Loading...
HomeMy WebLinkAboutContract 50779-CO2 CITY SECRETARY FORTWORTH. City of Fort Worth %,owmaNo.�5077 -CDo� —�� Change Order Request Project Namel PEDESTRIAN SW SEMINARY&CAMPUS DRIVE City Sec# 1 50779 Client Project#(s)l 100637 P!o!ed sidewalks aqnd ADA ramps construollon at Seminary Dr.and Campus Dr. Description Contractorl ARREGUIN GROUP Change Order# L�J Date 718!2019 City Project Mgr. Maged M City Inspector Adilda Cazoda Dept. TPW Contract Time Totals D Original Contract Amount $559,878.25 $559,878.25 180 Extras to Date $58,373.28 $58,373.28 Credits to Date $40,979.16 $40,979.16 Pending Change Orders(in M&C Process) Contract Cost to Date $577,272.37 $577,272.37 180 Amount of Proposed Change Order $25,663.58 $25,663.58 15 Revised Contract Amount $602,935.95 $602,935.95 195 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) $25,66&58 $25,663.58 CHANGE ORDERS to DATE pNCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT ab I MAXALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $699,847,81 This change order is needed to add a bid item to teardown an existing brick retaining wall and reinstall utilizing the same material,due to path of work.also to add bid items to install underground pipes to collect all the water seepage at the back of the sidewalk due to the slope of the soil in this area.The unit cost for drainage solution includes,3'and 1.5'dia PVC pipe,gravel,filter fabric and labor cost to install,Also this change order is needed to add a bid item for curb reapir in case we will need when we will far the underdarin pipe into the exisitng curb.Also to add a bid item for insurance policy in order to allow the contractor to sign the agreement with UPPR to construct the the sidewalk under the railraod bridge at Seminary Dr. �- �':, 1e�F? A by. /'A' 0� ;; SYS i S ,� It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an adeprid a n and presents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Prose signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including erisunng all performance and reporting requirements. ARREGUIN GROUP til �`eCt6if5 "ft; ' �#Y _. Date Pry ec Man /Pr rain �t er e' Assistant.1reo#ar: De '., .,� _ ._ �`= Date Dir rrtractin De rime (Dept) D to Date ant Mana ager Q to ti Atf�uC ? It It M12AC Number M&C Date Approved t� RECEIVED MAR 13 2019 Change Order Additions Page 1 of 4 FT. WORTH,TX CORD rr�r�rtvaRrH TARY ,�`rar,, fokrwowrH City of Fort Worth Change Order Additions Project Name PEDESTRIAN SW SEMINARY&CAMPUS DRIVE City Sec# 50779 Client Project# 100637 Project Description sidewalks acrid ADA ramps construction at Seminary Dr.and Campus Dr. Contractor ARREGUIN GROUP Change Order# 0 Date 218/2019 City Project Mgr. Maged Zaki City Inspector Adilda Cazorla ADDITIONS ITEM DESURIP I)ON DEPT UtyUnit Unitos o a 5 5T—1.5" PIPE INSTALLED FOR DRAINAGE,AS NEEDEL 777- 55 Insurance policy TPW $25,663.58 Sub ota itions Change Order Additions Page 2 of 4 FOR-I-VVOKrti City of Fort Worth -- Change Order Deletions Project Name PEDESTRIAN SW SEMINARY&CAMPUS DRIVE City Sec# 50779 Client Project# 100637 Project Description sidewalks agnd ADA ramps construction at Seminary Dr.and Campus Dr. Contractor ARREGUIN GROUP Change Order# Date 28/2019 City Project Mgr. Maged Zaki City Inspector Adilda Cazorla DELETIONS y Unit Units o a TPW $0.00 Sub ota Deletions Change Order Additions Page 3 of 4 MIWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO N/A Total $0.00 Previous Change Orders CO# DATE AMOUNT None Total $0.00 Change Order Additions Page 4 of 4 Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting require . 9 Maged Zaki Project Manager OFFICIAL RECORD CITY SECRETARY FT. WORTH T