HomeMy WebLinkAboutContract 52011 Received Date: 03/11/2019
Received Time: 9:21 AM
Developer and Project Information Cover Sheet:
Developer Company Name: BH Operations Land,LLC
Address, State,Zip Code: 101 W. Glade Road, Suite 109,Euless,TX, 76039
1
Phone&Email: 81 1-529-7209,thalena.muckleroyfalls.com
Authorized Signatory,Title: Taylor Hale,Manager
Project Name: Oak Court Addition
Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights
Project Location: John T.White Road,Fort Worth TX
Plat Case Number: None Plat Name: None
Mapsco: Council District:
CFA Number: CFA18-0126 City Project Number. 101683
City of Fort Worth,Texas
Standard Community Facilities Agreement-Oak Court Addition
CFA Official Release Date:02.20.2017 OFFICIAL RECORD
Page 1 of 11 CITY SECRETARY
u
F`. WORT4 TX h
STANDARD COMMUNITY FACILITIAS AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. 52011
WHEREAS, BH Operations Land, LLC , ("Developer"), desires to make certain specific
improvements as described below and on the exhibits attached hereto("Improvements")related to
a project generally described as Oak Court Addition ("Project") within the City or the
extraterritorial jurisdiction of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate i» the cost of the Improvements or
Project; and
WHEREAS,any future City participation in this CFA is subject to the availability of City
funds and approval by the Fort Worth City Council and shall be memorialized as an amendment
to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW,THEREFORE,for and in consideration of the covenants and conditions contained
herein,the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated
into this Agreement as if copied herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and obligations hereunder and to
cause all contractors hired by Developer to comply with the Policy in connection with the
work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section 11, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Oak Court Addition OFFICIAL RECORD
CFA Official Release Date:02.20.2017
Page 2 of 11 CITY SECRETARY
FT.WAORTH,TX
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by Developer
for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike manner
and in accordance with all City standards and the City-approved construction plans,
specifications and cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water(A) ® Sewer(A-1) M,Paving(B) K, Storm Drain(B-1) ®, Street Lights & Signs
(C) 0.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered
in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its
contractor(s)pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified,insured,licensed and
bonded to do work in public ways and/or prequalified to perform water/wastewater
construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure,and a maintenance bond in the name of the City
for one hundred percent (100%) of the contract price of the infrastructure for a
period of two (2) years from the date of final acceptance insuring the maintenance
and repair of the constructed infrastructure during the term of the maintenance
bond. All bonds to be furnished before work is commenced and to meet the
requirements of Chapter 2253, Texas Government Code.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Oak Court Addition
CFA Official Release Date:02.20.2017
Page 3 of 11
iii. To require the contractor(s) it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer-awarded
infrastructure construction contracts. The City shall be named as additional insured
on all insurance required by said documents and same will be evidenced on the
Certificate of Insurance (ACORD or other state-approved form) supplied by the
contractor's insurance provider and bound in the construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Servicers Division so that City inspection
personnel will be available;to require the contractor to allow the construction to be
subject to inspection at any and all times by City inspection forces,to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
1. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community facilities
to be installed hereunder.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Oak Court Addition
CFA Official Release Date:02.20.2017
Page 4 of 11
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans,specifications and cost estimates supplied
by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and casements across
property owned by Developer and required for the construction of the current and future
improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character,whether real or asserted,brought for
or on account of any injuries or damages sustained by any persons (including death)
or to any property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said Developer, its
contractors, subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or damages are
caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from,or in any way connected with, the construction of the infrastructure contemplated
herein,whether or not such injuries, death or damages are caused, in whole or in part,
by the alleged negligence of the City of Fort Worth, its officers, servants, or employees.
Further,Developer will require its contractors to indemnify, and hold harmless the City
for any losses, damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the improvements in a good
and workmanlike manner, free from defects, in conformance with the Policy, and in
accordance with all plans and specifications.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Oak Court Addition
CFA Official Release Date:02.20.2017
Page 5 of 11
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further,Developer agrees that all contracts with any
contractor shall include provisions granting to the City the right to enforce such contracts as
an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent(2%) for a total of 4%of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent(4%) and material testing fees equal to two percent(2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing
the streetlights, inspection fees equal to four percent (4%) of the developer's share
of the streetlight construction cost as stated in the construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period,the developer may request that the CFA be extended for one additional year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two(2)years from the date of this Agreement(and any extension period)
the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial ; aarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
City of Fort Worth,Texas
Standard Community Facilities Agreement-Oak Court Addition
CFA Official Release Date:02.20.2017
Page 6 of 11
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government
Code,the City is prohibited from entering into a contract with a company for goods or services
unless the contract contains a written verification from the company that it: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms
"boycott Israel" and "company" shall have the meanings ascribed to those terms in Section
808.001 of the Texas Government Code. By signing this contract, Developer certifies that
Developer's signature provides written verification to the City that Developer: (1) does not
boycott Israel; and (2)will not boycott Israel during the term of the contract.
