Loading...
HomeMy WebLinkAboutContract 37013-A5 CITY SECRETARY AMENDMENT No.5 CONTRACT N0. 37013 -P6 TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and Associates, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 37013, (the CONTRACT) which was authorized by M&C C-22765 on the 15th day of April, 2008 in the amount of $2 ,533,113.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment No. 1 in the amount of $1,580,000 . 00 which was authorized by M&C C- 25303, Amendment No. 2 in the amount of 1, 896, 000 . 00 which was authorized by M&C C-26276 on May 21, 2013 and Amendment No.3 in the amount of $1, 736,800 .00 which was authorized by M&C C- 26838 on June 10, 2014 and Amendment No. 4 in the amount of $1,596, 900 .00 which was authorized by M&C C-27628 on February 16, 2016; and WHEREAS, the CONTRACT involves engineering services for the following project: Water and Sanitary Sewer Main Relocations for the Trinity River Vision (TRV) - Central City Project and the Trinity Uptown Service Area, Phase 1 - Bridge and Channel Relocations; and WHEREAS, it has become necessary to execute Amendment No. 5 to the CONTRACT to include an increased scope of work and revised fee. NOWTHEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated November 14, 2018, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $589,800 .00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $9, 932, 613. 00 . 3. All other provisions of the Contract, which are not expressly ,,g 22";t nded herein, shall remain in full force and effect. ov sEc CITY SECREW Page -1- FT amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth Kimley-Horn and Associates, Inc. Jesus J. Chapa Glenn Gary, P.E. Assistant City Manager Senior Vice-President DATE: " l DATE: APPROVAL RECO/M ENDED: Chris Harder, P.E. Director, Water Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements . Name of Empl yee asvx Title: Project Manager APPROVED AS TO FORM AND LEGALITY: M&C: C-29040 86.P7 Date: February 12 , 2019 Douglas W. Black Form 1295 : 2018-425646 Senior Assistant City Attorney ATTEST: O�F0)RT0 U :T ;* Mar J. Ka er , OFFICIAL RECORD City Secretary- 'S 1LXA CITY SECRETARY FT WORTH,TX Page -2- Kimley>>>Horn November 14, 2018 Mr. Liam Conlon Project Manager City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth, TX 76102 RE: City's Water& Sanitary Sewer Relocations for the Trinity River Vision Central City Project& the Trinity Uptown Service Area Phase 1—Bridge and Channel Relocations Amendment No. 5—Phase 5 KHA No. 061018052 Dear Liam: Kimley-Horn and Associates, Inc. is pleased to submit our Amendment No. 5 for the City's Trinity River Vision Project. Attached is the additional scope of services (Attachment A) and the following is a summary of the individual project descriptions and the scope and fee per project for Amendment No. 5. The fees for this Amendment, as stated in Attachment B, are not to exceed$589,800, increasing the total not to exceed fee to$9,932,613. Part 10 — Channel Segment A $340,800 o This project consists of water and sanitary sewer relocations associated with the USACE Channel Segment A Project and includes approximately 1,750 LF of 12-inch water line and 4,700 LF of 8-to 24-inch sanitary sewer line in order to clear conflicts for the USACE. The project area encompasses the N Main Street/N Houston Street area north of downtown Fort Worth. o Amendment 5 includes the following project phases: ■ Bidding Phase Services ■ Construction Phase Services • Right-of-Way and Easement Services Design Program Management $200,000 o This Amendment includes 12 months of overall program management for the Water and Sanitary Sewer Relocations for the Trinity River Vision Central City Project. This includes project kickoff meetings, coordination meetings, monthly reporting, scheduling, capital planning and tracking and other tasks necessary to manage the program as a whole. Kim ep Horn Page 2 USACE Plan Reviews $9,000 o This project includes the review of the USACE Bypass Channel, Valley Storage, Ecosystem Restoration, and/or Recreation Plans for impacts to the City's water and sanitary sewer systems. o Amendment 5 includes the following anticipated projects: • 20.06&20.07 Gateway/Oxbow Sites H & I Construction—Valley Storage ■ 23 Bypass Channel North Segment Additional Services $40,000 o The City has requested we allocate an amount for unanticipated services for this project. For the services listed above, the following table summarizes the fee per Work Phase: Work Phase Water Sewer Total 31 $57,486 $117,894 $175,380 32 $114,972 $235,788 $350,760 33 $19,162 $39,298 $58,460 51 $1,040 $4,160 $5,200 Total Project $192,660 $397,140 $589,800 Suite801 Cherry Street, Unit 11, • �� Kimley>>>Horn Page 3 For the services listed above,the recommended breakdown for FWCC and Non-FWCC services is as follows: Description FWCC Non-FWCC Total Part 10 Channel Segment A $272,640 $68,160 $340,800 Design Program Management $200,000 $0 $200,000 Mitigation Areas $9,000 $0 $9,000 Additional Services $0 $40,000 $40,000 Total Project $481,640 $108,160 $589,800 The following table summarizes our recommended budget revisions and shows the revised total contract amount: Original Amend Amend Amend Amend Amend Revised Description Fee No. 1 No. 2 No. 3 No. 4 No. 5 Contract Pre- Engineering $ 243,500 $ 221,300 $ 307,300 $ 294,800 $ 464,250 $ 249,000 $1,780,150 Conceptual Engineering $ 365,413 $ 345,400 $ 157,100 $ 230,800 $ 77,000 $ 0 $1,175,713 Preliminary Construction Plans $ 852,500 $ 520,500 $ 525,800 $ 535,500 $ 173,300 $ 5,200 $2,612,800 Final Construction Plans $ 974,200 $ 434,000 $ 502,900 $ 87,000 $ 282,900 $ 0 $2,281,000 Pre- Construction Services $ 30,400 $ 40,600 $ 57,900 $ 37,500 $ 18,700 $ 25,000 $ 210,100 Construction Phase Services $ 67,100 $ 18,200 $ 345,000 $ 551,200 $ 580,750 $ 310,600 $1,872,850 Total Project $2,533,113 $1,580,000 $1,896,000 $1,736,800 $1,596,900 $ 589,800 $9,932,613 801 - - • 0 Ft.Worth, 0 Kim ey>>>Horn Page 4 Kimley-Horn will subcontract a portion of these services to Gorrondona&Associates, Inc.; PIC- Printing, LLC; and Lamb-Star Engineering, MNVBE subconsultants. The amount we will be subcontracting is$204,300. This represents an MNVBE participation percentage of 34.6%for these additional services. With these Additional Services, our revised contract amount will be$9,932,613. This will revise our total contract MNVBE participation from$2,685,894.92(28.7%)to$2,890,194.92 (29.1%). The water and sewer design fees are as follows: Water Sanitary Sewer Original Contract $ 1,346,789 $ 1,186,324 Phase 2A $ 462,400 $ 1,117,600 Phase 2B $ 732,800 $ 1,163,200 Phase 3 $ 669,700 $ 1,067,100 Phase 4 $ 290,549 $ 1,306,351 Phase 5 $ 192,660 $ 397,140 Total Project $3,694,898 $ 6,237,715 We appreciate the opportunity to be of continued service to the City. Please contact us if we need to provide any further information. