Loading...
HomeMy WebLinkAboutContract 52013 Received Date: 03/11/2019 Received Time: 9:26 am Developer and Project Information Cover Sheet: Developer Company Name: Pulte Homes of Texas,L.P. Address, State,Zip Code: 4800 Regent Blvd, Suite 100,Irving,TX 75063 Phone&Email: 972-462-3409,clint.vincentna,pultegroup.com Authorized Signatory,Title: ; Clint Vincent,Vice President of Land Development Project Name: Willow Ridge Estates 6A& 6B [Brief Description: Water,Sewer,Paving, Storm Drain, Street Lights Project Location: At the terminus of Twisting Peak Road Plat Case Number: PP-17-023,FP- Plat Name: 17-116,FP-17- 117 Mapsco: Council District: 7 CFA Number: ' 2018-024 City Project Number: 101441 City of Fort Worth,Texas Standard Community Facilities Agreement-Willow Ridge Estates Phase6A&6B OFFICIAL RECORD CFA Official Release Date:02.20.2017 g CR� Page 1 of 11 STANDARD COMMUNITY FACILITIE 5 AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No.52013 WHEREAS,Pulte Homes of Texas, L.P. , ("Developer'), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements")related to a project generally described as Willow Ridge Estates Phase6A & 6B ("Project")within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"). and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall b ; memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement-Willow Ridge Estates Phase6A&613 OFFICIAL RECORD CFA Official Release Date:02.20.2017 Page 2 of 11 CITY SECRETARY FT WORTH,TX to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) ®, Sewer(A-1) ®, Paving (B) ®, Storm Drain (B-1) ®, Street Lights & Signs (C) M. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement-Willow Ridge Estates Phase6A&6B CFA Official Release Date:02.20.2017 Page 3 of 11 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in exce§s of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required.by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-Willow Ridge Estates Phase6A&6 CFA Official Release Date:02.20.2017 Page 4 of 11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character,whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the allezed nejelikence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from,or in any way connected with,the construction of the infrastructure contemplated herein,whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-Willow Ridge Estates Phase6A&6B CFA Official Release Date:02.20.2017 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assigrnnent of all warranties given by the contractor, whether express or implied. Further,Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent(2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent(4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two(2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial 11"arantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Willow Ridge Estates Phase6A&6 CFA Official Release Date:02.20.2017 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. IMMIGRATION AND NATIONALITY ACT R. Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. City of Fort Worth, Texas Standard Community Facilities Agreement-Willow Ridge Estates Phase6A&6B CFA Official Release Date:02.20.2017 Page 7 of 11 Cost Summary Sheet Project Name: Willow Ridge Estates Phase 6A&6B CFA No.: 2018-024 CityProject No.: 101441 An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 162,559.00 2.Sewer Construction $ 180,030.50 Water and Sewer Construction Total $ 342,589.50 B. TPW Construction 1.Street $ 390,245.50 2.Storm Drain $ 737,580.60 3.Street Lights Installed by Developer $ 57,661.75 4. Signals $ TPW Construction Cost Total $ 1,185,487.85 Total Construction Cost(excluding the fees): $ 1,528,077.35 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 6,851.79 D. Water/Sewer Material Testing Fee(2%) $ 6,851.79 Sub-Total for Water Construction Fees $ 13,703.58 E. TPW Inspection Fee(4%) $ 45,113.04 F. TPW Material Testing(2%) $ 22,556.52 G. Street Light Inspsection Cost $ 2,306.47 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ Sub-Total for TPW Construction Fees $ 69,976.03 Total Construction Fees: $ 83,679.61 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 1,528,07 .35 x Completion Agreement=100%/Holds Plat $ 1,528,077.35 Cash Escrow Water/Sanitary Sewer-125% $ 428,236.88 Cash Escrow Paving/Storm Drain=125% $ 1,481,859.81 Letter of Credit=125%w/2yr expiration period $ 1,910,09 .69 City of Fort Worth,Texas Standard Community Facilities Agreement-Willow Ridge Estates Phase6A&6B CFA Official Release Date:02.20.2017 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER Pulte Homes of Texas,L.P. Jesus J.Chapa(Mar 8,2019) Jesus J. Chapa Assistant City Manager C4 -YV� Date: Mar 8,2019 Clint Vincent(Mar 6,2019) Name: Clint Vincent Recommended by: Title: Vice President of Land Development Date: Mar 6,2019 Evelyn Robe s(Mar 6,2019) Evelyn Roberts/Jennifer Ezernack Project Assistant Planning and Development Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and Approved as to Form &Legality: administration of this contract, including ensuring all performance and reporting requirements. fUGI'�GIYGI A I"!GCi'AGKBYI Richard A.McCracken(Mar 8.2019) Richard A. McCracken Aa Assistant City Attorney Jennifer Ezernack on behalf of Janie Morales(Mar 8,2019) M&C No. NSA Name: Janie Morales Date: Title: Development Manager Form 1295: N/A (•�'(q_T'' ATTEST: i' Mary J.Kayser(Mar 8,2 9) Mary J. Kayser/Ronald Gonzales TEE'S City Secretary/Assistant City Secreta City of Fort Worth,Texas Standard Community Facilities Agreement-Willow Ridge Estates Phase6A&6B OFFiC IAL RECORD CFA Official Release Date: 02.20.2017 CITV SECRETARY Page 9 of 11 FT. WORTH,TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Attachment 1 -Changes to Standard Community Facilities Agreement ® Location Map ® Exhibit A:Water Improvements ® Exhibit A-1: Sewer Improvements ® Water and Sewer Cost Estimates ® Exhibit B: Paving Improvements ® Paving Cost Estimate ® Exhibit B-1: Storm Drain Improvements ® Storm Drain Cost Estimate ® Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Willow Ridge Estates Phase6A&613 CFA Official Release Date:02.20.2017 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 101.441 None. City of Fort Worth, Texas Standard Community Facilities Agreement-Willow Ridge Estates Phase6A&6B CFA Official Release Date:02.20.2017 Page 11 of 11 00 42 43 DAP-BIDPROPOSAL PW I or 2 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item Specification Unit or Bid No. Descriptionspecification No. I Measure Quantity Unit Price Bid Value UNIT I:WATER IMPROVEMENTS 1 3305.0003 8"Waterline Lowering 33 05 12 EA 1 $2,700.00 $2,700.00 2 3305.0109 Trench Safety 33 05 10 LF 2570 $0.10 $257.00 3 3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 1.44 $4,890.00 $8,624.00 - - - - 4 3311.0241 8"DR-14 Water Pipe 3311 12 LF 2570 $22.40 $57,568.00 5 3312.0001 Fire Hydrant 331240 EA 6 $2,900.00 $17,400.00 6 3312.0117 Connection to Existing 4"-12"Water Main 331225 EA 4 $800.00 $3,200.00 7 3312.2003 1"Water Service 331210 EA 71 5840.00 $59,640.00 _. 