Loading...
HomeMy WebLinkAboutContract 51988 03/04/2019 10:16 AM COMMUNITY FACILITIES AGREEMENT WITH CITY PARTICIPATION Developer Company Name: Forestar(USA)Real Estate Group,Inc. Address,State,Zip Code: 6751 North Freeway,Fort Worth,TX,76131 Phone&Email: 817-230-0800,bmclarkadrhorton.com Authorized Signatory,Title: Dan Bartok,CEO Project Name: Brookfield Off-Site Sewer Brief Description: Sewer Project Location: Fort Worth Along SH114 between Old John Day Rd.and I-35 Plat Case Number: None Plat Name: None Mapsco: <Mapsco> Council District: ETJ City Project Number: 101478 CFA Number: 2018-038 City of Fort Worth,Texas OFFICIAL RECORD Standard Community Facilities Agreement with City Participation-Brookfield Off-Site Sewer CITY SECRETARY CFA Official Release Date:01.22.2017 Page 1 of 14 FT WORTH,TX COMMUNITY FACILITIES AGREEMENT WITH CITY PARTICIPATI ON THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 51988 WHEREAS, Forestar (USA) Real Eroup, Inc, ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Brookfield Off Site SS("Project") within the City of Fort Worth, Texas("City"); and WHEREAS, the City has reviewed the proposed Improvements and desires to have the Developer oversize the proposed Improvements to provide capacity for future development in the area("Oversized Improvements"); and WHEREAS,the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or"Agreement") in connection with the cultective Improvements for the Project; and WHEREAS,the City has reviewed the Project and desires to participate in the Project in accordance with this Agreement as presented by the Cost Summary Table and Exhibits attached hereto and authorized by City Council via M&C 28922 on November 6,2018;and WHEREAS, The City's cost participation shall be in an amount not to exceed $655,037.44 ("Participation");and WHEREAS,the City has requested the Developer to cause,and the Developer agrees to cause,the design,permitting and construction of the Project for which the City will,subject to City Council approval, reimburse the Developer for the City's portion of those costs after City's final acceptance of the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim.Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation-Brookfield O Ff--Site Sewerk FMIA..RECORD CFA Official Release Date:01.22.2017 - Page 2 of 14 CITY SECRETARY „' F T WORTH,TX and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II,of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) to submit a signed affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub- contractor(s)and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans,specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) C. Sewer (A-1) ® Paving (B) E]. Storm Drain (B-1) :J, Street Lights & Signs(C) F_ E. The Developer shall award all contracts for the construction of community facilities in accordance with Section H,paragraph 7 of the Policy and the contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section 11, of the Policy. Developer shall ensure its contractor(s) pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s),Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent(100%) of City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation-Brookfield Off-Site Sewer CFA Official Release Date:01.22.2017 Page 3 of 14 the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be'fu