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. Texas Registration No, F-928 /Glenn A. Gary, P.E. Sr. Vice President GAG:ctd K:IFTW Ulililies10610180521PPPIPhase 5 COntract%TRVAmendment5SummaryUrdocx ATTACHEMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION-CENTRAL CITY PROJECT-PHASE 5 CITY PROJECT NO.00969 ATTACHMENT "A' Scope for Engineering Design Related Services for Water and Sanitary Sewer Relocations DESIGN SERVICES FOR WATER AND SANITARY SEWER RELOCATIONS FOR THE TRINITY RIVER VISION —CENTRAL CITY PROJECT: PHASE 5 CITY PROJECT NO. 00969 General Scope of Services The scope set forth herein defines the work to be performed by the ENGINEER in conjunction with the PROJECT. Both the CITY and ENGINEER have attempted to define services to be performed and address the needs of the PROJECT through September of 2018. OBJECTIVE The objective of this PROJECT is to facilitate the relocation of the CITY's water and sanitary sewer facilities that are in conflict with the Trinity River Vision improvements, and to relocate or rehabilitate those facilities for the Panther Island Redevelopment Project. WORK TO BE PERFORMED Task 1. Design/Program Management Task 2. Conceptual Design Task 3. Preliminary Design Task 4. Final Design Task 5. Bid Phase Services Task 6. Construction Phase Services Task 7. ROW/Easement Services Task 8. Survey Services Task 9. Permitting Task 10. Holly Analysis Task 11. Development Analysis Task 12. USACE Plan Reviews Task 13. Ham Branch Study Task 14. Panther Island Sanitary Sewer Master Plan Task 15. Additional Service CITY OF FORT WORTH,TEXAS ATTACHMENT A REVISION DATE:08.22.14 PAGE 1 OF 21 ATTACHEMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVERVISION-CENTRAL CITY PROJECT-PHASE 5 CITY PROJECT NO.00969 TASK 1. DESIGN/PROGRAM MANAGEMENT Anticipated durations 12 months (October 2017 to September 2018) 1.1 Kick-Off Meeting: None 1.2 Regular Period Meetings: Attend regular periodic meetings as required by CITY and TRVA. The number of meetings is only intended to be an approximation of the frequency and content of the meetings. A. Semi-monthly CITY Progress Meetings: Conduct and document eighteen (18) semi- monthly PROJECT update meetings with the CITY PROJECT Manager B. Semi-monthly TRV and CITY Coordination Meetings: Conduct eighteen (18) semi- monthly PROJECT update meetings with CITY' PROJECT Manager, Other CITY Consultants, and TRV PROJECT partners. Prepare and distribute meeting notes and action items. C. Franchise Utility Progress Meetings: Attend three (3) franchise utility PROJECT update meetings with CITY PROJECT Manager and TRV PROJECT partners. D. Weekly TRV CITY Program Manager's Progress Meetings: Attend approximately thirty-six (36) weekly TRV CITY Program Manager's progress meetings. E. Semi-monthly TRVA PROJECT Managers Review Meetings: Attend approximately eighteen (18) semi-monthly TRVA PROJECT Managers review meetings. F. Quarterly USACE Coordination Meetings: Attend two (2) quarterly USACE PDT meetings for PROJECT coordination. 1.3 City Reporting: A. Progress Reports B. Monthly Schedule Update: Prepare twelve (12) monthly PROJECT schedule status updates to be provided to both CITY and TRVA. The schedules should reflect all of the CITY's PROJECT Parts associated with this contract, appropriately labeled to distinguish between FWCC and Non-FWCC PROJECT Parts. The design schedule will not be cost loaded with the consultant's fees. C. M/WBE Reporting: Complete twelve (12) Monthly MM/BE Report Forms for both TRVA and the CITY. Submit M/WBE Change forms as necessary for any changes in M/WBE Status. D. Monthly Invoices and PROJECT Tracking by PROJECT Part: Prepare twelve (12) monthly invoices that meet the CITY and TRVA invoice format requirements. CITY OF FORT WORTH,TEXAS ATTACHMENT A REVISION DATE:08.22.14 PAGE 2 OF 21 ATTACHEMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION-CENTRAL CITY PROJECT-PHASE 5 CITY PROJECT NO,00969 1.4 TRV Program Reporting: Facilitate coordination of PROJECT financial information and track status A. PROJECT Cost Monthly Update: Prepare and update monthly a spreadsheet that tracks each PROJECT Part including projected Construction and Engineering Cost, changes to the projected Construction and Engineering Cost, and actual Construction and Engineering Cost. B. Monthly CITY Actuals Reporting: Review the CITY's Water and Sanitary Sewer, Storm Drain, Franchise, Bridges and Local Street Modifications monthly Project Management Reports and prepare twelve (12) Actual vs. Budget Cost Summary Reports. C. Monthly Contracted and Reimbursable Tracking D. CIP Coordination: The quarterly coordination of the CITY's Five-Year CIP to verify how each PROJECT Part is included in each fiscal year budget. Cost shall be summed by fiscal year. E. Quarterly TRVA Schedule Review: Perform four(4) quarterly reviews of modifications to the TRVA schedule and report potential impacts to both TRVA and CITY. Coordinate with both TRVA and CITY as CITY and TRVA work to achieve a schedule that is mutually agreed upon by each party. F. TRVA PROJECT Change Form: None. 1.5 Coordination of other CITY Consultants: Facilitate action items/tasks for other CITY Consultants as a result of the TRVA PROJECT Managers meeting. Services may include delegation of tasks and conducting additional meetings associated with the directives of the PROJECT Managers meeting. 1.6 Deliverables A. Monthly M/WBE Reporting to both TRVA and CITY B. Meeting Notes and action items from TRV and CITY Monthly coordination meeting C. TRVA Monthly schedule updates with schedule narrative describing any current or anticipated schedule changes D. CITY Monthly schedule updates with schedule narrative describing any current or anticipated schedule changes E. Monthly invoices F. Monthly CITY Actual vs. Budget Cost Summary Report G. Capital Tracking Spreadsheet (Quarterly) CITY OF FORT WORTH,TEXAS ATTACHMENT A REVISION DATE:08.22,14 PAGE 3 OF 21 ATTACHEMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION-CENTRAL CITY PROJECT-PHASE 5 CITY PROJECT NO.00969_ TASK 2. CONCEPTUAL DESIGN (30 PERCENT) There are no projects included in the conceptual design task for the Phase 5 contract. Water Relocations Name Size Range Length (LF) Water Subtotal Sewer Relocations Name Size Range Length (LF) None Sewer Subtotal Total CITY OF FORT WORTH,TEXAS ATTACHMENT A REVISION DATE:08.22.14 PAGE 4 OF 21 ATTACHEMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION-CENTRAL CITY PROJECT-PHASE 5 CITY PROJECT NO,00969 TASK 3. PRELIMINARY DESIGN (60 PERCENT) There are no projects included Preliminary Design task for the Phase 5 contract. Water Relocations Name Size Range Length (LF) Water Subtotai Sewer Relocations Name Size Range Length (LF) None Sewer Subtotal Totai CITY OF FORT WORTH,TEXAS ATTACHMENT A REVISION DATE:08.22.14 PAGE 5 OF 21 ATTACHEMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS OR TRINITY RIVER VISION-CENTRAL CITY PROJECT-PHASE 5 CITY PROJECT NO.00969 TASK 4. FINAL DESIGN (90 PERCENT PLANS) AND FINAL CONSTRUCTION DOCUMENTS (100 PERCENT PLANS) There are no projects included Preliminary Design task for the Phase 5 contract. Water Relocations Name Size Range Length (LF) Water Subtotal Sewer Relocations Name Size Range Length (LF) Sewer Subtotal Total CITY OF FORT WORTH,TEXAS ATTACHMENT A REVISION DATE:08.22.14 PAGE 6 OF 21 ATTACHEMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION-CENTRAL CIN PROJECT-PHASE 5 CITY PROJECT NO.00969 TASK 5. BID PHASE SERVICES The Part 10 Channel Segment A project may have to be re-bid due to eliminating the Grand Ave Bypass Storm Drain, Part 3 project that was included in the bid. Name Bid Packages Part 10 Channel Segment A 1 Total 1 5.1 General A. The ENGINEER will update the Bidding Documents to remove the Grand Ave Bypass Storm Drain, Part 3 project. 5.2 Advertisement A. The CITY will publish the Invitation to Bidders in the local paper of record. 