8 3312.2003 1"Irrigation Service 33 12 10 EA 1 $840.00 $840.00 9 3312.3002 6'Gate Valve 331220 EA 6 $860.00 $5,180.00 10 1 3312.3003 8"Gate Valve 33 12 20 EA 7 $1.310.00 $9.170.00 TOTAL UNIT 1:WATER IMPROVE ENTS $162,559.00 UNIT If:SANITARY SEWER IMPROVEMENTS 1 3301.0002 Post-CCTV Inspection 33 01 31 LF 2465 $1.40 $3,451.00 2 3301.0101 Manhole Vacuum Testing 330130 EA 8 $110.00 $880.00 3 3305.0107 Manhole Adjustment,Minor 33 05 14 EA 1 $700.00 $700.00 4 3305.0109 Trench Safety 330510 LF 2465 $1.00 $2,465.00 5 3305.0113 Trench Water Stops 33 05 15 EA 6 $300.00 $1,800.00 6 3305.0116 Concrete Encasement for Utility Pipes 330510 CY 13.2 $300.00 $3,960.00 7 3331.3101 4"Sewer Service 3331 50 EA 71 $750.00 $53,250.00 8 3331.4115 8"Sewer Pipe 33 31 20 LF 1863 $33.50 $62,410.50 9 3331.4116 8"Sewer Pipe,CSS Backfill 333 1 20 LF 80 $43.00 $3,440.00 10 3331.4201 10"Sewer Pipe 33 31 20 LF 462 $37.00 $17,094.00 11 3331.4202 10"Sewer Pipe,CSS Backfill 333120 LF 60 $45.00 $2,700.00 12 3339.1001 4'Manhole 33 39 20 EA 9 $2,740.00 $24,660.00 13 1 3339.1003 4'Extra Depth Manhole 1 33 39 20 VF 1 23 $140.001 $3,220.00 TOTAL UNIT If:SANITARY SEWER IMPROVEMENTS1 IMPROVEMENTS $180,030.50 UNIT III:DRAINAGE IMPROVEMENTS 1 0241.0800 Remove Rip Rap 0541 13 SF 1926 $1.10 i2,118.60 2 0241.3201 Remove Storm Sewer Box 0241 14 LF 61 $29.50 $1,799.50 3- 0241.4201 Remove 4'Drop Inlet 0241 14 EA 1 $1,000.00 $1,000.00 4 0241.4401 Remove Headwall/SET 62-4-1 14 EA 4 $900.00 $3,600.00 5 3137.0104 Medium Stone Riprap,dry 313766 SY 239 $50.00 $1.1.950.00 6 3305.0109 Trench Safety 330510 LF 2619 $0.50 $1,309.50 7 3305.0112 Concrete Collar 33 05 17 EA 6 $400.00 $2,400.00 8 3341.0201 21"RCP,Class III 3341 10 LF 84 $56.00 $3,584.00 9 3341.0205 24"RCP,Class 111 33 41 10 LF 101 $56.00 $8,666.00 10 3341.0302 30"RCP,Class III 33 o 10 LF 882 $83.00 $73,206.00 11 3341.0309 36"RCP,Class III 33 41 10 LF 233 $115.00 $26,795.00 12 3341.0410 48"RCP,Class IV 3341 10 LF_ 929 $229.00 $212,741.00 13 3341.1202 5x4 Box Culvert 33 41 10 LF 293 $307.00 $89,951.00 14 3341.1302 63 Box Culvert 3341 10 LF 480 $312.00 $149,760.00 15 3349.0001 4'Storm Junction Box 344916 EA 4 $4,000.00 $16,000.00 16 3349.0002 5'Storm Junction Box 334910 EA 2 $4,200.00 $8,400.00 17 3349.0003 6'Storm Junction Box 33 4910 EA 1 $8,500.00 $8,500.00 18 3349.1000 Headwall,Box Culvert(2.8'x3') 33 49 40 EA 2 $28,300.00 $56,600.00 19 3349.1000 Headwall,Box Culvert(4-8'x3') 33 49 40 EA 2 $9,000.00 $18,000.00 20 3349.1000 Headwall,Box Culvert(6x4') 33 49 20 EA 1 $7,000.00 $7,000.00 21 3349.5001 10'Curb Inlet 33 49 20 EA 6 $3,400.00 $20,400.00 22 3349.5002 15'Curb Inlet 33 49 20 EA 2 $4,650.00 $9,300.00 23 1 9999.0001 8'Curb Inlet 33 49 20 EA 2 $3,250.00 $6.500.001 TOTAL UNIT III:DRAINAGE IMPROVE ENTS $737,580.60 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Vasim Sepus be 1,2015 00 42 43 Bid Propm DAP.xis 004243 DAP•BID PROPOSAL Pape 2 d2 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item specificationUnit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value UNIT IV:PAVING IMPROVEMENTS 1 0241.0100 Remove