IMMIGRATION AND NATIONALITY ACT
R. Developer shall verify the identity and employment eligibility of its employees who perform
work under this Agreement, including completing the Employment Eligibility Verification
Form (I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms
and supporting eligibility documentation for each employee who performs work under this
Agreement. Developer shall adhere to all Federal and State laws as well as establish
appropriate procedures and controls so that no services will be performed by any Developer
employee who is not legally eligible to perform such services. DEVELOPER SHALL
INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES,
LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY
DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR
LICENSEES. City, upon written notice to Developer, shall have the right to immediately
terminate this Agreement for violations of this provision by Developer.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Oak Court Addition
CFA Official Release Date:02.20.2017
Page 7 of 11
Cost Summary Sheet
Project Name: Oak Court Addition
CFA No.: CFA18-0126 City Project No.: 101683
An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 80,220.91
2.Sewer Construction $ 77,84'.18
Water and Sewer Construction Total $ 158,062.09
B. TPW Construction
1.Street $ 230,475.00
2.Storm Drain $ 77,381.61
3.Street Lights Installed by Developer $ 20,565.00
4. Signals $ -
TPW Construction Cost Total $ 328,421.61
Total Construction Cost(excluding the fees): $ 486,483.70
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 3,161.24
D. Water/Sewer Material Testing Fee(2%) $ 3,161.24
Sub-Total for Water Construction Fees $ 6,322.48
E. TPW Inspection Fee(4%) $ 12,314.26
F. TPW Material Testing(2%) $ 6,157.13
G. Street Light Inspsection Cost $ 822.60
H. Signals Inspection Cost $
H. Street Signs Installation Cost $
Sub-Total for TPW Construction Fees $ 19,293 39
Total Construction Fees: $ 25,616•47
Choice
Financial Guarantee Options,choose one Amount Mark one
Bond=100% $ 486,483.70
Completion Agreement=100%/Holds Plat $ 486,483.70 x
Cash Escrow Water/Sanitary Sewer—125% $ 197,577.61
Cash Escrow Paving/Storm Drain=125% $ 410,527.01
Letter of Credit=125%wl2 r expiration period $ 608,104.63
City of Fort Worth,Texas
Standard Community Facilities Agreement-Oak Court Addition
CFA Official Release Date:02.20.2017
Page 8 of 11
ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
BH Operations Land,LLC
Jesus J.Chapa(Mar 8,2019)
Jesus J. Chapa
Assistant City Manager La-
Date: Mar 8,2019 Taylor Hale(MT(Mar 7,2019)
Name: Taylor Hale
Recommended by: Title: Manager
lei 71C Date: Mar 7,2019
Evelyn Rabe (Mar 8,2019)
Evelyn Roberts/Jennifer Ezemack
Project Assistant
Planning and Development Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
Approved as to Form &Legality: administration of this contract, including
ensuring all performance and reporting
Richard A ivlccracKch requirements.
Richard A McCracken(Mar 8,2019)
Richard A. McCracken
Assistant City Attorney Jennifer Ezernack on behalf of Janie Morales(Mar 8,2019)
M&C No. N/A Name: Janie Morales
Date: Title: Development Manager
Form 1295: N/A
ATTEST:
l
Mary J.Kayser(Mar 8,2b19) •• �'P...
Mary J. Kayser/Ronald Gonzales 71FX �
City Secretary/Assistant City Secretary'
City of Fort Worth,Texas
Standard Community Facilities Agreement-Oak Court Addition OFFICIAL RECORD
CFA Official Release Date:02.20.2017
Page 9 of 11 CITY SECRETARY
ET WORTH,TQC
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
® Attachment 1 -Changes to Standard Community Facilities Agreement
® Location Map
Exhibit A: Water Improvements
®. Exhibit A-1: Sewer Improvements
® Water and Sewer Cost Estimates
® Exhibit B: Paving Improvements
Paving Cost Estimate
® Exhibit B-1: Storm Drain Improvements
® Storm Drain Cost Estimate
® Exhibit C: Street Lights and Signs Improvements
® Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Oak Court Addition
CFA Official Release Date:02.20.2017
Page 10 of 11
ATTACHMENT"I"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 101.6 i3
None.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Oak Court Addition
CFA Official Release Date:02.20.2017
Page 11 of 11
00 42 43
D.—'-BID PROPOSAL
^ `7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
No Description Section No. Measure Quantity Unit Price Bid Value