nished before work is commenced and to meet the requirements of Chapter 2253,Texas Government Code. iii. To require the contractor(s)' it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance(ACORD or other state- approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service limes of sewer and water mains constructed under this Agreement, if any,until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide,at its expense,unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the Improvements under this Agreement. City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation=Brookfield Off-Site Sewer CFA Official Release Date:01.22.2017 Page 4 of 14 H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. 1. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City will be responsible for the costs of utility relocation necessitated by the City's participation in this Agreement. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby,fully indemnify, hold harmless and defend the City,its officers,agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries(including death)or damages sustained by any persons or to any property, resulting from or in connection with the construction, design,performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees. M. The Developer will further require its contractors to indemnify, defend and hold harmless the City,its officers,agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from or in any way connected with the construction of the infrastructure contemplated herein, whether or not such injuries, death or damakes are caused, in whole or in part, by the allezed neilizence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation-Brookfield Off-Site Sewer CFA Official Release Date:01.22.2017 Page 5 of 14 improvements in a good and workmanlike manner,free from defects, in conformance with the Policy,and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows and further apportioned in the Cost Summary Table below i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent(2%)for a total of 4%of the Developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent(4%)and material testing fees equal to two percent(2%)for a total of 6% of the Developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the City is not installing the streetlights, inspection fees equal to four percent (4%) of the Developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs necessary for Developer's portion of the Project. P. COMPLETION WITHIN 2 YEARS i. The City's obligation to participate (exclusive of front foot charges) in this Agreement shall terminate if the Improvements are not completed within two (2) years; provided, however, if construction of the Improvements has started within the two year period,the Developer may request that the CFA be extended for one(1)additional year. If the Improvements are not completed within such extension period, there will be no further obligation of the City to participate. City participation in this CFA shall be subject to the annual availability of City funds as approved by the City Council. City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation-Brookfield Off-Site Sewer CFA Official Release Date:01.22.2017 Page 6 of 14 ii. Subject to paragraph i, above,the City shall reimburse Developer for the City's costs upon presentation of proper documentation of completion of installation of the Oversized Improvements. iii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iv. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement(and any extension period)the Improvements have not been completed and accepted. V. The City may utilize the Developer's financial guarantee to cause the payment of costs for construction of the Improvements before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code, the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1)does not boycott Israel; and(2)will not boycott Israel during the term of the contract. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation-Brookfield Off-Site Sewer CFA Official Release Date:01.22.2017 Page 7 of 14 Cost Summary Sheet Project Name: Brookfield Off-Site SS CFA No.: 2017-038 City Project No.: 101478 Items Developer's Cost City's Cost Total Cost A. Water and Sewer Construction 1. Water Construction $ $ - $ 2.Sewer Construction $ 4,112,408.00 $ 507,780.96 $ 4,620,188.96 Water and Sewer Construction Total $ 4,112,408.00 $ 507,780.96 $ 4,620,188.96 B. TPW Construction 1.Street $ $ - $ 2.Storm Drain $ $ $ 3.Street Lights Installed by Developer $ $ $ 4. Signals $ $ $ TPW Construction Cost Total $ $ $ Total Construction Cost(excluding the fees): $ 4,112,408.00 $ 507,780.96 $ 4,620,188.96 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 82,248.16 $ 10,155.62 $ 92,403.78 D. Water/Sewer Material Testing Fee(2%) $ 82,248.16 $ 10,155.62 $ 92,403.78 Sub-Total for Water Construction Fees $ 164,496.32 $ 20,311.24 $ 184,807.56 E. TPW Inspection Fee(4%) $ - $ - $ - F. TPW Material Testing(2%) $ $ $ G. Street Light Inspsection Cost $ $ $ H. Signals Inspection Cost $ $ $ J.Civil/Geotechnical Engineering&Survey(20%) $ $ TPW Construction Fees Subtotal $ $ $ - Total Construction Fees $ 164,496.32 $ 20,311.24 $ 184,807.56 TOTAL PROJECT COST $ 4,276,904.32 $ 528,092.20 $ 4,804,996.52 Financial Guarantee Options,choose one Amount Choice (Mark one) Bond=100% $ 4,650,000.00 x Completion Agreement=100%/Holds Plat Cash Escrow Water/Sanitary Sewer=125% Cash Escrow Paving/Storm Drain=125% Letter of Credit=125%w/2yr expiration period The costs stated herein may be based upon construction estimates rather than actual costs. The City's portion of inspection and material testing fees are directly allocated to the City's accounts for charges and does not reimburse the Water Inspection and Material Testing Fees to the Developer. The City's participation estimate shall be limited to the unit prices contained in City of Fort Worth Ordinance No. 19192-06-2010,as amended,("Unit Price Ordinance")or as determined by public competitive bid. 'The City's cost participation (excluding inspection and material testing fees) is not a lump sum amount and may be less than stated above City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation-Brookfield Off-Site Sewer CFA Official Release Date:01.22.2017 Page 8 of 14 depending upon actual quantities as shown on the Notice of Final Completion package(`Green sheet') and based on unit prices from the construction contract documents. In no event shall the City pay more per unit than as determined pursuant to the Unit Price Ordinance or public competitive bid. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation-Brookfield Off-Site Sewer CFA Official Release Date:01.22.2017 Page 9of14 IN TESTIMONY WHEREOF,the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary,with the corporate seal of the City affixed, and said Developer has executed this instrument in quadruplicate, effective as of the date subscribed by the City's designated City Manager. CITY OF FORT WORTH DEVELOPER Forestar(USA)Real Estate Group,Inc. Jesus J.Chapa(Feb 27,20191 gA hrk Jesus J. Chapa Daniel Bartok(Feb 26,2019) Assistant City Manager Name: Dan Bartok Feb 27,2019 Title: CEO Date: Feb 26,2019 Date: Recommended by: ATTEST: (Only if required by Developer) EvelynRob ,20191 Evelyn Roberts Contract Compliance Specialist Signature Planning and Development Name: Approved as to Form &Legality: Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and Richard A.McCracken(Feb 27,2019) Richard A.McCracken administration of this contract, including ensuring all performance and reporting Assistant City Attorney requirements. M&C No. C-28922 Date: 1116118 7-anie scarl&lf le Moras Form 1295: Janie Scarlett Morales(Fob 27,2019) Janie Morales ATTEST.• a !f�A� :. Development Manager Mary J. ayser(Mar4, 019) Mary J. Kayser City Secretary LOFFICIAL RECORD City of Fort Worth,Texas CRETA RY Standard Community Facilities Agreement with City Participation-Brookfield Off-Site SewerRTH.TX CFA Official Release Date:01.22.2017 Page 10 of 14 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Attachment 1 -Changes to Standard Community Facilities Agreement with City Participation ® Attachment 2—Phased CFA Provision ® Location Map F1 Exhibit A:Water Improvements 0 Water Cost Estimate ® Exhibit A-1: Sewer Improvements Sewer Cost Estimate .J Exhibit B: Paving Improvements Li Paving Cost Estimate L_ Exhibit B-1: Storm Drain Improvements G Storm Drain Cost Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation-Brookfield Off-Site Sewer CFA Official Release Date:01.22.2017 Page 11 of 14 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement CityProject No. 101478 None City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation-Brookfield Off-Site Sewer CFA Official Release Date:01.22.2017 Page 12 of 14 ATTACHMENT"2" Phased CFA Provision If the improvements contained in this Agreement will connect to improvements Developer is constructing under a separate Community Facilities Agreement and the improvements in the separate Community Facilities Agreement have not been completed and accepted by the City, this Agreement shall be considered a "Phased CFA"and the provisions contained in this section shall apply. The improvements being constructed by Developer under the separate Community Facilities Agreement shall be defined as the "Parent Project." The improvements being constructed by Developer under this Agreement shall be defined as the"Child Project." Developer acknowledges and agrees that due to Developer's election to construct a Phased CFA, the potential exists for technical, delivery, acceptance or performance problems (hereinafter"Construction Problems"). Construction Problems may include,but are not limited to: failure of the improvements to comply with the approved plans or City Specifications; failure of the improvements in the Parent Project and the Child Project to properly connect to each other; changes to the design or construction of the improvements in the Parent Project that impact the design and construction of