Sidewalk 0241 13 SF 605 $2.00 $1,210.00 2 0241.0300 Remove ADA Ramp 02 41 13 EA 1 $500.00 $500.00 3 0241.1000 Remove Conc Pvmt 02 41 15 SY 245 $20.00 $4,900.00 4 0241.1300 Remove Conc Curb&Gutter 0241 15 LF 71 $20.00 $1,420.00 5 3211.0400 Hydrated Lime 32-1129 TN_ 140.5 $155.00 $21,777.50 8 3211.0501 6"Lime Treatment 32 1129 SY 9347 $3.00 $28,041.00 7 3213.0101 6"Conc Pvmt(29'B-B) 32 13 13 SY 8818 $34.00 $299,812.00 8 3213.0301 4"Conc Sidewalk(5'Width) 32 13 20 SF 1723 $5.00 $8,615.00 9 3213.0501 Barrier Free Ramp,Type R-1 321320 EA 3 $2,000.00 $6,000.00 10 3213.0504 Barrier Free Ramp,Type M-2 32 1320 EA 3 $1,700.00 $5,100.00 11 3213.0506 Barrier Free Ramp,Type P-1 32 13 20 EA 3 $2,000.00 $6,000.00 12 3471.0001 Traffic Control 3471 13 LS 1 $1,5M.001 $1,500.00 13 9999.0001 Connect to Existing Pvmt 99 99 01 LF 237 $10.00 $2,370.00 14 9999.0002 Provide and Install Street Name Blades 99 99 02 1 EA 20 $150.00 $3,000.00 TOTAL UNIT IV:PAVING IMPROVEM NTS $390,245.50 UNIT V:STREET LIGHTING IMPROVEMENTS 1 2605.3015 2"CONDT PVC SCH 80(T) 26 0533 LF 1473 $6.50 $9,574.50 2 3441.1408 NO 6 Insulated Copper Elec Condr 3441 10 LF 3825 $0.95 $3,633.75 3 3441.1410 NO 10 insulated Copper Elec Condr 3441 10 LF 1473 $0.95 $1,399.35 4 3441.1501 Ground Box Tyke B 3441 10 EA 23 $1.05 $24.15 5 3441.3201 LED Lighting Fixture 34 41 20 EA 13 $375.00 $4,875.00 6 3441.3301 Rdwy Ilium Foundation TY 1 34 4120 EA 13 $1,010.00 $13,130.00 7_ 3441.1638 Install Type 33 B Arm 34 41 20 EA 13 $275.00 $3,575.00 8 3441.3341 R Ilium Type 11 Pole 34 41 20 EA 13 $1,650.001 $21,450.00 TOTAL UNIT V:STREET LIGHTING IMPROVEMENTS $57,661.75 UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS 1 NONE TOTAL UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS Bid Summary UNIT I:WATER IMPROVEMENTS $162,559.00 UNIT 11:SANITARY SEWER IMPROVEMENTS $180,030.50 UNIT III:DRAINAGE IMPROVEMENTS $737,580.60 UNIT IV:PAVING IMPROVEMENTS $390,245.50 UNIT V.STREET LIGHTING IMPROVEMENTS $57,661.75 UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS - Total Construction Bid $1,528,077.35 Contractor agrees to complet W RK for FINAL ACCEPTANCE 210 calendar days after the date when the CONTRACT commences to run s provided In the General Conditions. Name: � l.(Print) R.Gilreath Title: President Company: G'ko Contracting,Inc. Address: 6331 Southwest Blvd. Benbrook,Texas 76132 END OF SECTION CITY OF FOP I M'ORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS•DEVELOPER AWARDED PRNECTS Foam Version September 1,201$ 0042 43 Bid Propam1_DAP.xh PLANS FOR THE CONSTRUC'.PION OF PATER, SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE WILLOW RIDGE ESTATES, PHASES 6A & 6B MESA 6 A CROSSING ��L Q DRIVE MESA00 CREST DRIVE �y� S TE z 6 E3 N SITE o TWISTING 3 STAR DRIVE o V) j�a ami tic 3 00 .po 90 WEST BONDS RANCH ROAD VICINITY MAP (N.T, S.) N dB1 '°. CITY PROJECT NO. 101441 TERAS REGISTERED ENGINEERING FIRM F-438 WATER PROJECT NO. 56008-0600430-101441-001580 16301 Quorum Drive,Suite 200B Addison,Texas 75001 SEWER PROJECT NO. 56008-0700430-101441-001380 Tel:972-248-7676 Fax:972-248-1414 FILE NO. X-25155; W-2554 APRIL 2018 - SHEET 1 I FINAL PLAT WILLOW RIDGE ESTATES PHASE 6A BLOCK 13, LOTS 1-16 3.457 ACRES OUT OF THE JAMES RIGHLY SURVEY, ABSTRACT NO. 1268; HENRY ROBERTSON SURVEY, ABSTRACT NO. 1259 CITY OF FORT WORTH, TARRANT COUNTY, TEXAS THE PARKS OF WILLOW RIDGE HOME OWNER'S ASSOCIATION, INC. OWNER / DEVELOPER 4800 Regent Boulevard, Suite 100 (972)304-2800 Irving, Texas 75063 PULTE HOMES OF TEXAS, L.P. OWNER/DEVELOPER 4800 Regent Blvd., Suite 100 (972) 304-2800 Irving, Texas 75063 JBI PARTNERS, INC. SURVEYOR/ENGINEER 16301 Quorum Dr., Suite 200 B (972) 248-7676 Addison, Texas 75001 TBPE No. F-438 TBPLS No. 10076000 CITY PROJECT NO. 101441 TEXAS REGISTERED ENGINEERING FIRM F938 WATER PROJECT NO. 56008-0600430-101441-001580 16301 Quorum Drive,Suite 200B Addison,Texas 75001 SEWER PROJECT NO. 56008-0700430-101441-001380 Tel:972-248-7676 Fax:972-248-1414 FILE NO.X-25155; W-2554 APRIL 2018 - SHEET 2 I 40' EAGLE MOUNTAIN PIPELINE COMPANY, L.P. RIGHT-OF-WAY AGREEMENT EASEMENT DOC. NO. D205359730 116 1158 8079 11417'."\91 DRIVE ') 82 T1MNIt 113 6 11 � J83 112 __ _� 1 8 � 12 5 c WILLCW RIDGE ESTATES 3111 84 Doc NO. 2141 2817 go s N ct 13 12 4 N 8 110 - 85 !9 15 WILLO RIDGE ES14 3 PHASE NE, SECTI N ONE 30 CAB. A, SLIDE 1 _238 a 14 109 - 15 2 86 13 108 1 87 � 12 89 16 88 .. PLAT MAP �LF i'—I0'�' PLANS FOR THE CONSTRUCTION OF WATER, SEVER, PAVING, STREET LIGHTING, & JBI, I' DRAINAGE IMPROVEMENTS TO SERVE 1� ,rmip WILLOW RIDGE ESTATES,PHASE 6A TERAS REGISTERED ENGINEERING FIRM F-438 (CPN#101441) 16301 QUORUM DRIVE,SUITE 200B ADDISON,TEXAS 75001 TEL:972-248-7676 FAX:972-248-1414 APRIL 2018 — SHEET 3 FINAL PLAT WILLOW RIDGE ESTATES PHASE 613 BLOCK 28, LOTS 7-26; BLOCK 29, LOTS 1-23; AND BLOCK 30, LOTS 1-15 27.719 ACRES OUT OF THE JAMES RIGHLY SURVEY, ABSTRACT NO. 1268; HENRY ROBERTSON SURVEY, ABSTRACT NO. 1259 CITY OF FORT WORTH, TARRANT COUNTY, TEXAS PULTE HOMES OF TEXAS, L.P. OWNER/DEVELOPER 4800 Regent Blvd., Suite 100 (972) 304-2800 Irving, Texas 75063 JBI PARTNERS, INC. SURVEYOR/ENGINEER 16301 Quorum Dr., Suite 200 B (972) 248-7676 Addison, Texas 75001 TBPE No. F-438 TBPLS No. 10076000 JBI CITY PROJECT NO. 101441 TEXAS REGISBRED ENGINEERING FIRM F-438 WATER PROJECT NO. 56008-0600430-101441-001580 16301 Quorum Drive,Suite 200B Addison,Texas 75001 SEWER PROJECT NO. 56008-0700430-101441-001380 Tel:972-248-7676 Fax:972-248-1414 FILE NO.X-25155; W-2554 APRIL 2018 - SHEET 4 I a ] ]x v b 9 � LLow rote TATFs � .: I wat 6 •' 99I I ., t D N D21 DJ086 t t � .t I I PINNACLE WOE ROAD x t ]6 ]t COILYFNT 19]IOF�P EO1]19E 6 Oe9 efA��srw� I nDx ee 90 I 1L11+U m9p„n onvn, m ++ n 13 s+ I a I s � » I 11. ++ +n 1t s(+1�o ,o t sn. . aAoeer)r 1I aK n 7 e o +o I N, s 1s I ..R I s e 7 e e to 11 1nin 14 in Is 17 BLOCK 7! —. — VAN ZA T FARMS p<aq 7 ATFDS l GREE% CAB.A. DE 6459 x5 x9 x] ,e BLOCK 7 17 RO"IAIE IMM t! .. PLAT MAP L_-: 1' uu PL. NS FOR THE CONSTRUCTION OF NATER, dEB--' SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE WILLOW RIDGE ESTATES,PHASE 6B (CPN#101441) TERAS REGISTERED ENGINEERING FIRM F-438 16301 QUORUM DRIVE,SUITE 2006 ADDISON,TEXAS 75001 TEL:972-248-7676 FAX:972-248-1414 APRIL 2018 - SHEET 5 I 40' EAGLE MOUNTAIN PIPELINE COMPANY, L.P. RIGHT-OF-WAY AGREEMENT EASEMENT DOC. NO. D205359730 9 116 115 $ 80 81 79 114 10 7 /— — ' —►�— DRIVE .) 