UNIT 1:WATER IMPROVEMENTS
1 3311.0261 8"PVC Water Pipe 3311 12 LF 1340 $25.00 $33,500.00
2 3312.3003 8"Gate Valve 33 12 20 EA 10 $1,100.00 $11,000.00
3 3312.0001 Fire Hydrant 33 12 40 EA 4 $3,500.00 $14,000.00
4 3312.2003 1"Water Service 33 12 10 EA 27 $650.00 $17,550.00
5 3311.0001 Ductile Iron Water Fittings w/Restraint 33 11 11 TON2 $15.00 $30.00
6 3305.0109 Trench Safety 33 05 10 LF
1340 $0.20 $268.00
7 3312.0117 Connection to EAstin 4"-12"Water Main 33 12 25 EA 2 $2,000.00 $4,000.00
8 _
10 _
11 _
12
13
14
15
17
16
18
20
21
22
23
24
25
26
27
28 ---
29 — - -
30
31 _
32 -- - — -
33
34
35
35
38
39
40
37 -- - —�
Al
42 --
43
44
45 _-
TOTAL UNIT I:WATER IMPROVEMENTal $80,220.91
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September t,2015 CFA Pricing Site Utilities Trophy Construction.xls
00 42 43
DAP-BID PROPOSAL
Page 2 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
No. Description Section No. Measure Quantity Unit Price Bid Value
UNIT II:SANITARY SEWER IMPROVEMENTS
1 3331.5301 8"PVC Sewer Pipe,0'to 6'(Misc Only) 33 31 20 LF 1130 $31.00 $35,030.00
9999.0001 Connect to Existing Sewer 8r Install Manhole 33 39 20
2 (see sheet 6) EA 1 $1,100.00 _$1,100.00
3 3339.1001 4'Manhole 33 39 10 EA 7 $2,500.00 $17,500.00
4 3339.1003 4'Extra Depth Manhole 33 39 10 VF 11 $50.00 $550.00
5 3331.3101 4"Sewer Service 3331 50 EA 27 $798.00 $21,546.00
6 3301.0002 Post-CCTV Inspection 33 01 31 LF 1130 $1.25 $1,412.50
7 3301.0101 Manhole Vacuum Testing 33 01 30 EA 8 $75.00 $600.00
8 13305.0109 Trench Safety 33 05 10 LF 1130 $0.20 $226.00
9
10
11
12
13 w
14
15
18
19 _
20
21
22
23
24 _
25
26
27
28 -
29 _
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
TOTAL UNIT 11:SANITARY SEWER IMPROVEMENTS1 $77,841.18
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 CFA Pricing Site Utilities Trophy Constmctionxls
00 42 43
DAP-BIDPROPOSAL
Page 3 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
Description Unit Price Bid Value
No. Section No. Mea,�rre Quantity
UNIT III:DRAINAGE IMPROVEMENTS
1 3341.0201 21"RCP,Class III 3341 10 LF 21 $53.00 $1,113.00
2 3341.0205 24"RCP,Class III 3341 10 LF 285 $62.00 $17,670.00
3 3341.0302 30"RCP,Class III --'33-41
3341 10 LF 300 $72.00 $21,600.00
4 3349.5001 10'Curb Inlet 33 49 20 EA— 4 $5,200.00 $20,800.00
5 3349.0001 4'Storm Junction Box _ 334910
EA 1 $4,600.00 $4,600.00
6 3349.0001 4'Storm Junction Box w/Grate Inlet Top334910 --LF
_ 2 $4,800.00 $9,600.00
7 3305.0109 Trench Safety L.F 606 $0.20 $121.20
9999.0002 Connect to Existing Storm Drain Manhole
8 (see sheet 26-27) EA 1 $2,000.00 $2,000.00
10
11
12
13
14
15
16
18
19
20 _
21
22
r27 23
24
25
25 – —
29
30
31 _
32
33
34
35
36 i _
37
38
39
40
41
42 _
43
44
45 _
TOTAL UNIT 111:DRAINAGE IMPROVEMENTS $77,381.61
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 CFA Pricing Site Utilities Trophy Constructionxls
00 42 43
DAP-BM PROPOSAL
Page 7 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Prorosal
Bidlist Item Specification Unit of Bid
No Description Section No. Measure Quantity Unit Price Bid Value
Bid Summary
UNIT I:WATER IMPROVEMENTS $80,220.91
UNIT II:SANITARY SEWER IMPROVEMENTS $77,841.18
UNIT III:DRAINAGE IMPROVEMENTS $77,381.61
UNIT IV:PAVING IMPROVEMENTS NOT IN THIS SECTION
UNIT V:STREET LIGHTING IMPROVEMENTS NOT IN THIS SECTION
UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS N/A
Total Construction Bid $235,443.70
Contractor agrees to complete WORK for FINAL ACCEPTANCE within 60 calendar days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 CFA Pricing Site Utilities Trophy Constmctionals
00 42 43
DAP-BID PROPOSAL
Page 4 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unitof Bid
Description Unit Price Bid Value
No. Section No. Measure Quantity
UNIT IV:PAVING IMPROVEMENTS
1 3213.0101 6"Conc Pvmt 32 13 13 SY 4300 $46.741 $201,000.00
2 3211.0501 6"Lime Treatment 32 11 29 SY 4530 NOT IN THIS SECTION
3 3211.0400 Hydrated Lime 32 11 29 TN 66 NOT IN THIS SECTION
4 3213.0301 4"Conc Sidewalk 32 13 20 SF 440 $5.00 $2,200.00
5 3213.0501 Barrier Free Ramp,Type R-1 32 13 20 EA 6 $900.00 $5,400.00
6 3213.0501 Barrier Free Ramp,Type M-2 _ _32 13 20 EA 2 $900.00 $1,800.00
3441.4006 Install Alum Sign Ground Mount(see sheet 34 41 30 —
7 19) EA 3 $500.00 $1,500.00
8
9
10
11 __
12 ---�
13 _
14 —�
15 - _ �—
__. . — -
17
18
19
20
21
21
23
24
25 -- -- —
26
27
28
29
30 _ — _--
31
32
33
34
35
36