5.3 Issuing Bid Sets A. Make available at an agreed location sufficient copies of the Bidding Documents to distribute to potential bidders. B. Upload Bidding Documents to Buzzsaw for electronic distribution C. The ENGINEER may charge a non-refundable fee up to $100 per set of Bidding Documents. D. Issue Bidding Documents to four (4) Plan Rooms as determined by the CITY. E. Maintain a log of all plan holders. 5.4 Request for Information A. Receive requests for information from prospective bidders and maintain a log of bidder's significant questions. B. Provide technical interpretations of the Contract Documents. C. Send written clarifications to all plan holders. 5.5 Addenda A. Issue Addenda as necessary when clarifications require a modification to the Contract Documents. 5.6 Pre-bid Meeting A. Conduct a pre-bid meeting for each PROJECT Part as indicated in the Table above. CITY OF FORT WORTH,TEXAS ATTACHMENT A REVISION DATE:08.22.14 PAGE 7 OF 21 ATTACHEMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS =OR TRINITY RIVER VISION-CENTRAL CITY PROJECT-PHASE 5 _ CITY PROJECT NO,00969 5.7 Bid Opening A. Attend bid opening held at the CITY. 5.8 Recommendation of Award A. Obtain Bidder's proposals from the CITY. B. Review all bids for completeness and prepare a hid tabulation of all Bidder proposals. C. Evaluate the apparent low bidder and the two (2) Subsequent low bidders. D. Verify the qualification and the acceptability of thE; low bidder. E. Prepare a letter to the CITY with a recommendation of award. 5.9 Conformance Documents A. Incorporate all addenda into the construction plans and the project manual. 5.10 Contract Execution A. Prepare three (3) copies of the conformed Construction Documents for each bid package to be executed by the CITY and the Contractor per bid package. 5.11 Deliverables A. Addenda and Clarifications B. Upload to Buzzsaw bidding documents (construction plans and project manuals). C. Ten (10) sets of bidding documents (construction plans and project manuals) for each bid package, if Buzzsaw is not used exclusively-for bidding D. Three (3) sets of conformed bidding documents for execution for each bid package E. One (1)Award Letter for each Bid Package F. One (1) Bid Tabulation for each Bid Package G. Ten (10) full size (22"x34") Ten (10) half size (11"x 17") of Conformed Plans and Specifications for Preconstruction Meeting for each Bid Package. CITY OF FORT WORTH,TEXAS ATTACHM ENT A REVISION DATE:08.22.14 PAGE 8 OF 21 ATTACHEMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION-CENTRAL CITY PROJECT-PHASE 5 CITY PROJECT NO.00969 TASK 6. CONSTRUCTION PHASE SERVICES Name Anticipated Months of Submittal Construction Construction Construction Review: Services Duration in This CITY/ Activity: Contract ENGINEER Part 10 Channel 10 Mo. 10 Mo. ENGINEER Weekly/Daily Segment A 6.1 Public Meeting A. The CITY shall be responsible for establishing the location and mailing the invitation for the public meeting. B. Attend one (1) Public Meetings for each PROJECT Part. C. Prepare up to two (2) exhibits for each PROJECT Part for use in the public meeting. 6.2 Construction Support Services: Provide professional construction phase services for construction of the proposed PROJECT Part for the purpose of providing assistance to CITY during construction. The CITY will provide construction management services and inspection for the PROJECT Part. This scope of services does not include construction phase services related to inspections or testing, applications for payment, disagreements between the CITY and the Contractor, or determination of substantial completion. The following services will be performed for the construction contract: A. Preconstruction Meeting 1. Attend a preconstruction conference for each PROJECT Part as determined by the CITY. 2. Prepare and distribute Meeting Notes. B. On-site Observation 1. Make site visits at intervals as directed by CITY in accordance with the table above in order to observe the progress of the work. a. Such visits and observations by ENGINEER are not intended to be exhaustive or to extend to every aspect of Contractor's work in progress. Observations are to be limited to spot checking, selective measurement, and similar methods of general observation of the Work based on ENGINEER'S exercise of professional judgment. Based on information obtained during such visits and such observations, ENGINEER will evaluate whether Contractor's work is generally proceeding in accordance with the Contract Documents, and ENGINEER will keep CITY informed of the general progress of the Work. CITY OF FORT WORTH,TEXAS ATTACHMENTA REVISION DATE:08.22.14 PAGE 9 OF 21 ATTACHEMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION-CENTRAL CITY PROJECT-PHASE 5 _ CITY PROJECT N0.00969 b. The purpose of ENGINEER'S site visits will be to enable ENGINEER to better carry out the duties and responsibilities specifically assigned in this Agreement to ENGINEER, and to provide CITY a greater degree of confidence that the completed Work will conform in general to the Contract Documents. ENGINEER shall not, during such visits or as a result of such observations of Contractor's work in progress, supervise, direct, or have control over Contractor's work, nor shall ENGINEER have authority over or responsibility for the means, methods, techniques, equipment choice and usage, sequences, schedules, or procedures of construction selected by Contractor, for safety precautions and programs incident to Contractor's work, nor for any failure of Contractor to comply with laws and regulations applicable to Contractor's furnishing and performing the Work. Accordingly, ENGINEER neither guarantees the performance of any Contractor nor assumes responsibility for any, Contractor's failure to furnish and perform its work in accordance with the Contract Documents. C. Progress Meetings 1. Attend progress meetings twice a month and visit the site for observation at that time. D. Shop drawing, samples and other submittals Review 1. Review submittals according to the table above. 2. Review shop drawings, samples and other submittals submitted by the contractor for general conformance with the design concepts and general compliance with the requirements of the contract for construction. 3. Such review, approvals or other action will not extend to means, methods, techniques, equipment choice and usage, sequences, schedules, or procedures of construction or to related safety precautions and programs and shall not relieve the Contractor from its responsibility for performance in accordance with the contract for construction, nor is such review a guarantee that the work covered by the shop drawings, samples and submittals is free of errors, inconsistencies or omissions. 