Loading...
HomeMy WebLinkAboutContract 50315-AR1 CITY SECRETARY FORT City Y of Fort Worth CONTRACT NO. .5�315->�tZi Construction Allowance Request Construction FOA# 14 Z. Date 12/26/2018 City Sec# 1 50315--1 Client Project#(s) 100637 FAC#(s)l 33005-0200431-5740010-100637-003880-9999 Project NaPedestrain Sidewalks with ADA curb ramps along John T White Rd,Medical Dr&Sartain Dr PDw ra Contractorl Northstar Construction LLC City Inspector Travis Overstreet Funding TPW Select Day Type Allocation Account Totals Original Contract Amount $534,777.00 $534,777.00 180 Extras to Date $121,674.60 $121,674.60 Credits to Date Current Contract Amount $656,451.60 $656,451.60 180 Amount of Proposed Allocation $3,268.00 $3,268.00 Original Allowance Available for Allocation $20,000.00 $20,000.00 Allowance Funds Previously Allocated 7 -4- - Remaining Funds Available for this Allocation $20,000.00 $20,000.00 IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL:Furnish all labor and material as per attached proposed Construction Allowance Request(with attachments)to the Construction Allowance Request:due to bad condition of the existing soil,contractor has been asked to replace 1'depth x 6'width x 171'lenght. OF F0& Attested by* T%%0 M . Kayno Sere _ Mary tart' It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request.Contract Time will be adjusted on the basis of the time shown on this Construction Allowance Request by a later Change Order,if necessary. �Co l ct s :e re.;agrttative._ _ _ .__- ._.___ _ Da :; __ Contractor tNa e) 1�ale, 31/Ll 9 Luke Heimlich Ptp ect Ml _;_fir .. _w _: _ . Le;n_ P':. ram Mara. er^ tate. 36 _ Asslstarrt Director t _ Datev D'► or,10ontractinp2e e3nt t Assisi Date - 4ac, t L t OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX i FORT WORTH® City of Fort Worth Construction Allowance Request Construction FOA# Date 12/26/2018 City Sec# 50315 Client Project#(s)l 100637 FAC#(s)l 33005-0200431-5740010-100637-003880-9999 Project Name Pedestrain Sidewalks with ADA curb ramps along John T White Rd,Medical Dr&Sartain Dr Description Contractorl Northstar Construction LLC City Inspector Travis Overstreet DETAILED JUSTIFICATION! FOR CONSTRUCTION FIELD ORDER ALLOYVANCE IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL:Furnish all labor and material as per attached proposed Construction Allowance Request(with attachments)to the Construction Allowance Request:due to bad condition of the existing soil,contractor has been asked to replace 1'depth x 6'width x 171'lenght. FORT WORTH, City of Fort Worth Construction Allowance Request Construction FOA# Date 12/26/2018 City Sec# 50315 Client Project#(s) 100637 FAC#(s)l 33005-0200431-5740010-100637-003880-9999 Project Name Pedestrain Sidewalks with ADA curb ramps along John T White Rd,Medical Dr&Sartain Dr Description Contractorl Northstar Construction LLC City Inspector Travis Overstreet ADDITIONS Dept/FAC Qty Unit Unit CostTotal 77=mbankment by Plan TPW 3,268.00 Sub Total Additions 3,268.00 Change Order Additions Page 1 of 1 FORT WORTH City of Fort Worth Construction Allowance Request Construction FOA# Date 12/26/2018 City Sec# 50315 Client Project#(s) 100637 FAC#(s) 33005-0200431-5740010-100637-003880-9999 Project Name Pedestrain Sidewalks with ADA curb ramps along John T White Rd,Medical Dr&Sartain Dr Description Contractorl Northstar Construction LLC City Inspector Travis Overstreet CONSTRUCTION ALLOWANCE ITEMS TO BE REDUCED Dept/FAC Unit Unit os o a TPW 0.00 Sub Total DeFetions Change Order Deletions Page 1 of 1 MMBE Breakdown for this Construction Allowance Request MWBE Sub Type of Service Amount for this FOA Total $0.00 Previous Construction Allowance Requests CO# DATE AMOUNT Total $0.00 Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Maged Zaki Project Manager OFFICIAL RECORD CITY SECRETARY FT. INQRTF�y TX