37
38
39
41
42
43
44
45
TOTAL UNIT IV:PAVING IMP OVEMENT $211,900.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Fmm Version September 1,2015 CFA Pricing HB Concrete.xls
00 42 43
DAP-BID PROPOSAL
Page 7 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
No. Description Section No. Measure Quantity Unit Price Bid Value
Bid Summary
UNIT I:WATER IMPROVEMENTS NOT IN THIS SECTION
UNIT II:SANITARY SEWER IMPROVEMENTS NOT IN THIS SECTION
UNIT III:DRAINAGE IMPROVEMENTS NOT IN THIS SECTION
UNIT IV:PAVING IMPROVEMENTS $211,900.00
UNIT V:STREET LIGHTING IMPROVEMENTS NOT IN THIS SECTION
UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS N/A
Total Construction Bid $211,900.00
Contractor agrees to complete WORK for FINAL ACCEPTANCE within 60 calendar days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Fom Version September 1,2015 CFA Pricing HB Concrete.xls
00 42 43
DAP-BID PROPOSAL
Pose d-17
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
Description Unit Price Bid Value
No. Section No. Measure Quantity
UNIT IV:PAVING IMPROVEMENTS
1 3213.0101 6"Conc Pvmt 32 13 13 S 4300 NOT IN THIS SECTION
2 3211.0501 6"Lime Treatment 32 11 29 SY 4530 $2.49 $8,860.45
3 3211.0400 Hydrated Lime 32 11 29 TN 66 $187.501 $9,714.55
4 3213.0301 4"Conc Sidewalk 32 13 20 SF 440 NOT IN THIS SECTION
5 3213.0501 Barrier Free Ramp,Type R-1 32 13 20 EA 6 NOT IN THIS SECTION
6 3213.0501 Barrier Free Ramp,Type M-2 32 13 20 EA _ 2 NOT IN THIS SECTION
_ 3441.4006 Install Alum Sign Ground Mount(see sheet 3441 30 _
7 EA
19) 3 NOT IN THIS SECTION
8
10
11
12
13
14
15
_�_
16 _
17
18
19
20
21
22
23
24 -
25
26 __
27
28
29
30
31
L3532 _
3
39
40
41
42 _
43
44 _
45
TOTAL UNIT IV:PAVING IMPROVEMENT $18,575.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 CFA Pricing Lime Stabilimtion 4K Companies.xls
00 42 43
DAP-BID PROPOSAL
Page 7 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
10. Description Section No. Measure Quantity Unit Price Bid Value
Bid Summary
UNIT I:WATER IMPROVEMENTS NOT IN THIS SECTION
UNIT II:SANITARY SEWER IMPROVEMENTS NOT IN THIS SECTION
UNIT III:DRAINAGE IMPROVEMENTS NOT IN THIS SECTION
UNIT IV:PAVING IMPROVEMENTS $18,575.00
UNIT V:STREET LIGHTING IMPROVEMENTS NOT IN THIS SECTION
UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS N/A
Total Construction Bid $18,575.00
Contractor agrees to complete WORK for FINAL,ACCEPTANCE within 15 calendar days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 CFA Pricing Lime Stabilization 4K Compwiesals
00 42 43
DAP-BID PROPOSAL
Page 5 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
No. Description Section No- Meas ire Quantity Unit Price Bid Value
UNIT V:STREET LIGHTING IMPROVEMENTS
1 2605.3016 2"Sch 80 PVC(includes Trenching& 26 05 33 LF 365 $12.00 $4,380.00
2 3441.141 NO 10 Insulated Elec Condr 34 41 10 LF 1460 $1.00 $1,460.00
3 3441.3002 Rdwy Ilium Assmbly TY 8,11,D-25,and D-30 34 41 20 EA 5 $1,345.00 $6,725.00
4 3441.3301 Rdwy Ilium Foundation TY 1,2,and 4 34 41 20 EA _ 5 $1,000.00 $5,000.00
5 3441.3201 LED Lighting Fixture 34 41 20 EA 5 $300.00 $1,500.00
6 3441.1646 Furnish/Install Type 33B Arm 34 41 20 EA
5 $300.00 $1,500.00
7
9
10
11
12 -
13
14
16
17
18
19
20
21
22
23
24
25
26
R32 28
29
30
30
33 _ _—
34
35 _
36
37
38
39
40 —
41
42 i
43
44 �_-
45 —
TOTAL UNIT V:STREET LIGHTING IMPROVEMENT, $20,565.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2015 CFA Pricing Site Lighting C&S.xls
00 42 43
DAP-BID PROPOSAL
Page 7 of 7
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
No. Description Section No. Measure Quantity Unit Price Bid Value
Bid Summary
UNIT I:WATER IMPROVEMENTS NOT IN THIS SECTION
UNIT II:SANITARY SEWER IMPROVEMENTS NOT IN THIS SECTION
UNIT III:DRAINAGE IMPROVEMENTS NOT IN THIS SECTION
UNIT IV:PAVING IMPROVEMENTS NOT IN THIS SECTION
UNIT V:STREET LIGHTING IMPROVEMENTS $20,565.00
UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS N/A
Total Construction Bid $20,565.00
Contractor agrees to complete WORK for FINAL ACCEPTANCE within 120 calendar days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Foran Version September 1,2015 CFA Pricing Site Lighting C&S.xls
Q
Z o0
OT-
o
Q LTJ N
O Q U)
L
Q O
w
I—
_m
000 '' w o
o
�
Q o
z U
0 � 0 0 0
0
JQ 00
0 Q
m O
Q m
ry it
oza
o L7
Q - m V �
0
� 0
c
o ^ �
�r o
aC:
E ._
a � o
�.- � a
.C) C
m w 0
Li U
O � o
O
N
d
O O �
O
V \ \
V
W
\ F ` l`JlJ
O
—
LU
�� __ ss_ __ -ss m
— _
E.