the improvements in the Child Project; construction delays, delay claims, or claims for liquidated damages; increased costs for the Developer; failure of the improvements to pass inspection or material testing; or rejection by the City of some or all of the improvements and Developer having to remove and reconstruct the improvements at Developer's expense. In addition, Developer understands and agrees that disputes may arise between Developer's contractors or their subcontractors relating to responsibility for the Construction Problems. Developer shall be solely responsible for resolving disputes between contractors or disputes between contractors and subcontractors. Developer further acknowledges and agrees that Developer has notified all of Developer's contractors for the Project that Developer has elected to construct a Phased CFA, the provisions of this section, the risks associated with a Phased CFA, and that the City shall not bear any responsibility for Developer's decision to proceed with a Phased CFA. Developer shall not make the final connection of the improvements in the Child Project to the improvements in the Parent Project until the improvements in the Parent Project have been constructed and accepted by the City and the City has consented to Developer making the connection. Developer agrees that if this Agreement is for improvements relating to the construction, renovation or modification of one or more single family residential homes or structures, the City will not record the plat related to the Project until the improvements are constructed and accepted by the City. Developer agrees that if this Agreement is for improvements relating to the construction, renovation or modification of one or more commercial buildings or structures,the Developer shall not receive a Certificate of Occupancy from the City for the building(s)related to the Project until the improvements in this Agreement are constructed and accepted by the City. Developer further understands and agrees that completion of the improvements under this Agreement does not entitle Developer to obtain a City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation-Brookfield Off-Site Sewer CFA Official Release Date:01.22.2017 Page 13 of 14 final plat of the property until all other requirements of Federal law, State law,or the City Code relating to the filing and recording of a final plat have been met by Developer. BY CHOOSING TO CONSTRUCT A PHASED CFA,DEVELOPER ASSUMES ALL RISKS AND DEVELOPER SHALL BE LIABLE AND RESPONSIBLE FOR ANY AND ALL DAMAGES, INCLUDING BUT NOT LIMITED TO ANY AND ALL ECONOMIC DAMAGES PROPERTY LOSS, PROPERTY DAMAGES AND PERSONAL INJURY, (INCLUDING DEATH), OF ANY KIND OR CHARACTER, WHETHER REAL OR ASSERTED. DEVELOPER HEREBY EXPRESSLY RELEASES AND DISCHARGES CITY FROM ANY AND ALL LIABILITY FOR DAMAGES, INCLUDING, BUT NOT LIMITED TO ANY AND ALL ECONOMIC DAMAGES, PROPERTY LOSS, PROPERTY DAMAGE AND PERSONAL INJURY (INCL UDINGDEATH)ARISING OUT OFOR IN CONNECTION WITH,DIRECTLY OR INDIRECTLY, THE CONSTRUCTION OF THE IMPROVEMENTS OR DEVELOPER'S DECISION TO CONSTRUCT A PHASED CFA. DEVELOPER, AT ITS SOLE COST AND EXPENSE,AGREES TO AND DOES HEREBY INDEMNIFY, DEFEND PROTECT, AND HOLD HARMLESS CITY, AND CITY'S OFFICERS, REPRESENTATIVES,AGENTS,EMPLOYEES,AND SERVANTS FOR,FROMAND AGAINST ANY AND ALL CLAIMS (WHETHER AT LAW OR IN