4. Log all shop drawings, samples and other submittals. E. Substitutions 1. Evaluate and determine the acceptability of up to ten (10) substitute or "or- equal" materials proposed by Contractor in accordance with the Contract Documents, but subject to the provisions of applicable standards of the state or the CITY. F. Request for information (RFI): 1. Provide necessary interpretations and clarifications of contract documents, and make recommendations as to the acceptability of the work. ENGINEER will respond to reasonable and appropriate Cc;ntractor requests for information and issue necessary clarifications and interpre:ations of the Contract Documents to CITY OF FORT WORTH,TEXAS ATTACHMENT A REVISION DATE;08.22.14 PAGE 10 OF 21 ATTACHEMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION-CENTRAL CITY PROJECT-PHASE 5 CITY PROJECT NO.00969 CITY as appropriate to the orderly completion of Contractor's work. Any orders authorizing variations from the Contract Documents will be made by CITY. G. Change Orders 1. Provide support for Change Orders as requested by the CITY. Change Order support may include review and recommendations to the CITY for the execution of change orders. H. Final PROJECT Part Walk Through 1. Attend the "Final" PROJECT Part walk through and assist with preparation of final punch list. Attend one (1)final site visit to determine if the completed Work of Contractor is generally in accordance with the Contract Documents. a. ENGINEER shall not be responsible for the acts or omissions of any Contractor, or of any of their subcontractors, suppliers, or of any other individual or entity performing or furnishing the Work. ENGINEER shall not have the authority or responsibility to stop the work of any Contractor. 6.3 Sanitary Sewer Service Site Plans A. The Contractor shall provide the ENGINEER flow line information for service line relocations, where the elevation of the service line was unable to be determined during the design. B. Provide two (2) Service line relocation design details which provide the line and grade to relocate the service based on the information provided by the Contractor. 6.4 Resident Project Representative: ENGINEER will provide resident PROJECT representation services for construction of each PROJECT Part for the purpose of providing assistance to CITY during construction. A. ENGINEER shall furnish a Resident PROJECT Representative ("RPR"), assistants, and other field staff to assist ENGINEER in observing progress and quality of the Work. The RPR, assistants, and other field staff under this Task may provide half time representation or may provide representation to a lesser degree. B. Through such additional observations of Contractor's work in progress and field checks of materials and equipment by the RPR and assistants, ENGINEER shall endeavor to provide further protection for CITY against defects and deficiencies in the Work. However, ENGINEER shall not, during such visits or as a result of such observations of Contractor's work in progress, supervise, direct, or have control over Contractor's work nor shall ENGINEER have authority over or responsibility for the means, methods, techniques, sequences, or procedures selected or used by Contractor, for security or safety at the Site, for safety precautions and programs incident to Contractor's work in progress, for any failure of Contractor to comply with Laws and Regulations applicable to Contractor's performing and furnishing the Work, or responsibility for Contractor's failure to furnish and perform the Work in accordance with the Contract Documents. C. The duties and responsibilities of the RPR are limited to those of ENGINEER in the Agreement with the CITY and in the Contract Documents, and are further limited and described as follows: CITY OF FORT WORTH,TEXAS ATTACHMENT A REVISION DATE;08,22.14 PAGE 11 OF 21 ATTACHEMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION-CENTRAL CITY PROJECT-PHASE 5 CITY PROJECT NO.00969 1. General: RPR is ENGINEER's agent at the Site, will act as directed by and under the supervision of ENGINEER, and will confer with ENGINEER regarding RPR's actions. a. RPR's dealings in matters pertaining to a Contractor's work in progress shall in general be with ENGINEER and Contractor, keeping CITY advised as necessary. b. RPR's dealings with subcontractors shall only be through or with the full knowledge and approval of Contractor. c. RPR shall generally communicate with CITY with the knowledge of and under the direction of ENGINEER. 2. Schedules: Review the progress schedule, schedule of shop drawing and sample submittals, and schedule of values prepared by a Contractor and consult with ENGINEER concerning acceptability. 3. Conferences and Meetings: Attend meetings with Contractor, such as preconstruction conferences, progress meetings, job conferences and other PROJECT-related meetings, and prepare and circulate copies of minutes thereof. 4. Liaison a. Serve as ENGINEER's liaison with Contractor, working principally through Contractor's superintendent, and assist in providing information regarding the intent of the Contract Documents. b. Assist ENGINEER in serving as CITY's liaison with Contractor when Contractor's operations affect CITY's on-site operations. c. Assist in obtaining from CITY additional details or information, when required for proper execution of the Work. 5. Interpretation of Contract Documents: Report to ENGINEER when clarifications and interpretations of the Contract Documents are needed and transmit to Contractor clarifications and interpretations as issued by ENGINEER. 6. Shop Drawings and Samples a. Record date of receipt of samples; and approved shop drawings. b. Receive samples which are furnished at the Specific PROJECT Part Site by Contractor, and notify ENGINEER of availability of samples for examination. c. Advise ENGINEER and Contractor of the commencement of any portion of the Work requiring a shop drawing or sample submittal for which RPR believes that the submittal has not been approved by ENGINEER. 7. Modifications: Consider and evaluate Contractor's suggestions for modifications in Drawings or Specifications and report such suggestions, together with RPR's recommendations, to ENGINEER. Transmit to Contractor in writing decisions as issued by ENGINE:E.R. CITY OF FORT WORTH,TEXAS ATTACHMENT A REVISION DATE:08.22.14 PAGE 12 OF 21 ATTACHEMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION-CENTRAL CITY PROJECT-PHASE 5 CITY PROJECT NO.00969 8. Review of Work and Rejection of Defective Work a. Conduct on-Site observations of Contractor's work in progress to assist ENGINEER in determining if the Work is in general proceeding in accordance with the Contract Documents. b. Report to ENGINEER whenever RPR believes that any part of Contractor's work in progress will not produce a completed project that conforms generally to the Contract Documents or will imperil the integrity of the design concept of the completed Specific PROJECT as a functioning whole as indicated in the Contract Documents, or has been damaged, or does not meet the requirements of any inspection, test or approval required to be made; and advise ENGINEER of that part of work in progress that RPR believes should be corrected or rejected or should be uncovered for observation, or requires special testing, inspection or approval. 9. Inspections, Tests, and System Start-ups a. Consult with ENGINEER in advance of scheduled major inspections, tests, and systems start-ups of important phases of the Work. b. Verify that tests, equipment, and systems start-ups and operating and maintenance training are conducted in the presence of appropriate CITY's personnel, and that Contractor maintains adequate records thereof. c. Observe, record, and report to ENGINEER appropriate details relative to the test procedures and systems start-ups. d. Accompany visiting inspectors representing public or other agencies having jurisdiction over a Specific PROJECT, record the results of these inspections, and report to ENGINEER. 