LAi
I 9 I I wLLI �.� - X
$ O J I I I I i I 11J
cgs I > a00zt
I ,
r -- - >>>
I :rd600 > O
$a I SJN/UdS JN/tl3dS/N,y I 2 I
ss---
ss
Lu ss 0
(n m `10 I I U O
z a. w --- _ I W I7-�
O of (n
00
Lj- 00
I I _ LL-- W $ I x
� "9�d II �
R > �
3
U I I 1N(!O3XY] N/tlddS/NM V) W ^•�
Imo`s5- =s5--s s o cf)
F
O L ml
V) m
I m x CL LLJ
Q I �
Lli
Q- Q- — I c (� m i i i I IR;
_ I O -a 00 o - �V
x
O Cf) rn a
III i a
I 1 1 I $ LL_
o
N
l o a mea m "� I I m m I I •m� v
3 W W oiE
W I I I I 9
z II I as
Lu �w
z I N
J ?iJ aU' > L�2 ❑
I I o
I3
O z # I
CK o0
w ( I
I
0
I
a as \� I LL)�y(n6 p N
gsr 5 `E W
00
LL) N
ui
5s
Lo
Z I I I 1 , �, ss 3
� � IIIT-
1 11
CD w oo--m -- _ �N�t a I II i W
Z In ��
§ I I
57<
OW 6w'� n iurioo soN/urs I
� I Z
W I�
O
II e
_:II
L — _ 00 _- ,I O
ry
a I xo
s
fia I M
Uo � i i i I 1N/lOD 3.YV]D H3dS/HM g �`
I 171
" 4a I
y § 41 � � N r LL O w
Qy y I r Wa 5 J
I ��\ - 1 IL� U � 4 m rn
g0-
U2
�� I
ao of
n a
L----J L----�I�I --------------
y r.
~ H
II II -p •_ � 4
Ul 3
Q 30
e 0n qs 4: 4d Qs W
W LV I I � ' � � �. i i 9 g �a 9 � 9
� U
o I I I I I 3 ou
w w w� II W—
LLI I I
z
c� wz LdQ C
a
FE
I
O
nca
co
j • O ^ I o 0 0
t= �
<r \ \ I CD
d $6[ �
q 6 �G NquC \ 3 8
Q
a- 00
3 w I 0
—-- w N
LLJ
m Q u
ry
bi
00
J O O
w � I I w
w ---off-- i I�IE U ) <
N I
0 0 � I ,- ,IIs � I � o �
� _ I I G- I
LLJ
jgz
max;, 4 LU z O
Alii - w O O
LLJ
Ld
0 ---- I
O
r-T-0 �I Q
. -,
�
i a : o 00
f I a- r-
C)Y O mR= M --�,r----,-_ - - — _ mCN
o
Q� > I i ( § I O Q m
Ld
Ed
m I _ I 14 Ii
I �- (n 3 E
L c
(�
U g� � i 1N(74:!XYY7 j9Nty3IgtN,1t �� Q Q„ •>\
LLJ
� q: I o -
ln m 0 L I
I �� .�W g� cy- I � LO
U0 gy
Q .
n
O L` �
Jai o LL
tl
I � • li
6 V/ii -----m- _ o
gd I r -- -- - - -- ----- -
CD 3 3 s
w ._
II m �
Ali; A& ikir, I W
w I �M0� 3
W o U
li
I i I I I w N
I 13 H E
II s
O O v
I
O
II
o gar ti I cn
�4sr � �or
Er-
00
J W �
w O
w
' m cy- LLI CN
LL'
F—
X Q u J
Z ss
U N � qI I I I I - --TI ,
00
0 -D
I s I II II III ; o � 1
w z l .--
ILDaf o-m ---I I INI� I II o
n w �' _ III y j ! �. w I
"s I I 5 0 z
I '--�I _ a-
^ I W
4a lenoo x /\ O
iX oyp I S Nlb3dS1HM
W Z O
I _ 1` F—
.50 I -- p
W
0 p C1- _
W O I 9 I Q
——— 6 (nelf
— — - — —
W w W. IoO `� n I
�w I ti-- il' ..IoW ;� ow
No. hi -J Q3
Ow l li L O — `� �`` 0Z �� W
I �_....... Z t. o
1
W J �cy- ,
gh Wm W', Wm �
C7 Z p
- � �
Q O -- — .