EQUITY), LIABILITIES, DAMAGES(INCLUDING ANY AND ALL ECONOMIC DAMAGES, PROPERTY LOSS, PROPERTY DAMAGES AND PERSONAL INJURIES INCLUDING DEATH), LOSSES, LIENS, CAUSES OF ACTION, SUITS, JUDGMENTS AND EXPENSES (INCLUDING, BUT NOT LIMITED TO, COURT COSTS, ATTORNEYS' FEES AND COSTS OF INVESTIGATION), OF ANY NATURE, KIND OR DESCRIPTIONARNING OR ALLEGED TO ARISE BY OR IN ANY WAY RELATED TO CONSTRUCTION OF THE IMPROVEMENTS OR DEVELOPER'S CHOICE TO CONSTRUCT A PHASED CFA, OR (2)BY REASON OF ANY OTHER CLAIM WHATSOEVER OF ANY PERSON OR PARTY OCCASIONED OR ALLEGED TO BE OCCASIONED IN WHOLE OR INPART BY THE CONSTRUCTIONS OF THE IMPROVEMENTS OR DEVELOPER'S CHOICE TO CONSTRUCT A PHASED CFA WHETHER OR NOT SUCH INJURIES,DEATH OR DAMAGES ARE CAUSED. IN WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH,ITS OFFICERS, SER VANTS, OR EMPLOYEES. City of Fort Worth,Texas Standard Community Facilities Agreement with City Participation-Brookfield Off-Site Sewer CFA Official Release Date:01.22.2017 Page 14 of 14 W 42 43 DAP-BID PROPOSAL Pw t ot2 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Infirmarian Bidders Proposal Bidlist Item ripdon Specification Unit of Bid No. �� Section No. I Measum Quantity Unit Price Bid Value UNIT SANITARY SEI VER IMPROVE] E 1 3137.0104 Medium Stone Riprap,dry 313700 SY 3332 $67.00 $223,244.0_0 2 3292.0200 Seeding,Broadcast- 32 92 13 SY 88436 _ $1.00 $88,436.00 3 3301.0002 Post-CCN Inspection 330131 LF 20975 $1.00 $20,975.0_0 3301.0101 4 Manhole Vacuum Testing - 33 01 30 EA - 51 $138.00 - _- __-- _ -` $7038.00 5 3304.0002 Cathodic Protection _ 33 0412 LS 1 $29 -- - 888.00 $29,868.00 - --- 6 3305.0109 Trench Safety 33 0516 LF _20124 $1.00 $20,124.00 7 3305.0113 Trench Water Stops '33 0515_ EA - 47 $1,760.00 $82,720.00 8 3305.0112 Concrete Collar __ 330517 _EA 23 131,260.00 $28,980.00 9 3305.0116 Concrete Encasement for Utility Pipes 330510 Cy 296 $338.00 $100,048.00 10 3305.0202 Imported EmhedmentlBackfill,CSS 33 0510 CY 4 $13,199.00 $52,796.00 11 3305.1006 36'Cali ng BY Open but 330522 LF 121 $305.00 $36,905.00 12 3305.1106 36'Casing By Other Than Open Cut 33 05 22 LF 240 $678.00 $16,720.00 13 3305.1108 48'Casing By Other Than Open Cut _ 330522 LF-_--529-,$961.00 $508,369.00 14 3305.3007 18'Sewer Carrier Pipe 33 05 24 LF 1046 $146.00 $152,716.00 15 3305.3009 21'Sewer Carrier Pipe - 33 OS 24 _LF 719 $190.00_$136 10.00 16 3305.3012 30"Sewer Carrier Pipe 330524 LF i 1297 $227.00 $294,419_00 17_ 3x31.4115 8'Sewer Pipe 3311 10 LF 61 $64.00 $3,904.00 18 3331.4208 12'Sewer Pipe ---i - 33 11 10 LF 908 $55.00 $49,940_00 19 3331.4209 12'Sewer Pipe,CSS Backfill 331110 LF 20 $78.00 $1,5W.00 20 3331.4225 18"Sewer Pipe 331110 LF 4481 _$69.00 $309189.00 21 3331.4228 18"Sewer Pipe,CSS Backfill 331110 LF140 _ $121.00 $16,940.00 22 3331.4308 21'Sewer Pipe 331110 LF - 1136 $78._00 $88,608.00 23 3331.4309 21'Sewer Pipe,_CSS Backfill 33 11 10 LF 20 $137.00 g,740.00 24 3339.0001 Epoxy Manhole Liner _ 33 39 60 VF _727 $249.00_$181,023.00 - 25 3339.1001 4'Manhole ---- . 