HomeMy WebLinkAboutContract 49560-A1 AMENDMENT NO. 1 TO AGREEMENT
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES
SOUTHEAST (MLK) DROP-OFF STATION ADDITION
STATE OF TEXAS
CITY SECRETARY CONTRACT NO. J
COUNTY OF TARRANT
WHEREAS, The City of Fort Worth and Elements of Architecture, Inc., (Consultant)
made and entered into City Secretary Contract No. 49560 (The Contract) which was
authorized by the City Council by M&C Reference No.: C-28324, the 15th day of
August, 2017, for Southeast (MLK) Drop-Off Station Addition; and
WHEREAS, further amendment is necessary to reimburse the Consultant as part of the
design services agreement for additional design services for updating the PD re-zoning
submitted site plan. This update request is directed by the City of Fort Worth Planning
& Zoning Department.
NOW THEREFORE, City and Consultant, acting herein by and through their duly
authorized representatives, enter into the following agreement which amends the
Contract:
1.
Article I — Scope of Services, Paragraph (2) shall be added to read as follows:
(2) Provide additional design services for the design and detailing of revisions to the
PD submittal, ZC-16-152. The cost of this additional service is $3,750.00
including $200.00 in reimbursable expenses. The scope of services is described
more fully in Elements of Architecture, Inc. Letter dated January 31, 2019,
subject: "Proposal for MLK Drop-Off Center — Additional Services 02, Site Plan
Changes for Planning.
2.
Article II — Compensation, first paragraph, is amended as follows.-
"Consultant
ollows:"Consultant shall be compensated in accordance with the Fee Schedule shown
in Attachment "A". Payment shall be considered full compensation for all labor,
materials, supplies, and equipment necessary to complete the services
described in Attachment "A". However the total fee paid by the City shall not
exceed a total of $103,516.00 including $3,700.00 in reimbursable expenses
unless the City and the Consultant mutually agree upon a fee amount for
additional services and amend this Agreement accordingly."
3.
All other provisions of this Contract which are not expressly amended herein shall
remain in full force and effect.
O
OFFICIAL RECORD
CITY SECRETARY
CFW Std.Agreement for Prof.Services AMENDMENT(Rev. 16 Aug 2016) FT. WORTH?Tx
Southeast(MLK)Drop-Off Station Addition—PD Revisions—Amendment No. 1 February 201
EXECUTED this the _ "� day of_ 01��'_L- 2019,
in Fort Worth, Tarrant County, Texas.
Elements opArchitecture, Inc. APPROVED:
By: By: T-e��
Debb Fulwiler, AIA J sus J. Chapa
President Assistant City Manager
^ OR?,��
APPWgerVe
DED: RECORDED: , ••O
By: By: o
s, Int im hectorary J. Kay r g t Department City any
�XAs.
APPROVED AS TO FORM AND LEGALITY: M&C Not Required
Contract Authorization
By:
Jon Ef. Stro g
Assistant City Attor ey
CONTRACT COMPLIANCE MANAGER:
By signing I acknowledge that I am the person responsible for the monitoring and administration of this
contract, including ensuring all performance and reporting requirements.
By: w.,. A- 6&n
Brian R. Glass, AIA
Architectural Services Manager
OFFFII/CIAr�L•pRECORD
CFW Std.Agreement for Prof.Services AMENDMENT(Rev. 16 Aug 2016) CI° Pae�� RIFTARY
Southeast(MLK)Drop-Off Station Addition—PD Revisions—Amendment No. 1 FIr."U WI h TX
ATTACHMENT "A"
ELEMENTS 1201 6"Ave, Suite 100
of Architecture, Inc. Fort Worth,Texas 76104
Phone 817.333.2880
Fax 817.333.2883
January 31, 2019
Alfonso Meza
City of Fort Worth
401 West 13th Street
Fort Worth, TX 76102
Re: Proposal for MLK Drop Off Center— Additional Services 02
Site Plan Changes for Planning
Dear Alfonso;
Elements is pleased to provide to you this proposal for services associated with updating the site plan that was
submitted as part of the PD re-zoning case per the proposed civil engineering drawings. The site plan will have
all proposed improvements and the associated labels and callouts and submit the updated site plan.
TOTAL PROPOSED FEE
Labor
We propose to provide our services as identified in this proposal on an hourly basis with the not to exceed
amounts as follows:
Architectural Services $ 800
Civil Engineering ($2,500 x 1.1) 2,750
TOTAL ADDITIONAL SERVICES 02 $ 3,550
Fees listed above are for labor only.
Expenses
Reimbursable expenses as outlined in the Master Contract are estimated at$200.
PROJECT TEAM
The design team remains the same with Carrillo and Elements providing services for this change to the scope. Both
firms are SBE certified.
If this proposal meets with your approval, we would anticipate an amendment to our contract for our services
identified within this proposal. If you have any questions regarding this proposal or need to discuss, please call
me. Thank you.
Sincerely,
Y
Debbie Fulwiler, AIA
President
AMENDMENT NUMBER ONE TO THE AGREEMENT BETWEEN
THE CLIENT AND CARRILLO ENGINEERING, LLC
AMENDMENT NUMBER 2 DATED January 31, 2019 to the agreements between
Elements of Architecture, Inc. ("Client") and Carrillo Engineering, LLC ("Consultant") dated
November 21, 2016 ("the Agreement") concerning the City of Fort Worth Martin Luther King-
Southeast Drop-off Center(the "Project").
The Consultant has entered into the Agreement with the Client for the furnishing of
professional services, and the parties now desire to amend the Agreement.
Therefore, it is mutually agreed that the Agreement is amended to include Additional
Services to be performed by Consultant and provisions for additional compensation by the Client to
the Consultant, all as set forth in Exhibit A hereto. The parties ratify the terms and conditions of
the Agreement not inconsistent with this Amendment, all of which are incorporated by reference.
CLIENT:
ELEMENTS OF ARCHITECTURE, INC. CARRILLO ENGINEERING, LLC
By: By:
Title: Title: Managing Member
Exhibit A to Amendment Number 2 dated
January 31, 2019
Carrillo Engineering, LLC shall perform the following Additional Services:
Task 1 —PD Site Plan Update $2,500 (Lump Sum)
As part of this task and at the request of the City of Fort Worth ("City"), the Consultant will update
the site plan that was submitted as part of the PD re-zoning case per the proposed civil engineering
drawings. The Consultant will add to the site plan all proposed improvements and the associated
labels and callouts. The Consultant will submit the updated site plan to the Client and City.