10. Records a. Maintain at the Site orderly files for correspondence, reports of job conferences, reproductions of original Contract Documents including all Change Orders, Field Orders, Work Change Directives, Addenda, additional Drawings issued subsequent to the execution of the Contract, ENGINEER's clarifications and interpretations of the Contract Documents, progress reports, Shop Drawing and Sample submittals received from and delivered to Contractor, and other Specific PROJECT-related documents. b. Prepare a daily report or keep a diary or log book, recording Contractor's hours on the Site, weather conditions, data relative to questions of Change Orders, Field Orders, Work Change Directives, or changed conditions, Site visitors, daily activities, decisions, observations in general, and specific observations in more detail as in the case of observing test procedures; and send copies to ENGINEER. CITY OF FORT WORTH,TEXAS ATTACHMENT A REVISION DATE:08.22.14 PAGE 13 OF 21 ATTACHEMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION-CENTRAL CITY PROJECT-PHASE 5 _ CITY PROJECT NO.00969 c. Record names, addresses, fax numbers, e-mail addresses, web site locations and telephone numbers of all Contractors, subcontractors, and major suppliers of materials and equipment. d. Maintain records for use in preparing PROJECT documentation. e. Upon completion of the Work, furnish original set of all RPR Specific PROJECT documentation to ENGINEER. 11. Reports a. Furnish to ENGINEER periodic reports as required of progress of the Work and of Contractor's compliance with the progress schedule and schedule of Shop Drawing and Sample submittals. b. Draft and recommend to ENGINEER proposed Change Orders, Work Change Directives, and Field Orders. Obtain backup material from Contractor. c. Furnish to ENGINEER and CITY copies of all inspection, test, and system startup reports. d. Immediately notify ENGINEER of the occurrence of any Site accidents, emergencies, acts of God endangering the Work, damage to property by fire or other causes, or the discovery of any Constituent of Concern. 12. Payment Requests a. Review Applications for Payment with Contractor for compliance with the established procedure for their submission and forward with recommendations to ENGINEER, noting particularly the relationship of the payment requested to the schedule of values, Work completed, and materials and equipment delivered at the Site but not incorporated in the Work. 13. Certificates, Operation and Maintenance Manuals a. During the course of the Work, verify that materials and equipment certificates, operation and maintenance manuals and other data required by the Specifications to be assembled and furnished by a Contractor are applicable to the items actually installed and in accordance with the Contract Documents, and have these documents delivered to ENGINEER for revie,v and forwarding to CITY prior to payment for that part of the Work. 14. Completion a. Participate in a final inspection in the company of ENGINEER, CITY, and Contractor and prepare a final list of items to be completed and deficiencies to be remedied. b. Observe whether all items on the final list have been completed or corrected and make recommendations to ENGINEER concerning acceptance and issuance of the Notice of Acceptability of the Work. D. Resident PROJECT Representative shall not: CITY OF FORT WORTH,TEXAS ATTACHMENT A REVISION DATE:08.22.14 PAGE 14 OF 21 ATTACHEMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION-CENTRAL CITY PROJECT-PHASE 5 CITY PROJECT NO.00969 1. Authorize any deviation from the Contract Documents or substitution of materials or equipment (including "or-equal" items). 2. Exceed limitations of ENGINEER's authority as set forth in the Agreement or the Contract Documents. 3. Undertake any of the responsibilities of a Contractor, subcontractors, suppliers, or a Contractor's superintendent. 4. Advise on, issue directions relative to, or assume control over any aspect of the means, methods, techniques, sequences or procedures of the Contractor's work unless such advice or directions are specifically required by the Contract Documents. 5. Advise on, issue directions regarding, or assume control over safety practices, precautions and programs in connection with the activities or operations of CITY or Contractor. 6. Participate in specialized field or laboratory tests or inspections conducted off- site by others except as specifically authorized by ENGINEER. 7. Accept Shop Drawing or Sample submittals from anyone other than Contractor. 8. Authorize CITY to occupy a Specific PROJECT in whole or in part. 6.5 Record Drawings A. The ENGINEER shall prepare Record Drawings from information provided by the CITY depicting any changes made to the Final Drawings during construction. The following information shall be provided by the CITY: 1. As-Built Survey 2. Red-Line Markups from Contractor 3. Red-Line Markups from City Inspector 4. Copies of Approved Change Orders 5. Approved Substitutions B. The ENGINEER shall modify the Final Drawings electronically and shall place a stamp on the plans indicating that they represent Record Drawings of the project as constructed. The stamp shall be signed and dated by the ENGINEER and shall be placed on each plan sheet, whether there are any revisions on the sheet or not. Each sheet shall clearly indicate all changes which apply to that sheet by clouding and numbering, or other suitable means. C. The following disclaimer shall be included with the Record Drawing stamp: 1. These Record Drawings were prepared using information provided by others and represent the as constructed conditions to the extent that documented changes were provided for recording. The ENGINEER assumes no liability for undocumented changes and certifies only that the documented changes are accurately depicted on these drawings. CITY OF FORT WORTH,TEXAS ATTACHMENT A REVISION DATE:08.22.14 PAGE 15 OF 21 ATTACHEMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS F 7R TRINITY RIVER VISION-CENTRAL CITY PROJECT-PHASE 5 CITY PROJECT NO.00969 D. The ENGINEER shall submit a set of sealed Fine Drawings, modified and stamped as Record Drawings, on mylar for record storage. The ENGINEER may keep copies of 0 the information provided by the CITY for their fil::s, but all original red-lined drawings shall be returned to the CITY with the mylars. E. Record Drawings shall also be submitted in both Adobe Acrobat PDF format (version 6.0 or higher) format and DWF format. There shall be one (1) PDF file and one (1) DWF file for the TPW plan set and a separate PDF and DWF file for the Water plan set. Each PDF and DWF file shall contain all associated sheets of the particular plan set. Singular PDF and DWF files for each sheet of a plan set will not be accepted. PDF and DWF files shall conform to naming conventions as follows: 1. TPW file name example—'W-1956_rec47.pdf'where "W-1956" is the assigned file number obtained from the CITY, "_rec" designating the file is of a record drawing plan set, "47"shall be the total number of sheets in this file. a. Example: W-0053_rec3.pdf and K-0320 org5.pdf 2. Water and Sewer file name example — "X-35667_rec36.pdf' where "X-35667" is the assigned file number obtained from the CITY, "_rec" designating the file is of a record drawing plan set, "36" shall be the total number of sheets in this file. a. Example: X-12755_rec18.pdf 3. Both PDF and DWF files shall be uploac E)d to the project's Record Drawings folder in Buzzsaw. 