82 TININII 113 11 6 I I 83 112 1 5 8 12 WILL RIDGE ESTATES 3 111 84 Doc I NO. 2141 2817 s 13 o 4 y v PROP. 8" WL �~ 1; 1108 5 1 � 15 I � WILLO RIDGE E� 14 3 PHASE NE, SECT] N ONE zi o CAB. A, SLIDE p 238 0 14 I 109 86 m� 15 2 z 13 / 1 I 108 87 I 12 89 16 _ CONN. TO EX. 8" WL 88REFER TO WILLOW RIDGE ESTATES PH. 2A CITY PROJECT NO. 02186t 11 LEGEND PROP. WATERLINE —►�— PROP. VALVE S,- v L�� I 1`1�-J' PROP. FIRE WATER HYDRANT PLANS FOR THE CONSTRUCTION OF WATER, — —N— — EXIST. WATER LINE SEWER, PAVING, STREET LIGHTING, & 6BI '�` DRAINAGE IMPROVEMENTS & VALVE TO SERVE �""■■�� WILLOW RIDGE ESTATES,PHASE 6A TEXAS REGIS'T'ERED ENGINEERING FIRM F438 PROPOSED WATER (CPN#101441) LINES ARE 8" UNLESS 16301 QUORUM DRIVE,SUITE 200B OTHERWISE INDICATED. ADDISON,TEXAS 75001 TEL:972-248-7676 FAX:972-248-1414 APRIL 2018 — SHEET 6 I I ROAD x, CONN. TO EX. 8" WL o No.p i. ,, A / REFER TO WILLOW ILL RIDGE ESTATES PH. 5 " CITY PROJECT NO. 100480 „w CONN. TO EX. 8" WL '* u REFER TO WILLOW 17 I' ( ° 3 4 ° PROP. 8" WL u RIDGE ESTATES PH. 3A y CITY PROJECT NO. 100123 „ CONN. TO EX. 8" WL is 14 Ta 14 n & REFER TO WILLOW I RIDGE ESTATES PH. 5 m PROP. 8" WL CITY PROJECT NO. 100480 o to s e 7 ° 01 t"" ti /7 a PROP. 8" WL — — K=an VAN ZA T FARMS aoa ATF05 L CHEER CAB.n, DE 6459 xs x1 x, ,9 le PI Of.K ROOD LAK EST le LEGEND PROP. WATERLINE PROP. VALVE PROP. FIRE WATER —� HYDRANT PLANS FOR THE CONSTRUCTION OF WATER, —>< — EXIST. WATER LINE SEWER, PAVING, STREET LIGHTING, & & VALVE DRAINAGE IMPROVEMENTS TO SERVE ��■��/ WILLOW RIDGE ESTATES,PHASE 6B TEXAS REGISTERED ENGINEERING FIRM F-438 PROPOSED WATER (CPN#101441) LINES ARE 8" UNLESS 16301 QUORUM DRIVE,SUITE 200B OTHERVASE INDICATED. ADDISON,TEXAS 75001 TEL:972-248-7676 FAX:972-248-1414 APRIL 2018 — SHEET 7 40' EAGLE MOUNTAIN PIPELINE COMPANY, L.P. RIGHT—OF—WAY AGREEMENT EASEMENT DOC. NO. D205359730 9 116 115 8 80 81 79 114 10 7 DRIVE 82 TIMNR 113 PROP. 8" SS WR 83 112 1 5 8 0 12 WILLCW RIDGE ESTATES 3 111 I 84 Do No. 214122B17 Se 13 4 W v 110 85 8 15 WILLO RIDGE ES 14 ; 3 �^ PHASE NE, SECT N ONE =3 U O CAB. A, SLIDE 1 .238 < 1 109 86 m� 15 2 CONN. TO EX. 8" SSWR 13 REFER TO WILLOW RIDGE ESTATES PH. 2A 108 CITY PROJECT NO. 02186 87 � 89 12 16 88 � 11 ew LEGEND PROP. S.S. LINE --0-- PROP. S.S. MH — —C— — EXIST. S.S. MH sc LL — EXIST. S.S. LINE SANITARY -- PLANS FOR THE CONSTRUCTION OF WATER, �' .l SEWER, PAVING, STREET LIGHTING. & DRAINAGE IMPROVEMENTS TO SERVE �'`■rte w WILLOW RIDGE ESTATES,PHASE 6A TEXAS REGISTERED ENGINEERING FIRM FA38 (CPN#101441) PROPOSED SANITARY 16301 QUORUM DRIVE,SUITE 200B SEWER LINES ARE 8" ADDISON,TEXAS 75001 UNLESS OTHERWISE TEL 972-248-7676 INDICATED. FAX:972-248-1414 APRIL 2018 — SHEET 8 k.7.8R,OEFER {. 10" SSWR I LLow IoGELLOW o .R.oz, ES PH. 3A �q T NO. 100123 'F rlNHAC E 9=Raw '• n 1 �,I— L :L I , BUXX 30 n■e ira M Jo 14 a " PROP. 10" SSWR m 23 a: PROP. 8" SSWR PROP. 8" SSWR „ (1L+7e K) I 1 7 ! 4 ! 7 ■ 0 10 I } PROP. 10" SSWR 1IOOiiyy ° PROP. 8" SSWR 23PROP. 8°° SSWR 17 VAN ZA T FARMS soot AT FOS L CREEK LAB.A. IDE 8159 fs 3. ll u 2p 19 10 -CK 7 17 RM=LAW OW to LEGEND -- PROP. S.S. LINE 0 PROP. S.S. MH — — EXIST. S.S. MH cLE: 1 — EXIST. S.S. LINE SANITARY PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & 4:3B' •�' DRAINAGE IMPROVEMENTS TO SERVE WANIIIIII WILLOW RIDGE ESTATES,PHASE 6B TEXAS REGISTERED ENGINEERING FIRM F-438 (CPN#101441) PROPOSED SANITARY 16301 QUORUM DRIVE,SUITE 2008 SEWER LINES ARE 8• ADDISON,TEXAS 75001 UNLESS OTHERWISE TEL:972-248-7676 INDICATED. FAX 972-248-1414 APRIL 2018 — SHEET 9 I 40' EAGLE MOUNTAIN PIPELINE COMPANY, L.P. RIGHT—OF—WAY AGREEMENT EASEMENT DOC. NO. D205359730 116 115 9 $ 1 80 81 79 114 10 7 / 000°° \ 82 113 °0000000 11 °0000000 6 00000 112 00° 83 1 0 5 °0 8 12 0WILLCW RIDGE ESTATES 111 �0 84 DOC 40. 