Construction Allowance Request
Construction FOA# 14 Z. Date 12/26/2018 City Sec# 1 50315--1
Client Project#(s) 100637
FAC#(s)l 33005-0200431-5740010-100637-003880-9999
Project NaPedestrain Sidewalks with ADA curb ramps along John T White Rd,Medical Dr&Sartain Dr
PDw
ra
Contractorl Northstar Construction LLC City Inspector Travis Overstreet
Funding TPW Select Day Type
Allocation Account Totals
Original Contract Amount $534,777.00 $534,777.00 180
Extras to Date $121,674.60 $121,674.60
Credits to Date
Current Contract Amount $656,451.60 $656,451.60 180
Amount of Proposed Allocation $3,268.00 $3,268.00
Original Allowance Available for Allocation $20,000.00 $20,000.00
Allowance Funds Previously Allocated 7 -4- -
Remaining Funds Available for this Allocation $20,000.00 $20,000.00
IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL:Furnish all labor and
material as per attached proposed Construction Allowance Request(with attachments)to the Construction Allowance Request:due to bad
condition of the existing soil,contractor has been asked to replace 1'depth x 6'width x 171'lenght.
OF F0&
Attested by* T%%0
M . Kayno Sere _
Mary tart'
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and
represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request.Contract Time will be adjusted on
the basis of the time shown on this Construction Allowance Request by a later Change Order,if necessary.
�Co l ct s :e re.;agrttative._ _ _ .__- ._.___ _ Da :; __ Contractor tNa e) 1�ale,
31/Ll 9 Luke Heimlich
Ptp ect Ml _;_fir .. _w _: _ . Le;n_ P':. ram Mara. er^ tate.
36 _
Asslstarrt Director t _ Datev D'► or,10ontractinp2e e3nt t
Assisi Date -
4ac, t L t
OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,TX i
FORT WORTH® City of Fort Worth
Construction Allowance Request
Construction FOA# Date 12/26/2018 City Sec# 50315
Client Project#(s)l 100637
FAC#(s)l 33005-0200431-5740010-100637-003880-9999
Project Name Pedestrain Sidewalks with ADA curb ramps along John T White Rd,Medical Dr&Sartain Dr
Description
Contractorl Northstar Construction LLC City Inspector Travis Overstreet
DETAILED JUSTIFICATION! FOR CONSTRUCTION FIELD ORDER ALLOYVANCE
IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL:Furnish all labor and material
as per attached proposed Construction Allowance Request(with attachments)to the Construction Allowance Request:due to bad condition of the
existing soil,contractor has been asked to replace 1'depth x 6'width x 171'lenght.
FORT WORTH, City of Fort Worth
Construction Allowance Request
Construction FOA# Date 12/26/2018 City Sec# 50315
Client Project#(s) 100637
FAC#(s)l 33005-0200431-5740010-100637-003880-9999
Project Name Pedestrain Sidewalks with ADA curb ramps along John T White Rd,Medical Dr&Sartain Dr
Description
Contractorl Northstar Construction LLC City Inspector Travis Overstreet
ADDITIONS
Dept/FAC Qty Unit Unit CostTotal
77=mbankment by Plan
TPW 3,268.00
Sub Total Additions 3,268.00
Change Order Additions Page 1 of 1
FORT WORTH City of Fort Worth
Construction Allowance Request
Construction FOA# Date 12/26/2018 City Sec# 50315
Client Project#(s) 100637
FAC#(s) 33005-0200431-5740010-100637-003880-9999
Project Name Pedestrain Sidewalks with ADA curb ramps along John T White Rd,Medical Dr&Sartain Dr
Description
Contractorl Northstar Construction LLC City Inspector Travis Overstreet
CONSTRUCTION ALLOWANCE ITEMS TO BE REDUCED
Dept/FAC Unit Unit os o a
TPW 0.00
Sub Total DeFetions
Change Order Deletions Page 1 of 1
MMBE Breakdown for this Construction Allowance Request
MWBE Sub Type of Service Amount for this FOA
Total $0.00
Previous Construction Allowance Requests
CO# DATE AMOUNT
Total $0.00
Contract Compliance Manager:
By signing, I acknowledge that I am
the person responsible for the
monitoring and administration of this
contract, including ensuring all
performance and reporting
requirements.
Maged Zaki
Project Manager