HomeMy WebLinkAboutContract 35274-A5 (2) CITY SECRETARY cowwr too. -7--7�l�a ss AMENDMENT No.5 TO CITY SECRETARY CONTRACT No. 3-5'� WHEREAS, the City of Fort Worth (CITY) and AECOM, (ENGINEER) made and entered into City Secretary Contract No. 35274, (the CONTRACT) which was authorized by M&C C-22038 on the 3rd day of April, 2007 in the amount of $ 128, 780; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $19, 470 which was administratively authorized on May 8, 2008, Amendment Number 2 in the amount of $68, 263 which was authorized by M&C # C-23774 on September 15, 2009, Amendment Number 3 in the amount of $128, 829 which was authorized by M&C # C-24687 on February 11, 2011, Amendment Number 4 in the amount of $38, 777 which was administratively authorized on October 19, 2011; and WHEREAS, the CONTRACT involves engineering services for the following project: Milam-Rohinhood, Far East Fort Worth Drainage and Wilbarger-Hughes Storm Drain Extension, Project No. 00482; and WHEREAS, it has become necessary to execute Amendment No. 5 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated Jane 14, 2013, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $9, 700. (See Attached Funding Breakdown Sheet, Page -3-) err rn Cl) 2. m Z C=) Article II of the CONTRACT is amended to provide for an increase in A the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $393, 819. 00. 6 y City of Fort Worth p Professional Services Agreement Amendment Template OFFICIAL.RECORD PMO Official Release 8/1/2012 Page 1 of 3 CITY SECRETARY' FT.WORTH,TX 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER AECOM Technical Services, Inc. Fernando Costa Don D'Adam Assistant City Manager Vice President DATE: DATE: APPROVA RECOMMENDED: J GSJ &j C -J Douglas W. iersig, P.E. Director, Transportation/Pu lic Works Department APPROVED AS TO FORM AND LEGALITY: M&C: ►tI ^ Date: Doug as W. Black Assistant City Attorney ATTEST: FORT 0 �r6 Mary J. a r V City Secretary ° 0 tX City of Fort worth EOFFICIALECORDProfessional Services Agreement Amendment TemplatePMO Official Release 8/1/2012 ETARYPage 2 of 3H,TX FUNDING BREAKDOWN SHEET City Secretary No. 35247 Amendment No. 5 Department Fund-Account-Center Amount TPW P227 531200 2052800482 30 $9, 700 . 00 Total : $9, 700 . 00 City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 3of3 P'ZCOM AECOM 972 735 3000 tel 16000 Dallas Parkway 972 735 3001 fax Suite 350 Dallas,Texas 75248 www.aecom.com June 14, 2013 Mr. Michael Perkins, PE, CFM City of Fort Worth 900 Monroe Street, Suite 404 Fort Worth, Texas 76102 Subject: Project No. 00482 Storm Water Utilities—Far East Drainage Improvements Additional Services Request#5 Dear Mr. Perkins: Please accept this request for additional services in response to our recent discussions on June 5, 2013 regarding the Far East Drainage Improvements Project. AECOM has been requested to perform additional services outside the current scope of work to address additional items that have developed since the 90% submittal in May 2011. Following is a summary of tasks considered to be additional services along with a breakdown of fees. Per our contract, we respectfully request approval of the additional scope and fee in order to close out the contract as discussed in our meeting on June 5, 2013. 1.0 WATER QUALITY STRUCTURE DESIGN The City requested evaluation of potential for the installation of water quality structure(s)(WQS)on the proposed storm drain system for purposes of trash/debris control and removal. Locations for potential WQS's have been evaluated by AECOM, providing the following services in support of the design of these structures: • Review design parameters for SNOUT as provided by manufacturer, and develop size and location of water quality structure(s); ■ Coordinate with City and manufacturer on design details. 2.0 SYSTEM OUTFALL -ALTERNATE OUTFALL CONCEPTS The current system outfall design, as submitted to the City in May 2011, consists of approximately 130 linear feet(LF)of 60-inch RCP and 100 LF of 7'x5' RCB, with an energy dissipater structure at the outlet and three(3)grade control structures in the downstream channel to protect against erosive velocities. Based on input from homeowners in the project area and our meeting with the City on March 28, 2012, outfall design alternates have been prepared such that the enclosed system is extended an additional 700 LF+/-to an existing pond located within the City of Arlington. Three (3) alternate design concepts were developed for the original alignment as follows: 1. Extend RCB to existing pond with outlet structure discharge elevation at or above normal water elevation of the pond. 2. Extend RCB to existing pond in buried condition with outlet structure to be constructed in submerged condition as required to avoid existing water and sewer utilities located along pond embankment. 3. Develop outfall alternate that extends a buried closed conduit system to just west of the existing sewer and water utilities. Alternate to include"bubble-up"outlet structure to the west of the utilities with a reduced capacity closed conduit system that extends to discharge at or above normal pool elevation of the existing pond. ►a OM Mr. Michael Perkins, PE, CFM June 14, 2013 Page 2 3.0 GRETA LANE REALIGNMENT CONCEPT AECOM was requested by the City to develop an alignment concept that evaluated the feasibility of relocating the project outfall from its current location, to an alignment within Greta Lane. AECOM prepared a concept plan and profile sheet of the Greta Lane alignment based on existing utilities and easements in the area. In addition,AECOM was requested to support the City in obtaining a temporary right-of-entry(ROE)from the property owner at 2113 Greta Lane for purposes of performing a field review of the concept alignment. This included the following: • Prepare temporary ROE letter and agreement based on templates provided by the City; • Prepare ROE exhibit in support of the agreement; • Coordinate with City on comments provided by property owner on agreement, including review of indemnification language requested by the property owner. COMPENSATION Services for the scope of services described above will be provided for a Lump Sum basis fee of $9,708 in accordance with the terms and conditions of the existing agreement for services dated April 3, 2007. The proposed fee is based on fee breakdown provided in the task summary below and in the attached "Exhibit A" and is inclusive of required basic services. A summary of the total project fee is as follows: Basic Fee Date Total MIWBE Percent 1. Original Contract 04/03/2007 $128,780 $32,080 24.9% 2. Amendment#1 05/08/2008 $19,470 $17,700 90.9% 3. Amendment 42 09/15/2009 $68,253 $10,100 14.8% 4. Amendment#3 02/11/2011 $128,829 $18,174 14.1% 5. Amendment#4 10/19/2011 $38,777 $0 0.0% 6. Amendment#5 (Current Request) 1.0 Water Quality Structure Design $2,295 2.0 System Outfall—Alternate Outfall Concepts $4,145 3.0 Greta Lane Realignment Concept $3,260 Total Amendment#5 $9,700 $0 0.0% TOTAL BUDGET $393,819 $78,054 *19.8% 'Note:The original City MIWBE participation goal was 22%. We appreciate the opportunity to continue our work on this project with you. Should you have any questions or require additional information, please do not hesitate to contact Greg Crews at 972.735.3031. Sincerely, f Don D'Adam, PE Greg Crews, PE Vice President Project Manager Enclosures: Exhibit A—Level of Effort Spreadsheet §c / - e.!]jJ2i � j= : , � 2 ) � 7z ® o J , kLoE ] R [ 72 � CL e « ■ � - q) § o mjo� mz o /) E � A27 6,05 CL % = r kk } = o < ew - 7 LL Lu twl a ) § ® k ( rm}/ � �f§ �!( m\® w; 772 _ )»k /4§ ƒ!/ /�[