6.6 Deliverables A. Two (2) public meeting exhibits B. Twenty(20) Progress Meeting Agendas and Notes C. Responses to Contractor's Requests for Information D. Review of Change Orders E. Review of shop drawings F. One (1) set of mylar plans for record storage CITY OF FORT WORTH,TEXAS ATTACHMENT REVISION DATE:08.22.14 PAGE 16 OF 21 ATTACHEMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION-CENTRAL CITY PROJECT-PHASE 5 CITY PROJECT NO.00969 TASK 7. ROW/EASEMENT SERVICES ENGINEER has provided the CITY with the Part 10 Channel Segment A easement documents and will support the CITY in the acquisitions or these easements based on the direction and guidance from the CITY's PROJECT Manager. CITY OF FORT WORTH,TEXAS ATTACHMENT REVISION DATE:08.22.14 PAGE 170F21 ATTACHEMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION-CENTRAL CITY PROJECT-PHASE 5 CITY PROJECT NO.00969 TASK 8. SURVEY There are no projects included in the Survey task for the Phase 5 contract. Survey Name Survey(LF) None 0 Subsurface Utility Engineering (SUE) Name Level 8 SUE(LF) Level A SUE(EA) None 0 0 CITY OF FORT WORTH,TEXAS ATTACHMENT A REVISION DATE:08.22.14 PAGE 18 OF 21 ATTACHEMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION-CENTRAL CITY PROJECT PHASE 5 CITY PROJECT NO.00969 TASK 9. PERMITTING 9.1 TXDOT A. Prepare Zero (0) permits for utilities accommodation within TxDOT ROW in accordance with the TXDOT UAR. 9.2 Railroads A. Prepare Zero (0) railroad crossings permits 9.3 Trinity River Vision Authority (TRVA)and U.S. Army Corp of Engineers (USACE) A. Prepare Zero (0) submittals to TRVA/USACE 9.4 Trinity River Vision Authority (TRVA)Project Change Requests (PCR) A. Prepare Zero (0) PCRs for TRVA at each of the following milestones: 9.5 Park Land Conversion A. The ENGINEER will prepare and submit Zero (0) City of Fort Worth Park's Department Conversion Application. TASK 10.HOLLY ANALYSIS There is no scope for the Holly Analysis included in the Phase 5 contract CITY OF FORT WORTH,TEXAS ATTACHMENT A REVISION DATE:08.22.14 PAGE 19 OF 21 ATTACHEMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION-CENTRAL CITY PROJECT-PHASE 5 CITY PROJECT NO.00969 TASK 11.DEVELOPMENT ANALYSIS There is no scope for the Development Review Assistance included in the Phase 5 contract. TASK 12.USACE FORT WORTH CENTRAL CITY PLAN REVIEWS 12.1 Review USACE Valley Storage, Ecosystem Restoration, and/or Recreation Plans for impacts to the CITY's water and sanitary sewer systems. Based on the TRVA schedule, the following projects are anticipated for review during this Contract period: A. 20.06—Gateway/Oxbow Sites H & I Construction —Valley Storage 12.2 Review of USACE Bypass Channel Plans for impacts to the CITY's water and sanitary sewer systems. Based on the TRVA schedule, the following projects are anticipated for review during this Contract period: A. 23.01 and 23.02 — Bypass Channel Design — North Segments A and B and Tie-ins A and B TASK 13.HAM BRANCH STUDY There is no scope for the Ham Branch Study included in the Phase 5 contract. TASK 14.PANTHER ISLAND SANITARY SEWER MASTER PLAN There is no scope for the Panther Island Sanitary Sewer Master Plan included in the Phase 5 contract. TASK 15.ADDITIONAL SERVICES 15.1 The City has requested we allocate an amount for unanti(Jpated services for this project. ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES CITY and ENGINEER agree that the following services are beyond the Scope of Services described in . the Tasks above. However, ENGINEER can provide these services, if needed, upon the CITY's written request. Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the PROJECT shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: CITY OF FORT WORTH,TEXAS ATTACHMENT A REVISION DATE:08.22.14 PAGE 20 OF 21 ATTACHMENT A DESIGN SERVICES FOR WATER AND SANTIARY SEWER RELOCATIONS FOR TRINITY RIVER VISION-CENTRAL CITY PROJECT-PHASE 5 CITY PROJECT NO.00969 A. Preparation of Permitting Documents and Coordination for Permits, not listed in Scope of Services. B. Negotiation of easements or property acquisition. C. Services related to development of the CITY's project financing and/or budget. D. Services related to disputes over pre-qualification, bid protests, bid rejection and rebidding of the contract for construction. E. Construction management and inspection services F. Performance of materials testing or specialty testing services. G. Services necessary due to the default of the Contractor. H. Services related to damages caused by fire, flood, earthquake or other acts of God. I. Services related to warranty claims, enforcement and inspection after final completion. J. Services to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. K. Performance of miscellaneous and supplemental services related to the PROJECT as requested by the CITY. CITY OF FORT WORTH,TEXAS ATTACHMENT A REVISION DATE:08.22.14 PAGE 21 OF 21 ATTACHMENT `B" Compensation I. Professional Engineering Services For all professional engineering services included in ATTACHMENT "A", the CITY agrees to pay the ENGINEER on an hourly not to exceed basis. The total amount of the contract will not be exceeded without a modification to this agreement; however, any task may be exceeded as long as the PROJECT total is not exceeded. Recommended budgets are as follows: ■ Task 1 —Design Management $ 200,000 ■ Task 2 —Conceptual Design $ 0 ■ Task 3 —Preliminary Design $ 0 • Task 4—Final Design $ 0 ■ Task 5 —Bid Phase Services $ 25,000 ■ Task 6—Construction Phase Services $ 310,600 ■ Task 7—ROW/Easement Services $ 5,200 ■ Task 8—Survey Services $ 0 ■ Task 9—Permitting $ 0 ■ Task 10—Holly Analysis $ 0 ■ Task 11 —Development Reviews $ 0 ■ Task 12—Mitigation Areas $ 9,000 ■ Task 13—Ham Branch Study $ 0 ■ Task 14—Panther Island Sanitary Sewer Master Plan $ 0 ■ Task 15—Additional Services $ 40,000 Total compensation to be paid to the ENGINEER will not exceed $ 589,800 II. Basis for Compensation The CITY will compensate the ENGINEER for the various items listed above on a reimbursable basis, where the total contract amount may not be exceeded without an amendment, task budget may be exceeded. Labor fee will be billed at 3.5 times the salary cost.Direct reimbursable expenses such as express delivery services, fees, air travel, and other direct expenses will be billed at 1.10 times cost. A percentage of labor fee will be added to each invoice to cover certain other expenses such as telecommunications, in-house reproduction,postage, supplies, project related computer time, and local mileage. Administrative time related to the project will be billed hourly. All permitting, application, and similar project fees will be paid directly by the Client. Fees will be invoiced monthly based on the actual amount of service performed and expenses incurred. Payment will be due within 25 days of your receipt of the invoice EXHIBIT "B-1" MWBE Summary WATER AND SANITARY SEWER RELOCATIONS FOR THE TRINITY RIVER VISION— CENTRAL CITY PROJECT: PHASE 5 CITY PROJECT NO. 00969 Tasks Total Fee MWBE Fee Task 1 —Design Management $200,000 $0 Task 2—Conceptual Design $0 $0 Task 3—Preliminary Design $0 $0 Task 4—Final Design $0 $0 Task 5—Bid Phase Services $25,000 $1,000 Task 6—Construction Phase Services $310,600 $203,300 Task 7—ROW/Easement Services $5,200 $0 Task 8—Survey Services $0 $0 Task 9—Permitting $0 $0 Task 10—Holly