33 3910,20 EA -- 4`$3,309.00-$13,236.00 26 3339.1003 4'Extra Depth Manhole 33 3910,20 VF_ 38 $233.00 $8,854.00 27-3339.1101 5'Manhole 43_--- 33 3910,20 EA - -___-- . � - - 58,057.00 $260,451.00 _ 28 3339.1102 5'Drop Manhole -3373910,20 EA 4 $11 813.00 $47,252.00 29 3339.1103 5'Extra Depth Manhole 33 3810,20 VF 57 �4 $345.00 $198,030.00 30 9999.0001 Air Bridge EA 11 $3 525.00 775.00 TOTAL UNIT 11:SANITARY SEWER IMPROVEMENTS $3,166,470.00 Boo Bid Stwmis ry UNIT 11:SANITARY SEWER IMPROVEMENT$ $3188 470.00 Taal Base Caasduetim Will 1 470.00 TOTAL UNIT II:TOTAL CONSTRUCTION BID ALT-A 31-A 3331.4317 24"Sewer Pipe 331110 LF 536 $97.00 $51.992.00 32-A 3331.4330 27"Sewer Pipe 331110 LF 2010 $114.00 $229,140.00 33-A 3331.4331 27'Sewer Pipe,CSS Backfi8 331110 LF 20 $188.00 $3,760.00 34-A 3331.4401 30"Sewer Pi 33 11 10 LF 8867 $130.00 $1,152,710.00 35-A 3331.4402 30"Sewer Pipe,CSS Backfill 331110 LF 79 $204.00 $161116.00 Total Baa Bid 53,166,470.00 Total Alt-A $1,453,718.00 Total $4,620,188.00 Bm*KwWOfffwSeeaary3e aWnBsra,don CTIY OF FORT WORTH City PM)KI Na 101478 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS 00 42 43-SW%WonL oAP_R&v_I2-12•tesk Fwm venire F*nwy 14 2018 00 42 43 DAP-Ben PROPOSAL heel ort SECTION 00 42 43 Mveloper Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Mist Item Specification Unit of Bid No. mon Section NO. Measure Quantity Unit Price Bid Value TOTAL UNIT II•ALTERNATIVE CONST. BID ALT-B 4 24'Fiberglass Sewer Pipe 33 31 13 LF 536 $11 32-B 3331.4333 27" 3331 13 134.00 $269,340.00 33-B 3331.4331 27'Sewer Pipe,CSS Bac 11 LF 20 $209.00 $4180.00 34-B 3331.4408 30"Fibs33 31 13 149.00 $1,321,183-00 Sewer Pipe,CSS Backup 33 11 10 LF 79 $223.00 Total Bax Bid 166,470 Total Alt-B $1 .00 Total ,842 74 1%Is Bid is submitted by the entity named below: BIDDER: BY:Kyle M Wright Construct: 601 W.Will Street Grapevine,TX,76051 MIS:qPr.TdenT DATE:12/12I20)8 Contractor agree to complete WORK for FINAL ACCEPTANCE within 20 calendar dkya after the date when the CONTRACT commence to ren as provided is the General Conditions. END OF SECTION Broot M Othbo emu y UM Mtln&=RIM CrrY OF PORT WORTH Qty Rglm Na 101478 STANDARD CONSTRtC17OH SPECO CAMON DOCUMENTS-DEVELOPER AWARDED PROJECTS 0042 43516 Pmpon0AP_Rav_12-12-I8.da POM Vantin Fat+revy 16.2018 er6 � ti 1 r CR-47M a{ P ROJWT I��'M ITS �/ T� 1 � Fort 1 o th �tvorth f 1 I F1/jnft„J' _ Mot Mow us o rw 4 247 8 LA � ��� of y011.�e �F a,:ec r►d�+� c� Eagle Mcwioin a G'Idrn To%4' w +jos , • s lot o EVICINITY MAP � NOT-TO-SCALE o CITY PROJECT NO. 101478 SEWER PROJECT NO.56008-0700430-101478-00148 p L6! N N. 81112 VICINITY MAP EXHIBIT PAPF.-QAWSON DATE ,uN 20�_ ENGINEERS DES's JG BROOKFIELD OFFSITE 7 CHEOCED-%LDRAVM FORT WORTH I SAN ANTONIO I AUSTIN I HOUSTON 1 DALLAS V) 1 OF 1 500 WEST SEVENTH ST.STE 950 1 FT.WORTH,TY 75102 1 817.970.9868 w SHEET FORT WORTH, TEXAS TEXAS BOARD OF PROFESSIONAL ENGINEERS,FIRM REGISTRATION 4170 0 THIS DOCUMENT HAS BEEN PRODUCED FROM MATERIAL THAT WAS STORED AND/OR TRANSMITTED ELECTRONICALLY AND MAY HAVE BEEN INADVERTENTLY ALTERED. RELY ONLY ON FINAL HARDCOPY MATERIALS BEARING THE CONSULTANT'S ORIGINAL SIGNATURE AND SEAL EN EXISTING PROJEC I SHALE PROP 1 CREEK SAN.SEW ROOKFIELD �v HillPROP. Foam SAN.SEW. ' c/) 3 m w m N PROFOSED LL- LL- ELIZA SETH I ---I I CRI:EK O IV 04 O I 0 (O I Q L) U Q 'L) U rn x x W LEGEND % PROPOSED SANITARY S::WER LINE SS- WITH FLOW ARROW Ei *NOTE: CANNOT MAKE CONNECTIONS o SCALE: 1"= 1000' TO MAINS INSTALLED UNDER CPN # N O 100611 UNTIL THEY HAVE BEEN i 0 1 000 2000 ACCEPTED AND GREENSHEETS HAVE E 00 BEEN ISSUED. a/ O N O _ o N JOB N0. 