I;I
cy-
y
Ox ;ate;_I -- _ C c
UQ x O i I' 1YN09AYT ON/Y3d S/NM b �- — ' w•(�
W m
/ 2
N
N O 6 I , I II I _ 3
Y Xa-
r O w
4 W O
w yOHI I
W W
ct elf -T
jl I _ LI o
Ediy I _
I I I , f----_1 I �� aMlo j
Ili i 3 ._ 13 • M
Cn P a
dK a W
C
ri I I I I -p •�� o
I I a we a �4 ;s I I glig Jim
O C o
11 ❑
I �I
I .
I
00
0
I
I
� g I V)
p 9 J 00/'�W
3 O
_ w (V
W LLJ
U)
I C)
3 0 (�
mss- --ss — . ; 11 00
ILII I U
� I I
irnoo W O
g�Qa I SDN/HdS DN/y3dS/HM
I • SS
A SS s '-1 I M O
g5i I -�__-=_ O
( ~ �
----------- U
LLJ IIO
r- I C6
O
I z
LjLJJ
c�
i I1F-
CZI
� cC
MI n —
Ui 1 OD 9MV1.H/NddSlHM w•�
sS
m
-J6
I
O � 6
--- �— I — _
I �
�_ I p
--------------
e
\ __--_CA_ .. o
L----J L----� --� _ ti
_ _ 5
I �-- -- ---1r-- -- -- — ; C � �
a0 JOE fif I 13 � W3
}i o
I
W
0
J
U)-j
of. � 0
I ,
I
V Lg )
'V^
W$
1 . 1
w O Lj N
_ ------- — w L
Q � I
z
uj
ss
- - _ Q
ss _ o
p ss
_
r----- _: ss --_ _ w
SS_— 3 w Op
O
V)
w I
flg�s I �� I"V II � 1 e 111 I
--_—JI
�—'I --
M _ I /r�
^n �n I I 1bNOJ S 6
Rss 5s I I MO
I ; S SS O M ; W
--- —J 11 ZZ w W r-
. I ;: 3 0 c D —� O
Z Z i T-
LLJ
< F-
--- iw Q ~
_ECI < o N
m O
��� � i wLd
m
' - -
A a I U)
ry LO
mit
O I _ — — — _ �
9�yQa I I M 3 c c
my ( r—�1M .Y
—NOJ 3Y]DN/Nddt/NM
L w
'�a I � z z m �
Li
s
9 I I z O
cS
�
lQo
-lit I i l i L i E
� ' ----- ao
\ --- -Y` --�---m- D (D
II t . d
-------------- o
L----J L_-.__J
-- -- --fir- C
LF
C
I li W o
w
o U
Li
0LJ
H E
I
It
d I �
00
Io
I
COMPLETION AGREEMENT—SELF FUNDED
This Completion Agreement("Agreement"), is made and entered into by and between the
City of Fort Worth, ("City") and BH Operations Land, a Texas Limited Liability Corporation,
authorized to do business in Texas, ("Developer"), effective as of the last date executed by a Party
hereto. The City and the Developer may collectively be called the"Parties".
WITNESSETH:
WHEREAS, the Developer owns that certain tract of real property that contains
approximately 5.823 acres of land located in the City, the legal description of which tract of real
property is marked Exhibit "A"—Legal Description, attached hereto and incorporated herein for
all purposes, ("Property"); and
WHEREAS, the Developer intends to develop the Property as an addition to the City
through plat FP FP-018-079 or FS-N/A; and
WHEREAS, the Developer and the City have entered into a Community Facilities
Agreement relating to the development,Oak Court Addition for Paving, Drainage,Water, Sewer,
Street Lights ("Improvements"); and
WHEREAS, the City has required certain assurances that the Developer will cause to be
constructed to City standards the Improvements pursuant to the Community Facilities Agreement;
and
WHEREAS, the Parties desire to set forth the terms and conditions of such
accommodations as are described above.
NOW, THEREFORE, for and in consideration of the mutual covenants and agreements
hereinafter set forth, it is hereby agreed by and between City and Developer as follows:
1. Recitals. The foregoing recitals are true, correct and complete and constitute the basis for
this Agreement and they are incorporated into this Agreement for all purposes.
2. The Completion Amount. The City and the Developer agree that the Hard Costs(as shown
on Exhibit`B")required to complete the Community Facilities in the aggregate should not
exceed the sum of FOUR HUNDRED EIGHTY SIX THOUSAND FOUR HUNDRED
EIGHTY THREE AND 70/100 Dollars (($486,483.70),hereinafter called the"Completion
Amount". Notwithstanding the foregoing, it is acknowledged that the actual costs of
City of Fort Worth, Texas
Standard Completion Agreement—Self-Funded Revised 09.07.2017 ME
CFA Official Release Date: 07.01.2015
Page 1 of 10
completion of the Community Facilities may vary as a result of change orders agreed to by
the Parties, but such variances for the purposes of this Agreement shall not affect the
Completion Amount as used herein. City hereby waives the requirement for developer to
deposit a financial guarantee of 100% of the Hard Costs under the CFA Policy.