Analysis $0 $0 Task 11 —Development Reviews $0 $0 Task 12—USACE Plan Reviews $9,000 $0 Task 13—Ham Branch Study $0 $0 Task 14—Panther Island Master Plan $0 $0 Task 15—Additional Services $40,000 $0 Total Project $589,800 $204,300 (34.6%) MWBE Consultants: Services Fee Gorrondona &Associates, Inc. Survey Services $3,000 PIC Printing, LLC Reproduction Services $1,300 Lamb-Star Engineering, LP RPR Services $200,000 Total $204,300 Non-MWBE Consultants: Services Fee Raymond L. Goodson Jr., Inc. Civil Engineering $21,000 Bennett Trenchless Engineers Trenchless Engineering $11,000 Total $32,000 This attachment is provided for informational purposes only to show the projected plan to meet the MWBE goal of 25%. The actual dollars paid by the ENGINEER to MWBE subconsultants may vary for each task as well as for each subconsultant. The subconsultants listed are those intended for use on this project, but the actual subconsultants used may vary. EXHIBIT "B-2" Water/Sanitary Sewer Breakdown—Phase 5 A. SUMMARY OF TOTAL FEE Service Description Water Sewer Total • Engineering Services $191,620 $392,980 $584,600 Survey Fee $1,040 $4,160 $5,200 Total Fee $192,660 $397,140 $589,800 B. BREAKDOWN OF WATER AND SEWER FEES (Less Survey Fees) 1. Total Water Fee(less Survey Fees)Breakdown by Conceptual,Preliminary and Final Design WP 31. Conceptual(30%) (Total Water Fee-Survey Fees)x(0.3) _ $57,486 WP 32. Preliminary(60%) (Total Water Fee-Survey Fees)x(0.6) _ $114,972 WP 33. Final(10%) (Total Water Fee-Survey Fees)x(0.1) _ $19,162 WP 51. Survey (Total Water Survey Fees) _ $1,040 $192,660 2.Total Sewer Fee(less Survey Fees)Breakdown by Conceptual,Preliminary and Final Design WP 31. Conceptual(30%) (Total Sewer Fee-Survey Fees)x(0.3) _ $117,894 WP 32. Preliminary(60%) (Total Sewer Fee-Survey Fees)x(0.6) _ $235,788 WP 33. Final(10%) (Total Sewer Fee-Survey Fees)x(0.1) _ $39,298 WP 51. Survey (Total Sewer Survey Fees) _ $4,160 $397,140 EXHIBIT "B-2a" Water/Sanitary Sewer Breakdown by FWCC/Non-FWCC-Phase 5 FWCC Water/Sanitary Sewer Breakdown A. SUMMARY OF TOTAL FEE Service Description Water Sewer Total Engineering Services $158,196 $319,284 $477,480 Survey Fee $832 $3,328 $4,160 Total Fee $159,028 $322,612 $481,640 B. BREAKDOWN OF WATER AND SEWER FEES (Less Survey Fees) 1.Total Water Fee(less Survey Fees)Breakdown by Conceptual,Preliminary and Final Design WP 31. Conceptual(30%) (Total Water Fee-Survey Fees)x(0.3) _ $47,459 WP 32. Preliminary(60%) (Total Water Fee-Survey Fees)x(0.6) _ $94,918 WP 33. Final(10%) (Total Water Fee-Survey Fees)x(0.1) _ $15,820 WP 51. Survey (Total Water Survey Fees) _ $832 $159,028 2.Total Sewer Fee(less Survey Fees)Breakdown by Conceptual,Preliminary and Final Design WP 31. Conceptual(30%) (Total Sewer Fee-Survey Fees)x(0.3) _ $95,785 WP 32. Preliminary(60%) (Total Sewer Fee-Survey Fees)x(0.6) _ $191,570 WP 33. Final(10%) (Total Sewer Fee-Survey Fees)x(0.1) _ $31,928 WP 51. Survey (Total Sewer Survey Fees) _ $3,328 $322,612 Non-FWCC Water/Sanitary Sewer Breakdown A. SUMMARY OF TOTAL FEE Service Description Water Sewer Total Engineering Services $33,424 $73,696 $107,120 Survey Fee $208 $832 $1,040 Total Fee $33,632 $74,528 $108,160 B. BREAKDOWN OF WATER AND SEWER FEES (Less Survey Fees) 1.Total Water Fee(less Survey Fees)Breakdown by Conceptual,Preliminary and Final Design WP 31. Conceptual(30%) (Total Water Fee-Survey Fees)x(0.3) _ $10,027 WP 32. Preliminary(60%) (Total Water Fee-Survey Fees)x(0.6) _ $20,054 WP 33. Final(10%) (Total Water Fee-Survey Fees)x(0.1) _ $3,342 WP 51. Survey (Total Water Survey Fees) _ $208 $33,632 2.Total Sewer Fee(less Survey Fees)Breakdown by Conceptual,Preliminary and Final Design WP 31. Conceptual(30%) (Total Sewer Fee-Survey Fees)x(0.3) _ $22,109 WP 32. Preliminary(60%) (Total Sewer Fee-Survey Fees)x(0.6) _ $44,218 WP 33. Final(10%) (Total Sewer Fee-Survey Fees)x(0.1) _ $7,370 WP 51. Survey (Total Sewer Survey Fees) _ $832 $74,528 EXHIBIT "B-3" MWBE Participation Percentages—Phase 5 Consulting Firm Prime Responsibility Fee Amount Percent Prime Consultant Kimley-Horn and Associates,Inc. Engineering $353,500.00 59.94% MWBE Subconsultant Gorrondona&Associates,Inc. Survey Services $3,000.00 0.51% P I C Printing,LLC Reproduction Services $1,300.00 0.22% Lamb-Star Engineering,LP RPR Services $200,000.00 33.91% Non-MWBE Subconsultant Raymond L.Goodson Jr.,Inc. Civil Engineering $21,000.00 3.56% Bennett Trenchless Engineers Trenchless Engineering, $11,000.00 1.87% Total Fee Amount: $589,800.00 100.00% Project Description Scope of Service Total Fee MWBE Fee Percent Engineering Services Total Water,Sewer $589,800.00 $204,300.00 34.6% City's MWBE Goal 25% ATTACHMENT "C" Amendments to Standard Agreement No modifications to the Standard Agreement were necessary for this project. ATTACHMENT 4'D99 Schedule The ENGINEER wi11 complete Tasks 1-15, as defined in the Scope of Services,by June 30, 2019. I 0 FZ j _• - ,.L b _ W ll.t LU IIN LU uj N G ~a � - i P �i1111� W #, .•a: - ate':. LCIW 0_ LU Lm3 LU LU ILI Nn t Z �'t'�`� � �Tr��'•� N a 1 .'� N x� (/`�) Y � I•�;�. fir' �:�.,�-' s t�y t r�i}'-k;'*� f` � iy;��. ' {L.i;��a�.,ti V 1 }_ '��g� � _ �1L, � Yrs ~ •�•l ;�7< �� �A -_r o i �'+� � .\''�t 4l�•��y'�3v°'�x R�'� ..- why •% ..a..•>�' �_i,��i, r'.' ZCD _ }' •.T� M+ r .IFr � _ � f ~. - ` *+. ,.1-,� r 4 R �'�l-;+.'-xl'�T u-r}�tr4: LLI LU AM LU ry `\R+ �§,rT+ �'�-A,. � -� \. , c� f 't�—r-� r41 Sif+. `, ,�.'•, 9'4 i 7 W S ^' ' ' �R1r. ?p �` 1� .�ix:-, Fi� � �� Z � �'# C JF-• �'_y N s�,i-�....:t5, .rte.._ s. �- 9:1J ��-. a Nom - W fl if LLI I7 LU ww" sa QZ W - � W �{`.�{� t 1-•'.r N - :� i sy ` Z i - f..) r J ... Z -'' !p •'� Q U - Ott -` Z i�i,'I 11 f +rr �¢ E'�4#. .•,. ��'�`•SG'•e�t a /'�,�„�'�r .W,t�'� ,.��. '� C.7 �, �. -r� _` - :� jt = �� I-��' � � .�, - s."' AMC, ,\� 'rd.�,t� ts''i►' :G '-7 \. - i �-i"1 � U ,�.'.fl-.-csa.,. _ O C 0 0 0 0 0 0 0 0 0 0 O C; 0 0 0 0 0 0 0 0 0 0 tD t0 N N 0 0 0 0 6 Ul pl m 0 0 O C) N N H 4 4 N N EA-M O C 0 0 O C O 0 0 0 0 0 0 0 0 O C O O O O 0 0 0 0 0 0 O M M N 0 N 0 0 0 o c a v r: r-� vi vi m m o 0 N n N c-I t?V/ VF th N Vl N.i'} N✓T W to C O O 00 10 C O U E v uSi T O OO N N h M h VT N Ul N v1 N N O O O O - O O O O N a `y m .a ri ti o'O d L WFt Ft C 0➢ C C C d 0 0 0 0 0 0 0 0 0 0 0 0 O O O O U O c0 d �'�OD CO 0.O l0 40 1p M M 4 4 00 W W O CD RI � vOi C CL to M N N E W Y C ry •..Vl M W v?Vf VT If,to N tR V!V� VT to to VT c a o 0 0 0 0 0 0 0 0 0 0 o N W O z 0? k7 0 m N W 3 ,-i ui vi 10� v� uo � U O M M e•i t-i M m O o N N a o 0 � � m o 0 m nc u O O N G Z O o � C K yCj � t?til V�VT VF t? V!to N to N+/T C O O O O OB 9 - o 0 oen •Y. a ti l U 7 a` o u CML n d d 0 C o y N v C M1) T � U d 3 N s Qvii = an to M..✓t aR vi y to M+n an to Y to d i m 4J tU LJ. lC a+ O 41 L C C c E E E 3 y C w d1 00 d d O d d d d U d E Ln m m c c c c N n Z 10 N tU t0 N _9 U e0 iJ U 110 � C e-1 C) •d � � ,a U �' m i J to Q � �" F 1- F- �"• F- F- O-o o O 00 00 to o a 018 0 o c v .-1 .-i o'o O O N N C N N N N 0 O O O O O O 0 a v to O o O O N N c0 W N ti 0 0 • o o ai m vi vi a"� ai of N N O O O O J C 00 M O O a C C V N N O NC •> d N .