HomeMy WebLinkAboutContract 49323-AR3 CITY SECRETARY
coNTRAcT No. g3a3
FORT WORTH, City of Fort Worth
Construction Allowance Request Breakdown
Construction CA# Date 2/5/2019 CitySec# 1 49323
Client Project#(s) C01549
FAC#(s) 59607-0700430-5740010-001549-001783
Project Name Greenfield Acres Neighborhood Drainage Improvements
Description
Contractor Woody Contractors, Inc. City Inspector Martina Salinas
Funding TPW STORM WATER Sanitary Sewer Contract Time
Allocation Account AND PAVING Totals D
Original Contract Amount $2,764,802.70 $431,736.50 $977,670.00 $4:174,209.20 548
Extras to Date $629,087.95 $629,087.95
Credits to Date $33,696.00 $33,696.00
Current Contract Amount $3,360,194.65 $431,736.50 $977,670.00 $4,769,601.15 548
Amount of Proposed Allocation $0.00 $0.00 $11,970.00 $11,970.00
Original Allowance Available for Allocation $150,000.00 $30,000.00 $40,000.00 $220,000.00
Allowance Funds Previously Allocated $150,000.00 $0.00 $1,954.50 $151,954.50
Remaining Funds Available for this Allocation $30,000.00 $38,045.50 $68,045.50
JUSTIFICATION SUMMARY
IN ACCORt ANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL;Fumish all labor @M material
as per attached proposed Construction Allowance Request(with attachments):Sanitary Sewer Item 36:Due to changes in Water Department
specifications since the project was bid, Raven Lining Systems Epoxy Manhole Liner has been changed to Warren Coatings Epoxy Manhole
Liner on all projects. The Contractor received a quote of$220NF(vertical feet),plus testing costs,for Warren vs.the bid price of$160NF for
Raven. Pay Item 36 is added to reflect a$70NF cost difference between the product bid and the product now required. There are 171 VF
total of manhole depth to be lined_
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and
represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request Contract Time will be adjusted on
the basis of the time shown on this Construction Allowance Request by a later Change Order,if necessary.
TPW Project Maanaggr l Date Water Engineering(JK) Date
)� 0
-�A- �'-4 � 70q"'�
Wat r Engineering (TS) Date birector, Water Date
Assistant City Attorney Date Assistant City Manager Date
oe
REM\/
MAR 13 2019 A g�by; o.p OFFICIAL RECORD
x. O�: ''
crryOFForF } ;Z ` CITY SECRETARY
cINSECA FT. WORTH,TX
M&Y J. KaW, CAty Secretary
FORT WORTH. City of Fort Worth
V1 Construction Allowance Request Breakdown
Construction FOA# Date 21512019 City Sec# 49323
Client Project#(s)l C01549
FAC#(s)l 59607.0700430-5740010-C01549-C01783
Project Name Greenfield Acres Neighborhood Drainage Improvements
Description
Contractorl Woody Contractors,Inc. City Inspector Martina Salinas
ADDITIONS
ITEM DESCRIPTION Dept/FAC Qty Unit Unit Cost Total
36 3339.0001 Epoxy Manhole Liner SPEC CHANGE Sanitary Sewer 171.00 VF $70.00 $11,970.00
TPW STORM AND PAVING $0.00
WATER $0.00
Sanitary Sewer �$11,970.00ub Total Additions 70.00
Change Order Additions Page 2 of 4
FORT WORTH,. City of Fort Worth
Construction Allowance Request Breakdown
Construction FOA# 3 Date 21512019 City Sec# F 49323
Client Project#(s) C01549
FAC#IS)J 59607-0700430-5740010-C01549-C01783
Project Name Greenfield Acres Neighborhood Drainage Improvements
Description
Contractorl Woody Contractors,Inc. City Inspector Martina Salinas
CONSTRUCTION ALLOWANCE ITEMS TO BE REDUCED
ITEM DESCRIPTION Dept/FAC Qty Unit Unit Cost Total
36 9999.0003 Construction Allowance Sanitary Sewer 11,970.00000000 EA $1.00 $11,970.00
TPW STORM AND PAVING $0.00
WATER $0.00
Sanitary Sewer $11,970.00
Sub Total Deletions $11,970.00
Change Order Deletions Page 3 of 4
M/WBE Breakdown for this Construction Allowance Request
MWBE Sub Type of Service Amount for this FOA
DFW Infrastructure Epoxy lining of manholes $11,485.00
Total $11,485.00
Previous Construction Allowance Requests
CO# DATE AMOUNT
N/A
Total $0.00
81`
P0 &,.7141
fl`iFF-ASTRi_; RE IiIC.'.. rrcrtr Fx ?n 11
Revised February 22, 2019
TO: Trent Woody, Woody Contractors, 650 Tower Drive, Kennedale,
TX 76060
Project: Epoxy Manhole Liner for New Sewer Manholes installed on
Greenfield Acres Neighborhood Drainage Improvements
Bid 3/16/17
We propose to supply all labor and material to complete the work
described below. This proposal is per unit and bid reflects work
being bid in its entirety per unit . :
SCOPE & PRICING:
Apply Warren Environmental System 100% Solids Epoxy Coating to the
interior of the new sewer manhole structures . Price includes
preparation of the surface and application of a minimum 125 mils
thickness per the specification SECTION 33 39 60 Concrete Coating
System.
Bid EST. EXTENDED
ITEM ITEM DESCRIPTION Oar UNIT UNIT PRICE PRICE
NO.
SEWER BASE BID
3339 0001 4' Dia Epoxy Manhole 171 VF $220 . 00 $37 , 620 . 00
Liner (13 manholes)
Installation of 100% Solids Epoxy
Interior Coating (minimum average
thickness 125 mils)
Adhesion Testing for Warren Epoxy 49 EA $25 . 00 1, 225 . 00
Lining. One pull test per MH
included into above price . New
Requirement adds 3-4 pulls per
MH.
TOTAL PROPOSAL AMOUNT $38, 845 . 00
DFW Infrastructure, Inc. is certified with NCTRCA as DBE, Small Business and Woman Owned Business!
'If flow can't be plugged for 10 hours we will coat from mh ring down to the flow in the pipe invert channel.
Product Warranty is included from the manufacturer. 0
Epoxy prices include mobilization,and preparation of the structure. o V
a
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
amnit;��11'sll
Name of Employee/SidnAure
✓1G1
Title
❑ This form is N/A as No City Funds are associated with this Contract
Printed Name Signature
OFFICIAL RECORD
CITY SECRETARY