3. Completion by the Developer. The Developer agrees to complete the Community Facilities
and pay all Hard Costs in accordance with City standards,the CFA,the Plat, and the Plans
as approved by the City. For the purposes of this Agreement, the development of the
Property shall be deemed complete upon acceptance by the City of the Community
Facilities pursuant to Section 6,hereof.
4. Satisfaction of the City Reguirements. The City agrees that the assurances and covenants
contained in this Agreement satisfy all requirements of the City with respect to Developer's
Financial Guarantee, as described in the CFA Policy, or other requirements for security in
connection with the development of the Property and t'.'le completion of the Community
Facilities that are contained in the CFA or in any other agreement relating thereto, and the
City hereby accepts the assurances and covenants contained herein in lieu thereof. To the
extent the CFA irreconcilably conflicts with this Agreement, the provisions of this
Agreement shall control.
5. Termination. This Agreement shall terminate upon the earlier to occur of the following:
(a)acceptance by the City of the Community Facilities; or(b)mutual written agreement of
the Parties.
6. Final Plat. The Parties acknowledge and agree that the City shall hold the final plat of the
Property until the Community Facilities are completed and accepted by the City and all
Hard Costs contractors have been paid, less retainage. Upon acceptance by the City and
receipt of evidence from the Developer showing that all (Hard Costs contractors have been
paid, including but not necessarily limited to lien waivers and bills paid affidavits,the City
shall within a reasonable time file the final plat for the Property in the Plat Records of the
county where the Property is located. The purpose of the City retaining the final plat of
the Property as provided herein is to guarantee the Developer's obligations under the CFA
are completed.
City of Fort Worth, Texas
Standard Completion Agreement—Self-Funded Revised 09.07.2017 ME
CFA Official Release Date: 07.01.2015
Page 2 of 10
7. Construction Contracts. Developer agrees to include in each Construction contract that it
enters into for the completion of the Community Facilities the following:
A. A statement that the City is not holding any security to guarantee any payment for work
performed on the Community Facilities;
B. A statement that the Property is private property and that same may be subject to
mechanic's and materialman's liens;
C. A requirement that each contractor contracting with the Developer release the City
from any claim that is related to the Property; and
D. A requirement that each contractor contracting with the Developer include in each
subcontract the statements contained in (a), (b) and (c) above.
8. Miscellaneous.
A. Non-Assignment of Agreement. This Agreement may not be assigned by any of the
Parties without the prior written consent of all the other Parties.
B. Notice. Any notice required or permitted to be delivered under this Agreement shall
be deemed received on actual receipt by the appropriate party at the following
addresses:
(i) Notice to the City shall be addressed and delivered as follows:
City of Fort Worth
Planning & Development Department
200 Texas Street
Fort Worth, Texas 76102
Attention: CFA Division
Janie Morales, Development Manager
Email: Jan]e.Morales@fortworthtexas.gov
Confirmation Number: 817-392-7810
and/or
CFA Division
Email: CFAAfortworthtexas.gov
Confirmation Number: 817-392-2025
With a copy thereof addressed and delivered as follows:
City of Fort Worth, Texas
Standard Completion Agreement—Self-Funded Revised 09.07.2017 JLE
CFA Official Release Date: 07.01.2015
Page 3 of 10
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
Attention: Richard A.McCracken
Assistant City Attorney
Confirmation Number: 817-392-7611
(ii) Notice to the Developer shall be addressed and delivered as follows:
BH Operations Land,LLC
101 W. Glade Road;Suite 109
Euless,TX,76039
A party may change its address for notice upon prior written notice to the other parties
pursuant to the terms hereof.
C. Texas Law to Apply. This Agreement shall be construed under and in accordance with
the laws of the State of Texas.
D. Parties Bound. This Agreement shall be binding upon and inure to the benefit of the
Parties and their respective legal representatives, successors and assigns.
E. Legal Construction. In case any one or more of the provisions contained in this
Agreement shall for any reason is held to be invalid, illegal, or unenforceable in any
respect, such invalidity, illegality, or unenforceability shall not affect any other
provision of this Agreement, and this Agreement shall be construed as if such invalid,
illegal, or unenforceable provision had never been contained in this Agreement.
F. Prior Ajzreements Superseded. This Agreement constitutes the sole and only agreement
of the Parties with respect to the subject matter hereof and supersedes any prior
understandings or written or oral agreements among the Parties concerning the subject
matter hereof.
G. Amendment. This Agreement may only be amended by a written instrument executed
by all of the Parties to this Agreement.