-1 C K O U c � UY N 4Y VT to N N to N v} U1 VT O O O O N m 00 O O [ 00 00 O C NW y W cp W c u c u of c c c c Co m f W F W VF V? M VT V}V> M V?1?VT 1?N O O O O O O O O O 00 o c v o0 mao 0000 as 00 vO m O N y 00 W N N C � N N R V tD R Irj _ — cc m ri c-i 00 c-i '•i ni ni m j, O u N N N O 10 w N c a E a x Y C 00 0 0 0 0 0 0 0 0 W ai W W O E W - O O N N 10 m m tO '31 N m N O O W Z 3 W N N m mw 'o O A N N N N Vf Vf m c/1 am coo m E N N N N J N O O U C A W N E 9 m a r_ ` 44 V? M v} V}V? M v}V!V?16 V? C O O O O C p N c0 000 N N U `a ul 1 m O O d O O cWW WN N IA c A 3 N O O � Q h 1A VT 1A VT M V? N v} H VT Vl VT d I L m 1 LL ' 1 U ' U 3 _ L }r mOEc OE0 d y U m E '�^ v01i m 2 L m m cc c r y m m v d m st t a v p m In g 00 u u d u . —> y c M m e E o o E O a v` a d v 9 rto U m A m O c a 9 > O m d o_ ^ d .N1 a s Y Y Y Y Y Y F ~ H F F H n o 0C- 0 0 0 0 O O N C V a O O 0 0 O O vl ui N C N ti O O VY VT Vf VT VT 4 N V} N VT to N 0 0 0 C• O O O O 0o w a �t O o 0 0 H U> lA Vf 1A 4) 4/'VT N Vf W Ut O O O CJ pp O O O CJ O O > d tc O C N Uf K VT VY 47 N VT N VT N(A O O O 0 C N ON O O d d WN N W c m c G m QI c QI 00 w O O O O O O O O O O O O o G W N N N r, 'D O O t0 O W CD a E a w Y C Vl V1 t?N ih V) N N LF U? N VT V)VT VT Vf m O O O O O C W d0 CO O r �0 CQ O O W O y O m O O m ) cn v C Q O Y � H an vi yr an u) of� h N Vf w Z Q � F v F F O o 0 o Q O 0 0 �o ai N N �O lO O F O O F O O N W O O OG _ C Z r r b a N E a � c � O O O c, OC Co o w Ul S N N C u W Uu a` d m > O V a H a d z vs vT H vT w vT vt vT an uT of yr 3 c c > � c �o > s V' Q yOj 1?VT N VT i?uT N VT N VT t?N L _ m Q� Q� LL U U LL C O Z U Q a: Q c c 41 C c E E E 3 W O E w v U m E n n a> c Ln m avq c c c � a O N N C — N G m V u Q Z Oma' Y Y Y Y Y Y H r r r r r r City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 2/12/2019 DATE: Tuesday, February 12, 2019 REFERENCE NO.: **C-29040 LOG NAME: 60WSTRAVA5-KHA SUBJECT: Authorize Execution of Amendment No. 5 to City Secretary Contract No. 37013 with Kimley-Horn and Associates, Inc., in the Amount of$589,800.00 for Water and Sanitary Sewer Main Relocations for the Trinity River Vision -Central City Project and the Trinity Uptown Service Area Phase 5 (TRV- Related Expenses Eligible for Reimbursement from the TRWD) (COUNCIL DISTRICTS 2 and 9) RECOMMENDATION: It is recommended that the City Council authorize the execution of Amendment No. 5 to City Secretary Contract No. 37013 with Kimley-Horn and Associates, Inc. in the amount of$589,800.00 for Trinity River Vision -Central City Project and the Trinity Uptown Service Area Phase 5. DISCUSSION: On April 15, 2008, (M&C C-22765)the City Council authorized an Engineering Agreement in the amount of$2,533,113.00 for water and sanitary sewer main relocations for the Trinity River Vision -Central City Project and the Trinity Uptown Service Area Phase 1. The Engineering Agreement was subsequently revised by Amendment No. 1 (M&C C-25303, November 15, 2011) in the amount of$1,580,000.00 to provide for Phase 2A, Amendment No. 2 (M&C C-26276, May 21, 2013) in the amount of$1,896,000.00 to provide for Phase 2B, Amendment No. 3 (M&C C- 26838, June 10, 2014) in the amount of$1,736,800.00 to provide for Phase 3 and Amendment No. 4 (M&C C-27628, February 16, 2016) in the amount of$1,596,900.00 to provide for Phase 4. This Amendment No. 5 allows Kimley-Horn and Associates, Inc., to commence with the necessary design work for Phase 5. The proposed scope of services for Trinity River Vision -Central City Project and the Trinity Uptown Service Area Phase 5 includes the following: . Design for the relocation of conflicting water and sanitary sewer mains to accommodate the USACE Channel Segment A project; . Construction phase services; . Right-of-Way and Easement Services; . Coordination meetings with TRV Management Team, TRV partners and Staff; . Design program management; Kimley-Horn and Associates, Inc., proposes to provide the necessary additional services for a lump sum fee of$589,800.00. Staff considers the fee to be fair and reasonable for the scope of services proposed. Upon approval of this amendment, the total of these water, sanitary sewer and major storm drain appropriations for the Trinity River Vision -Central City Project and the Trinity Uptown Service Area will be $41,007,000. Of the $589,800.00 cost of this amendment, the amount of$481,640.00 is necessitated by the Trinity http://apps.cfwnet.org/ecouncil/printinc.asp?id=26668&print=true&DocType=Print 2/13/2019 River Vision (TRV) Project while the remaining amount of$108,160.00 is non-TRV related. Having met its $26.6 million commitment to the TRV Project, the City will be reimbursed the amount of$481,640.00 by the Tarrant Regional Water District(TRWD) upon contract completion, in accordance with the provisions of the executed Interlocal Agreement between the City and the TRWD (City Secretary Contract No. 43425). Staff will record a receivable every month for reimbursable expenses and the TRV Program Manager in the Planning and Development Department will be responsible for collecting the full reimbursement from TRWD upon project completion. Available resources in the 2018 Water and Sewer Revenue Bonds Capital Project Fund will be used to provide interim financing until reimbursement occurs. Once reimbursement is received, the revenue will be receipted to the 2018 Water and Sewer Revenue Capital Project Fund. M/WBE OFFICE: Kimley-Horn and Associates, Inc. agrees to maintain its initial M/WBE commitment of 25%that it made on the original agreement and extend and maintain that same M/WBE commitment of 25%to all prior amendments up to and Inclusive of this Amendment No. 5. Therefore Kimley-Horn and Associates, Inc. remains in compliance with the City's M/WBE Ordinance and attests to its commitment by its signature on the Acceptance of Previous M/WBE Commitment form executed by an authorized representative of its company. This project is located in COUNCIL DISTRICT 2. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are available in the Water and Sewer 2016 Bond Fund for Main Relocations for the Trinity River Vision -Central City and the Trinity Uptown Service Area Project. FUND Existing Additional Project Total* Appropriations A -] ppropriations rp ecially Fund Funded Projects $5 809,128.00 $0.00 $5,809,128.00 39007 rFund ter & Sewer 2016 Bond $6,855,400.00 $0.00 $6,855,400.00 56005 Water & Sewer 2015A Bond $6,167,423.00 $0.00 $6,167, Fund 56007 423.00 Water Capital Fund 59601 $14,404 709.00 1$0.00 1$14 404,709.00 Sewer Capital Fund - Legacy $7 769,673.00 59607 $0.00 1$7,769,673.00 Project Total $41,006,333.00 $0.00 $41,006,333.00 " Numbers rounded for presentation. FUND IDENTIFIERS (FIDs): TO �F"�undDelpartment ccoun Project JProgram ctivity Budget Reference # moun ID ID Year (Chartfield 2) FROM Fund Department 'Accoun Project Program ctivity Budget Reference # moun ID I ID Year (Chartfield 2) CERTIFICATIONS: Submitted for City Manager's Office by: Jay Chapa (5804) Originatina Department Head: Chris Harder (5020) http://apps.cfwnet.org/ecouncil/printmc.asp?id=26668&print=true&DocType=Print 2/13/2019 Additional Information Contact: Liam Conlon (6824) ATTACHMENTS 1. 60WSTRAVA5-KHA 1295 Form 2018-425646 Redacted.pdf (Public) 2. 60WSTRAVA5-KHA Compliance.pd (CFW Internal) 3. 60WSTRAVA5-KHA FID Table (Final).docx (CFW Internal) 4. 60WSTRAVA5-KHA Map.pdf (Public) 5. 60WSTRAVA5-KHA SAM.pdf (CFW Internal) http://apps.cfwnet.org/ecouncil/printmc.asp?id=26668&print=true&DocType=Print 2/13/2019 w N Y L CO G Q L L L X X X N H C 0 CL a C Q a L L L 7 3 CL a a c c c - a a V a m z E m LL L 0 0 0 O O O L L L CL a a U N. L L N a N ami ami W > W > y Y W m W m !Y m M Y M a s a s a u G u Y u u Y °' Y o 1 .. a` .. it z O a D u D u - W Q W Q Q d at xt C yx - CL a d c. - o G CL K 0 - W y LL LL Z6 LL