FORT WORTHo. CitY of Fort worth
Construction Allowance Request Approval
(Construction Allowance Breakdown Available
in Links)
For Construction Allowance Submittal 1 rev
No..
Construction Allowance Request CAAppr-04
Approval No.:
Date Started: 2018-07-30 Date Due: 2018-09-18
City Sec. No.: 49323
Project Name: 01549 - Greenfield Acres Drainage Improvements
Project 01549 DOE Numbers:
Numbers:
Project Drainage improvements in Greenfield Acres neighborhood
Description:
Project/Contract
Compliance Steven E. Eubanks City Inspector: Matina Salinas
Manager:
Contractor: Woody Contractors, Inc.
COST AND DAYS SUMMARY:
Requested
Department: Cost($) Fund Account Center: Days:
TPW Storm $ 121,722.25 59651-0200431-5740010-C01549-0 0
Total Cost: $ 121,722.25 Total Requested Days: 0
Approval Status:
01�140
1�40�Q OFFICIAL RECORD
c�ryI,;4Zq,���y9 CITY SECRETARY
FT. WORTH,TX
-- - ------- - ----- ----- ----- - --- - - - -- -
Approved: Yes
Comments:
User: Linda S. Young
Date: 2018-07-30 6:05 PM
Approved: Yes
Comments:
User: Ricardo Matute
Date: 2018-07-30 2:58 PM
Approved: Yes
Comments:
User: Doug Wiersig
Date: 2018-07-30 3:28 PM
Approved: Yes
Comments:
User: Doug Black
Date: 2018-07-30 9:53 PM
RT.
nested y
Approved: Yes :•_
Comments:
User: Susan Alanis '
Date: 2018-07-31 8:42 AM Mary J. Kay r, ity Secretary *`•
TEA .=
Action Required: Please review and approve.
OFFICIAL RECORD
CITY SECRETARY
FT WORTH,TX
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
�- ame of Employee/Sig"nAture
Title
❑ This form is N/A as No City Funds are associated with this Contract
Printed Name Signature
OFFICIAL RECORD
CITY SECRETARY
FT WORTH,TX
FORT WORTH- City of Fort Worth
r Construction Allowance Request Breakdown
Construction CA# CA-#1 rev. Date 1 7/30/2018 City Sec# 1 49323
Client Project#(s)l 01549
FAC#(s)J 59651-0200431-5740010-C01549-002880
Project Name Greenfield Acres Neighborhood Drainage Improvements
Description
Contractorl Woody Contractors, Inc. City Inspector Martina Salinas
Funding TPW WATER SEWER Contract Time
Allocation Account Totals (WD)
Original Contract Amount $2,764,802.70 $431,736.50 $977,670.00 $4,174,209.20
Extras to Date $499,953.70 $499,953.70
Credits to Date
Current Contract Amount $3,264,756.40 $431,736.50 $977,670.00 $4,674,162.90
Amount of Proposed Allocation $121,722.25 $0.00 $0.00 $121,722.25
Original Allowance Available for Allocation $150,000.00 $30,000.00 $40,000.00 $220,000.00
Allowance Funds Previously Allocated
Remaining Funds Available for this Allocation $150,000.00 $30,000.00 $40,000.00 $220,000.00
JUSTIFICATION SUMMARY
IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL:Furnish all labor and material
as per attached proposed Construction Allowance Request(with attachments)to the Construction Allowance Request:(Item 86)Additional
over-excavation of the hard bedrock to provide additional rooting depth for grass. (Item 87)Addition of sandy clay under topsoil to provide
better bond to hard bedrock. (Item 88)Statewide expiration of the TPDES General Permits required renewal,including new fee and permit
signatures. (Item 89)Cudex turf-reinforcing mat(TRM)system added to ensure better stability of detention basin embankment. (Item 90)
Permanent solar-powered drip irrigation system is added to ensure trees root systems are well established over several years. (Item 91)Post-
construction television of storm drains recently added as standard and was added to provide better quality control. (Item 92)Additional weep
holes were added after headwall poured based on recommendations that TxDOT retaining wall standards were not adequate in this
application.
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and
represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request.Contract Time will be adjusted on the
basis of the time shown on this Construction Allowance Request by a later Change Order,if necessary.
FORT WORTH. City of Fort Worth
Construction Allowance Request Breakdown
Construction FOA# I CA41 rev. Date 7/30/2018 City Sec# 49323
Client Project#(s) 01549
FAC#(s) 59651-0200431-5740010-C01549-002880
Project Name Greenfield Acres Neighborhood Drainage Improvements
Description
Contractorl Woody Contractors,Inc. City Inspector Martina Salinas
ADDITIONS
ITEM 7TSCRIPTION DepVFAC Qty Unit Unit Cost Total
87 "EXTRA ANDY LAY IL TPW 1,280.00 Y 20.00
TPDES GENERAL PERMIT RENEWAL TPW 1.00 L 1,500.00
89--CURLEX BLANKET WITH SEEDING TPW 16,535.00 Y 2.55
PERM.IRRIGATION FOR TREES PW 1. LS19,5
91 POST TV STORM TPW 3,674.00 LF
92 INSTALL WEEP HOLES INCLUDING ORES PW 1.0 LS 5 .0
TPW $121,722.25
WATER $0.00
SEWER $0.00
Sub total Additions121,722.25
Change Order Additions Page 2 of 4
FORT WORTH,. City of Fort Worth
Construction Allowance Request Breakdown
Construction FOA# I CA-#1 rev. J Date 7/30/2018 City Sec# 49323
Client Project#(s)F01 549
FAC#(s) 59651-0200431-5740010-C01549-002880
Project Name Greenfield Acres Neighborhood Drainage Improvements
Description
Contractorl Woody Contractors,Inc. City Inspector Martina Salinas
CONSTRUCTION ALLOWANCE ITEMS TO BE REDUCED
ITEM DESCRIHTION Dept/FAC ty U nit Unit Cost Toota
9999.0003 Construction Allowance
TPW $0.00
WATER $0.00
SEWER $0.00
bub Total Deletions 00
Change Order Deletions Page 8 of 4
MIWBE Breakdown for this Construction Allowance RegUeSt
MWBE Sub f v -:?of Service Amount for this FOA
N/A
Total $0.00
Previous Construction Allowance Requests
CO# DATE AMOUNT
Total $0.00