City of Fort Worth, Texas
Standard Completion Agreement—Self-Funded Revised 09.07.2017 JLE
CFA Official Release Date: 07.01.2015
Page 4 of 10
H. Headings. The headings that are used in this Agreement are used for reference and
convenience purposes only and do not constitute substantive matters to be considered
in construing the terms and provisions of this Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth, Texas
Standard Completion Agreement—Self-Funded Revised 09.07.2017 JLE
CFA Official Release Date: 07.01.2015
Page 5 of 10
Executed in quadruplicate in each entity's respective name by its duly authorized signatories
effective as of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH: DEVELOPER:
BH Operations Land LLC
�r
Jesus J.Chapa(Mar 8,2019)
Jesus J. Chapa Tayl r Hale(Mar 7,219)
Assistant City Manager Name: Taylor llale
Title: Manager
Date: Mar 8,2019
Date: Mar 7,2019
Approved as to Form &Legality:
Richard A MccracRen
Richard A.McCracken(Mar8,20191 Contract Compliance Manager
Richard A. McCracken By signing I acknowledge that I am the
Assistant City Attorney person responsible for the monitoring and
administration of this contract, including
ATTEST: rt ��,'`' ensuring all performance and reporting
requirements.
Mary J.Kayser(Mar 8,
Mary J. Kayser '' N Jennifer Ezernack on be alf of Janie Morales(Mar 8,20191
City Secretary Janie S. Morales
Development Manager
M&C:
Date:
City of Fort Worth, Texas
Standard Completion Agreement—Self-Funded Revised 09.07.2
CFA Official Release Date: 07.01.2015 OFFICIAL RECORD
Page 6 of 10 CITY SECRETARY
FT. WORTH,TX
LIST OF EXHIBITS
ATTACHMENT"1"-CHANGES TO STANDARD AGREEMENT
EXHIBIT A- LEGAL DESCRIPTION
EXHIBIT B - APPROVED BUDGET
City of Fort Worth, Texas
Standard Completion Agreement—Self-Funded Revised 09.07.2017 JLE
CFA Official Release Date: 07.01.2015
Page 7of10
ATTACHMENT "1"
Changes to Standard Agreement
Self-Funded Completion Agreement
None
City of Fort Worth, Texas
Standard Completion Agreement—Self-Funded Revised 09.07.2017 JLE
CFA Official Release Date: 07.01.2015
Page 8 of 10
EXHIBIT A
LEGAL DESCRIPTION
WHEREAS Testudo Land, LLC, being the owner of a 5.823 acre tract of land situated in the
Robert Ray Survey,Abstract No. 1290, City of Fort Worth, Tarrant County, Texas and
described deed recorded in by Document No. D216010304, Deed Records, Tarrant County,
Texas (D.R.T.C.T.), and being more particularly described by metes and bounds as follows:
(Bearings referenced to U.S. State Plane Grid 1983 - Texas North Central Zone (4202)NAD83
as established using the Western Data Systems RTKNet Cooperative Network. Reference frame
is NAD83(2011)Epoch 2010.0000. Distances shown are U.S. Survey feet displayed in surface
values);
BEGINNING at a found 1/2 capped iron rod marked "BRITTAIN&CRAWFORD" for the
southwest corner of said Testudo Land, LLC tract, same being the southeast corner of Lot 1,
Block 8,Emory Place, an addition to the city of Fort Worth, Tarrant County, Texas as shown on
plat recorded in Document No. D205172329 of the Plat Records of Tarrant County Texas
(P.R.T.C.T.) and being in the north right-of-way line of John T. White Road(a 120 foot public
right-of-way);
THENCE with the common line between the said Testudo tract and said Block 8, Emory Place
the following courses and distances:
North 00'22'16"West, a distance of 356.63 feet to a found 5/8 inch capped iron rod marked
"PATE RPLS 5647" for the northwest corner of the said Testudo tract, same being the northeast
corner of Lot 7, said Block 8 of Emory Place;
North 89°37'38" East, at a distance of 672.37 feet passing the southwest corner of said Block 8,
Emory Place and now continuing with the common line between the said Testudo tract and
Block 2,Emory Place an addition to the City of Fort Worth, Tarrant County, Texas as shown on
plat recorded in Document No. D205340888, P.R.T.C.T. for a total distance of 700.87 feet to a
set 5/8 inch capped iron rod marked`BHB INC" (IRS);
THENCE South 00°43'47"East with the common line between the said Testudo tract and the
west line of said Block 2, Emory Place a distance of 366.00 feet to a found 1/2 inch iron rod for
the southeast corner of the said Testudo tract same being the southwest corner of Lot 2, said
Block 2, Emory Place and being in the north right-of-way line of the aforementioned John T.
White road;
THENCE North 89°36'34" West,with the common line between the said Testudo tract and the
said north right-of-way line of John T. White Road, a distance of 703.22 feet to the POINT OF
BEGINNING and containing 253,639 Square Feet or 5.823 acres of land more or less.
City of Fort Worth, Texas
Standard Completion Agreement—Self-Funded Revised 09.07.2017 JLE
CFA Official Release Date: 07.01.2015
Page 9of10
EXHIBIT B
APPROVED BUDGET
Section I
Water $80,220.91
Sewer $77;841.18
Sub-total $158,062.09
Section 11
Interior Streets $230,475.00
Storm Drains $77,381-01
Sub-total $307,856.61
Section III
Street Lights $20,565.00
Sub-total $20,565.00
TOTAL $486,483.70
City of Fort Worth, Texas
Standard Completion Agreement—Self-Funded Revised 09.07.2017 ME
CFA Official Release Date: 07.01.2015
Page 10 of 10