214122817 13 4 110 85 15 WILLOWOGE s 14 3 PHASE N , SECfIl N ONE CAB, A, SLID 1 238 14 109 15 00 2 86 00 0 13 00 00 108 000 1 87 000 12 89 16 0 88 � 11 10.5PARKWAY 19'OROAOWAr 10.5'PARKWAv �� 1. flYA1l( —BE." TW yA ST�AN�RD]-1L a m LRsyL Po PEA—1(YA%)u.E. ARD - DAfEHMSE BY IIE ( 1HERs) Bim..ERCED BTA.0 GR (Y 0 ERsj CRATE 1] sTA}PARD 1'CURB ;• ( )R) 31 PER E TP R PER -051 3 135 BE— A1Ii0.5i o B" T,• B' C.IA LTFD A[TED CE PT.LL — w AnPA�ERaA3 nDR z D. tz•--I� L B AAYE Iuzm BAC FlLL a O.C.R.M. PER J1 1J 1J DSII SUBGRA[£O]ORlH.S./AyBT ER PER 2 W Sr- v LL: - R sFLnW 3211 N RESIDENTIAL CONCRETE STREET SECTION(L) 3=1313-D503 PAVING �' LEGEND PLANS FOR THE CONSTRUCTION OF WATER, (1SEWER, PAVING, STREET LIGHTING, & RESIDENTIAL DRAINAGE IMPROVEMENTS 0 0 0 o TO SERVE TEXAS REGISTERED ENGINEERING FIRM FA38 29' B—B WILLOW RIDGE ESTATES,PHASE 6A 16301 QUORUM DRIVE,SUITE 2000 (CPN#101441) ADDISON,TEXAS 75001 TEL:972-248-7676 FAX:972-248-1414 APRIL 2018 — SHEET 10 b v n tl AI b A9 I elna R a u a elnoc, � I LLDW IDGE TATES St N D3+0]006 „ a PNNAW raw ROAD h iQ FASFxIEYT 10 tI,- L !, OOCIMAi Me.-1. ROOF 30 I-& 14 20n M 1 3 3 4 0 7 I. • » 11 3 13 y I T � I 22 to e023 °s0 0°eO71°Oo°'°oD »000»°0077° O1. Ila I­ L: ■ 7 ■ • 4 1■ I s Is I � I ! s 7 • • 10 1113 14 7■ » 17 MM 30 —_ — VAN T FARMS amt 7 AT L CREEK CAB.A. E 6458 >e ,4 a BLDCK 7 t) ROLL D LANE VEST u — 1a!'PARRWAT a•HOMY --ta5'PANKRAT —A.4CPE SHALL 6E k- TAYPFD lOPsOI PFA %IAI lOPS71L PFA ) PFA MY IMAE)1A1E41 SECA6e>2 ! STANDARD 7.O,U i CnON 3x W t6 BELTED OMFA„SE CY T1E S)ANDARD SOEVAUt 1 PDt>?1],1-6165 STANDARD 9UEWAU{ �WFEA. (BYD1NFA5J e-{. ! FpIf2D J (fiv Dl11FAsj k. I 5 lTAMDMD T CURB PFA 37 13 13-0521 k-PFA FT.(YMJ 'Nx].) icCT.3t +s xA Tro. a Tw. 4 luAx) ls�u y.nn FR)6 (s.Dx MAr70a WN) , CDUPA�crtn , w NATNFABATAaX wlY - +"IU]NON6NAL~. .••~ ' "'- •: fZ.•A' CtlPACTm PQ B—C. p 6AR5• CDNSTRUC_ PRIPoSFD e•ulE STABRIEED+ pMEA sELwW LL Jt 24 W •4C.6W PFA>Z 13 1]-Dl11 91•GADe 6 JO FDiAY RFR n E4 DD SC ALE: 1 =300' SLAM 11 n RESIDENTIAL CONCRETE STREET SECTION(L) PAVING 3zv s613-Dxd8i LEGEND PL�I.NS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & RESIDENTIAL DRAINAGE IMPROVEMENTS 0 0 0 o TO SERVE TEAS REGISTERED ENGINEERING FIRM F433 29' B—B WILLOW RIDGE ESTATES,PHASE 6B 16301 QUORUM DRIVE,SUITE 200B _ (CPN#101441) ADDISON,TEXAS 75001 = SIDEWALK BY TEL:972-248-7676 DEVELOPER FAX:972-248-1414 APRIL 2018 - SHEET 11 40' EAGLE MOUNTAIN PIPELINE COMPANY, L.P. RIGHT-OF-WAY AGREEMENT EASEMENT DOC. NO. D205359730 9 116 115 I 8 80 81 79 114 10 DRIVE 82 TMNR 113 11 6 83 112 I 1 8 VIII 12 5 WILLCW RIDGE ESTATES ;Ilh 111 84 Do No. 2141 2x17 ollU 'lll� 13 I I 4 VIII 11015 85 WILLO RID(�1 ES 14 3 �^ PHASE NE,JOE N ONE =U O 3 CAB. A, SL DE 1 238 <0 14 l� 109 15 2 86 111 108 30" RCP 87 12 89 \ 16 88 � it LEGEND C= PROP. INLET EXIST. INLET PROP. ONSITE STORM DRAIN -- -- --- EXIST. STORM DRAIN STORM DRAINAGE PLANS FOR THE CONSTRUCTION OF WATER, ip SEVER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE TEXAS REGISTERED ENGINEERING FIRM F438 WILLOW RIDGE ESTATES,PHASE 6A (CPN#101441) 16301 QUORUM DRIVE,SUITE 200B ADDISON,TEXAS 75001 TEL:972-248-767 FAX:972-248-1414 APRIL 2018 - SHEET 12 I °x °2 9, b s ' a LLOW IDGE TATES x 7 59 s, D .N.D21 07088 I 23 Q y J PDKA=ROm ROAD 1 1 C xt o t LF b r YpT No,ox17m719B I I ,s e,=.W E= emYeb n enimtm ,. „ 2-6'X3' RCB ° 30" RCP 24 a I & „ � a d - H-TITIT ,e ,e +* I a n34 , to,ox H -1 5'X4' RCB , r 48" RCP ® t B 48" RCP e I ID ,t +: +s 48" RCP ,e +, — — t 1 C4-6'X3' RCB e,nac ae VAN T EAYMS FA.O \ Wsa T AT L LFEEN CAB.A. DE fi459 xs 25 za u it zB is 1° FLOCK 7 17 ROOD lMF ERT 'e LEGEND o PROP. INLET EXIST. INLET PROP. ONSITE STORM D RAIN -_ EXIST. STORM DRAIN STORM DRAINAGE dB- 1 PLANS FOR THE CONSTRUCTION OF WATER, SEVER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE TEXAS REGISTERED ENGINEERING FIRM FA38 WILLOW RIDGE ESTATES,PHASE 6B (CPN#101441) 16501 QUORUM DRIVE,SUITE 200B ADDISON,TEXAS 75001 , TEL:972-248-7676 FAX:972-248-141 APRIL 2018 - SHEET 13 9 116 115 I 8 80 I I 81 79 114 10 7 DRIVE 82 TMNII 82 113 11 6 83 112 I 1 8 12 5 0 3 111 84 o � s 13 I o l 4 � 110 15 I 85 14 3 U o 109 86 m� 15 2 13 1 108 87 � 12 89 16 44n_ LEGEND PROP. RESIDENTIAL LUMINAIRE EXIST. RESIDENTIAL LUMINAIRE w STREET LIGHTS - PLANS FOR THE CONSTRUCTION OF WATER, 6E'l SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS SERVE WILLOW RIDGE ESTATES,PHASE 6A TEXAS REGISTERED ENGINEERING FIRM F.438 (CPN#101441) 16301 QUORUM DRIVE,SUITE 200B ADDISON,TEXAS 75001 TEL:972-248-7676 FAX:972-248-1414 APRIL 2018 — SHEET 14 I r Low I nR n PINNACLE»DKE ROAD x , n r vrHr m ozrxaeT,se a I ofineu'ra RDIX JO om.on,n o>,un,ve I y 14 ID ,r ,e 1 4 ] 4 e e 7 e e 10 11 19 v >w I m I vA < I (MIM AQ z ovwai v II 31 'm » le 17 10 to 14 le 13 H Zt Bort m I .1 o to JL- 4L " I I s e 7 e e f0 11 13 13 M 10 » 17 BLOCK ae T\ - vAT ZA T FARMS \ Bina'/ TF L CRE£H xs xa xT v x CAB.A, OE 8459 xa ,g C—K 1 RWLANE IM ,a LEGEND PROP. RESIDENTIAL LUMINAIRE EXIST. RESIDENTIAL LUMINAIRE w �._E: —30', STREET LIGHTS P:_,ANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS SERVE WILLOW RIDGE ESTATES,PHASE 6B TEXAS REGIS'T'ERED ENGINEERING FIRM F-4438 (CPN#101441) 16301 QUORUM DRIVE,SUITE 2008 ADDISON,TEXAS 75001 TEL:972-248-7676 FO:972-248-1414 APRIL 2018 — SHEET 15 40' EAGLE MOUNTAIN PIPELINE COMPANY, L.P. RIGHT-OF-WAY AGREEMENT EASEMENT DOC. NO. D2D5359730 116 115 I 9 8 81 80 79 114 I I 10 7 DRIVE J 82 TwINIF 113 11 6 83 112 I 1 5 8 0 12 WILLCW RIDGE ESTATES ;0 3 111 84 DOC NO. 2141 2817 o s 13 I ( 4 cn 11015 3 85 2 WILLO RIDGE ES 14 3 �^ PHASE NE, SECTI N ONE 3 CAB. A, SLIDE 1 238 a o 109 1q 2 86 � 15 = 13 1 108 87 \ 12 89 16 88 \ TO STOP 11 LEG` PROP. SIGN BLADES (TO BE PROVIDED BY DEVELOPER) TO PROP. STOP SIGN R STREET SIGNS PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS 681 TO SERV E `�•��� WILLOW RIDGE ESTATES,PHASE 6A TEXAS REGISTERED ENGINEERING FIRM F-438 (CPN#101441) 16301 QUORUM DRNE,SUITE 2008 ADDISON,TEXAS 75001 TEL:972-248-7676 FAX:972-248-1414 APRIL 2018 - SHEET 16 ] LLDW IDGE TATES D N D'2117- 21 R1 070882] ® v I POOL*=FaDGE ROAD " o r *LNi NE.—`719, s s no, 7■»«3D(IMI AQm / - 9 111 fs]I T� ,l 24 STP n I ,z � Wip .va >, ao » n tags ,■ ,e „ ,! n Dano wI I 7 L2 1! L. e 7 ■ ■ ,e Is 1� 3 ,■ I I s■rt S P 7 ■ ■ ,s n ,■ ,! U fe ,s 77 VAN A. TE645 \ t] Etra 7 i FAS L CREF]( \\ CAB. OE 8159 211 15 a IIPH yp ,s &OCK7 17 RMIM IAIE 1937 t6 LEGEND PROP. SIGN BLADE (TO BE PROVIDED BY DEVELOPER) STOP PROP. STOP SIGN <e> PROP. HORIZONTAL ALIGNMENT SIGN PROP. ADVISORY SPEED SIGN w -'j STREET SIGNS PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & dB- ' •. DRAINAGE IMPROVEMENTS TO SERVE WILLOW RIDGE ESTATES,PHASE 613 TEXAS REGISTERED ENGINEERING FIRM F-438 (CPN#101441) 16301 QUORUM DRNE,SUITE 2008 ADDISON,TEXAS75001 TEL:972-248-7676 FAX:972-248-1414 APRIL 2018 - SHEET 17 I