61112 OFFSITE SEWER EXTENSION PAPE-DAWSON DATE JUN 2018 ENGINEERS N a DESIGNER JG BROOKFIELD OFFSITE rd 75 CHECKED DM DRAWN JPM FORT WORTH I SAN ANTONIO I AUSTIN I HOUSTON I DALLAS N 500 WEST SEVENTH ST,STE 350 1 FT.WORTH,TX 761021 817.870.3668 O7 SHEET 1 OF 4 FORT WORTH, TEXAS TEXAS BOARD OF PROFESSIONAL ENGINEERS,FIRM REGISTRATION 4470 � LL THIS DOCUMENT HAS BEEN PRODUCED FROM MATERIAL THAT WAS STORED AND/OR TRANSMITTED ELECTRONICALLY AND MAY HAVE BEEN INADVERTENTLY ALTERED. RELY ONLY ON FlNAL HARDCOPY MATERIALS BEARING THE CONSULTANTS ORIGINAL SIGNATURE AND SEAL T ITT— VJ I LLI L I VJ PR P. PROP. SA .SEW. SAMSEW. Co � I = Lli 3 v I W l� l� O I 0 0 N I Q L� U Q L) U / rn y-+ L X LJ LEGEND i PROPOSED SANITARY SEWER LINE SS- :> WITH FLOW ARROW (D U c E% *NOTE: CANNOT MAKE CONNECTIONS o SCALE: 1 "= 1000' TO MAINS INSTALLED UNDER CPN # N O 100611 UNTIL THEY HAVE BEEN j 1 000 2000 ACCEPTED AND GREENSHEETS HAVE E o0 BEEN ISSUED. CL/ O N O _ M/ N y JOB NO. 61112 OFFSITE SEWER EXTENSION PAP&DAWSON .o °"'E J'" 2018 N L DESIGNER JG BROOKFIELD OFFSITE FJ ENGINEERS ">> CHECKED DM DRAWN JPM FORT WORTH I SAN ANTONIO I AUSTIN I HOUSTON I DALLAS to 500 WEST SEVENTH ST,STE 350 1 FT.WORTH,TX 76102 1 817.870.3668 0) SHEET 2 O F 4 FORT WORTH, TEXAS TEXAS BOARD OF PROFESSIONAL ENGINEERS,FIRM REGISTRATION#470 � LL THIS DOCUMENT HAS BEEN PRODUCED FROM MATERIAL THAT WAS STORED AND/OR TRANSMITTED ELECTRONICALLY AND MAY HAVE BEEN INADVERTENTLY ALTERED. RELY ONLY ON FINAL HARDCOPY MATERIALS BEARING THE CONSULTANT'S ORIGINAL SIGNATURE AND SEAL o. I o� QP I Lu Lu ' U) PROP. ss SAN.SEW. McK EOLVEY (COLE I INDUSTRIAL w I ' L� I L� O 1 0 0 cV l� U U � ' N x W I t x LEGEND CV PROPOSED SANITARY SE=WER LINE SSS a� iv WITH FLOW ARROW I c +� 04 ' E:/ a *NOTE: CANNOT MAKE: CONNECTIONS o SCALE: 1"= 500' TO MAINS INSTALLED UNDER CPN # 0 100611 UNTIL THEY HAVE BEEN i 0 500 1000 ACCEPTED AND GREENSHEETS HAVE Boo BEEN ISSUED. CL/ p CV M/ N N JOB NO. 61112 DATE JUN 2018 OFFSITE SEWER EXTENSION PAPE-DAWSON ENGINEERS o"q DESIGNER JG BROOKFIELD OFFSITE FMJ / CHECKED DM DRAWN JPM- FORT WORTH I SAN ANTONIO I AUSTIN I HOUSTON I DALLAS 500 WEST SEVENTH ST,STE 350 1 FT.WORTH,TX 76102 1817.870.3668 N SHEET 3 O F 4 FORT WORTH, TEXAS TEXAS BOARD OF PROFESSIONAL ENGINEERS..FIRM REGISTRATION 40470 D LL THIS DOCUMENT HAS BEEN PRODUCED FROM MATERIAL THAT WAS STORED AND/OR TRANSMITTED ELECTRONICALLY AND MAY HAVE BEEN INADVERTENTLY ALTERED. RELY ONLY ON FINAL HARDCOPY MATERIALS BEARING THE CONSULTANTS ORIGINAL SIGNATURE AND SEAL i wl cl) � I PROP. SAN.SEW. 3. PROPOSED McKELVEY COLE W INDUSTRIAL I w H E E u- 0 o BEGIN PROJECT 0 PROP. SAN.SEW. I Q U Q L.� U v! x W d' N LEGEND PROPOSED SANITARY SEWER LINE SS�— c WITH FLOW ARROW cV E *NOTE: CANNOT MAKE CONNECTIONS o SCALE: 1 500' TO MAINS INSTALLED UNDER CPN # co o 100611 UNTIL THEY HAVE BEEN I-- 0 500 1000 ACCEPTED AND GREENSHEETS HAVE E 00 BEEN ISSUED. a/ p cV Ih/ oy JOB NO. 61112 N OFFSITE SEWER EXTENSION PAPE-DAWSON L) DATE JUN 2018 ENGINEERS N.� DESIGNER JG BROOKFIELD OFFSITE rai CHECKED DM DRAWN JPM FORT WORTH I SAN ANTONIO I AUSTIN I HOUSTON I DALLAS N _ 4 OF 4 FORT WORTH TEXAS 500 WEST SEVENTH ST,STI 3601 FT.WORTH,IR 76102 EGGS B17.870.366B SHEET 1 TEXAS BOARD OF PROFESSIONAL ENGINEERS FIRM REGISTRATION 4470 m LL THIS DOCUMENT HAS BEEN PRODUCED FROM MATERIAL THAT WAS STORED AND/OR TRANSMITTED ELECTRONICALLY AND MAY HAVE BEEN INADVERTENTLY ALTERED. RELY ONLY ON FINAL HARDCOPY MATERIALS BEARING THE CONSULTANTS ORIGINAL SIGNATURE AND SEAL