Suite 600,Fort Worth,Texas 76102.4409
T817.698,6700 F817,698.6701 mmaecom.com
Memorandum
Date November 3, 2008
To Dena Johnson
From Rick Zohne
Subject Storm Water Utility improvements Additional Services Justification
DOE No. 5422
Additional Services Task Justification Information:
Design Surveys: Per Truett Wilson,the linear foot cost for topographic survey performed by
Gorrondona and Associates,Inc.is$3.25 per linear foot.
Milam Street Tree Survey,Steve Eubanks requested using an arborlst to provide speciation
for trees in parkways along the Milam Street project route during the last review meeting.
Melinda Adams,COFW Arborist recommended utilizing the services of Larry Schaapveld for this
task.
Neighborhood Drainage and Exhibits Preparation Presentation:The task fee has been reduced
to$2,060.00.
Utility Coordination:The fee has been reduced to$554,00.Although the city distributes plans to
the franchise utilities, the consultant PM invariably handles coordination issues required. Fiber optic
lines In addition to the usual utilities found in residential streets are prevalent in the project design
locations.
City of Arlington Coordination:The coordination fee has been reduced to$1,216.00.
The basis for the fee estimated accounts for three hours of Tony's time and 4 hours of my
time over the duration of project.Design review, revisions,drive time,coordinating inter-city
agreements with both cities,verbal and etectronle mail communication time required were elements
factored in the task fee.
Please call Tony or myself if you would like to discuss.
Sincerely,
�
Xh
Rick Zohne
AECOM
EXHIBIT B-3B
STORM WATER UTILITY DRAINAGE IMPROVEMENTS
MEADOWBROOK DRIVE and EDERVILLE ROAD
MILAM STREET FROM VAN NETTA TO MARTHAS CHANNEL
Part A-Conceptual Design, and Part B- Plans and Specifications
Transportation and Public Works
Total Roadside Ditch and Storm Drain Construction $ 706,290
TPW,Water and Sewer Basic Services Total $ 46x$27
(Construction Cost x 7.8%(ASCE Curve"A")x 85%)
Additional Services:
TPW Draina e1DOE $ 9,750 ($3.251LF)
Design Surveys
Milam Street Tree Survey $ 350 (S. Eubanks request item)
Hec-Ras Ditch Analysis $ 6,495
Exhibits Preparation and Public Meeting $ 2,060
Franchise Utility Coordination $ 555
City of Arlington Coordination $ 1,216
10% Markup for Subs $ 1,010
Addnl.Services TPW/DOE: $ 21,436
Additional Services Total: $ 21,436
TOTAL PROJECT FEE $ 68,263
STORM WATER UTILITY DRAINAGE IMPROVEMENTS_ 3
_ MEADOWBROOK DRIVE FROM EDERVILLE RD.TO DOTTIE LYNN BOULEVARD
CITY OF FORT WORTH PROJECT
ECT NO'00482,13 NO.6422, TCB PROJECT NO,60012873
LTCB PROJECT NO.6001 83
�-
PAY _ TOTAL UNIT Svom Draln Construcllvn
ITEM UNIT ITEM DESCRIPTION QTY PRICE QTY AMOUNT
1 LS (UTILITY ADJUSTMENT Exlstln S rinkier S stem f 1 $3,500.00 1.0000 $ 3,500
2 SF SAWCUT AND REMOVE EXISTING CONCRETE DRIVEWAY 360 S4.00 360 S 1,440
3 CY UNCLASSIFIED CHANNEL EXCAVATION 1,070 518.00 1070 $ 19,260
4 CY UNCLASSIFIED TRENCH EXCAVATION 3,000 $3.75 1070 $ 4,013
5 LF PROPOSED 27-INCH CL III RCP ALL DEPTHS 220 $105.00 220 $ 23,100
6 LF PROPOSED 30-INCH CL III RCP ALL DEPTHS 9.000 $110.00 1,000 $ 110,000
7 LF PROPOSED 33-INCH CL III RCP ALL DEPTHS 390 5115.00 390 $ 44,850
8 LF PROPOSED 36-INCH CL III RCP ALL DEPTHS 430 $120.013 430 $ 61,600
9 LF PROPOSED 42-INCH CL III RCP ALL DEPTHS 990 $140.00 190 $ 26,600
10 LF PROPOSED 48-INCH CL III RCP ALL DEPTHS 320 $14500 320 $ 46,400
11 LF PROPOSED 66-INCH CL III ALL DEPTHS 740 $155.00 740 S 114,700
12 LF PROPOSED 66-INCH CL HDPE ALL DEPTHS 60 $14500 601$ 8,7G0
13 EA PROPOSED STND. 2 FT.DROP INLET 6 $600.00 6 $ 3.600
14 EA PROPOSED STND. 4 FT.DROP INLET 1 $700,01) 1 $ 700
15 EA PROPOSED STND. 5 FT.DROP INLET 1 $800.00 1 $ 800
16 EA PROPOSED STND. 10 FT.CURB INLET 2 $2,500.00 2 $ 5,000
17 EA PROPOSED STND. 20 FT.CURB INLET 2 $4,400.00 2 $ 8.800
18 EA 5 FT.SQUARE STORM DRAIN MANHOLE 3 $1,850.00 3 $ 5,550
19 EA fib INCH TYPE"B"HEADWALL 1 $850000 1 $ 8,500
20 CY GROUTED ROCK RUBBLE RIPRAP AT OUTFALL 15 $95.00 15 $ 1,425
21 TON HMAC for DRIVEWAY REPAIR 8"Thick 7 $125.00 7 $ 875
22 SF CONCRETE DRIVEWAY REPAIR 6"ThICk 360 $8.00 360 $ 2,080
23 SY SODDING 5200 $1.00 5200 $ 6,200
24 CY TOPSOIL 475 $16.00 475 $ 7,600
25 LF TRENCH SAFETY 3.350 $1.00 3350 $ 3.350
26 SY PAVEMENT 2-INCH HMAC ON 6 INCH FLEX BASE-TEMPORARY 34 $26.00 34 $ 884
27 LF PAVEMENT 2-INCH HMAC ON 2127 CONC,BASE STR-028 60 $65.00 1747 $ 913,555
28 LS EROSION CONTROL 1 $6,000.00 1 $ 6,000
29 LF 8-Inch WATER LOWERING 1 $5,500.00 1 $ 5,500
30 EA RELOCATE I-INCH COPPER SERVICE 8 $200.00 8 $ 1,603
31 EA RELOCATE METER BOX 8 $200.00 8 S 1,600
32 LS TRAFFIC CONTROL 1 $4,500.00 1 5 4,500
! I SUBTOTAL TOTAL( i $ '642 082
10%CONTINGENCY] I s 64,208
I TOTAL! I I $ 708,290
GRAND TOTAL; I I I S 706.290