HomeMy WebLinkAboutContract 52064 Received Date: 03/19/19
Received Time: 1:37 PM
Yania Soto Na.19,2019)
Developer and Project Information Cover Sheet:
Developer Company Name: Hillwood Alliance Services,LLC
Address, State,Zip Code: 9800 Hillwood Pkwy Suite
Phone&Email: 817-224-6000,craig.schkadeahillwood.com
Authorized Signatory,Title: L.Russel Laughlin ,Executive Vice President Properties Division
Project Name: Alliance Town Center North—Expedition Way
Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights
Project Location: South of Golden Triangle between I-35W and Founders Way
Plat Case Number: FP18-108 Plat Name: Alliance Town Center North
Mapsco: Council District: 4
CFA Number: CFA18-0152 City Project Number: 101807
City of Fort Worth,Texas
Standard Community Facilities Agreement-Alliance Town Center North—Expedition Way OFFICIAL RECORD
CFA Official Release Date:02.20.2017
Page 1 of 11 CITY SECRETARY
FT WORTH,TX
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Car tract No. 52064
WHEREAS, Hillwood Alliance Services, LLC , ("Developer"), desires to make certain
specific improvements as described below and on the exhibits attached hereto ("Improvements")
related to a project generally described as Alliance Town Center North — Expedition Way
("Project")within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project;and
WHEREAS,any future City participation in this CFA is subject to the availability of City
funds and approval by the Fort Worth City Council and shall be memorialized as an amendment
to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW,THEREFORE,for and in consideration of the covenants and conditions contained
herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated
into this Agreement as if copied herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and obligations hereunder and to
cause all contractors hired by Developer to comply with the Policy in connection with the
work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Alliance Town Center North—Expedition Way OFFICIAL RECORD
CFA Official Release Date:02.20.2017
Page 2 of 11 aw SECRETARY
FT,, WORTH, rX
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by Developer
for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike manner
and in accordance with all City standards and the City-approved construction plans,
specifications and cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) ®, Sewer(A-1) ®,Paving (B) ®, Storm Drain(B-1) ®, Street Lights & Signs
(C) M.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered
in conformance with paragraph 8, Section 11, of the Policy. Developer shall ensure its
contractor(s)pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed and
bonded to do work in public ways and/or prequalified to perform water/wastewater
construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the City
for one hundred percent (100%) of the contract price of the infrastructure for a
period of two (2) years from the date of final acceptance insuring the maintenance
and repair of the constructed infrastructure during the term of the maintenance
bond. All bonds to be furnished before work is commenced and to meet the
requirements of Chapter 2253, Texas Government Code.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Alliance Town Center North—Expedition Way
CFA Official Release Date:02.20.2017
Page 3 of 11
iii. To require the contractor(s)it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer-awarded
infrastructure construction contracts. The City shall be named as additional insured
on all insurance required by said documents and same will be evidenced on the
Certificate of Insurance (ACORD or other state-approved form) supplied by the
contractor's insurance provider and bound in the construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available;to require the contractor to allow the construction to be
subject to inspection at any and all times by City inspection forces,to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to proceed, and to make such laboratory
tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service Lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community facilities
to be installed hereunder.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Alliance Town Center North—Exped!tion Way
CFA Official Release Date:02.20.2017
Page 4 of 11
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans,specifications and cost estimates supplied
by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements across
property owned by Developer and required for the construction of the current and future
improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits,actions or claims of any character,whether real or asserted, brought for
or on account of any injuries or damages sustained by any persons (including death)
or to any property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said Developer, its
contractors, subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or damages are
caused, in whole or in Part, by the allered nezlizence of the City of Fort Worth, its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from,or in any way connected with,the construction of the infrastructure contemplated
herein,whether or not such injuries, death or damages are caused, in whole or in part,
by the alleged negligence of the City of Fort Worth, its of leers, servants, or employees.
Further,Developer will require its contractors to indemnify, and hold harmless the City
for any losses, damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the improvements in a good
and workmanlike manner, free from defects, in conformance with the Policy, and in
accordance with all plans and specifications.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Alliance Town Center North—Expedition Way
CFA Official Release Date:02.20.2017
Page 5 of 11
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assigrunent of all warranties given by the
contractor, whether express or implied. Further,Developer agrees that all contracts with any
contractor shall include provisions granting to the City the right to enforce such contracts as
an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent(2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent(2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing
the streetlights, inspection fees equal to four percent (4%) of the developer's share
of the streetlight construction cost as stated in the construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements v;ithin two (2) years, provided,
however, if construction of the Improvements has started within the two year
period,the developer may request that the CFA be extended for one additional year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
the end of two(2)years from the date of this Agreement(and any extension period)
the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to ause the payment of costs for
City of Fort Worth,Texas
Standard Community Facilities Agreement-Alliance Town Center North—Expedition Way
CFA Official Release Date:02.20.2017
Page 6 of 11
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government
Code,the City is prohibited from entering into a contract with a company for goods or services
unless the contract contains a written verification from the company that it: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms
"boycott Israel" and "company" shall have the meanings ascribed to those terms in Section
808.001 of the Texas Government Code. By signing this contract, Developer certifies that
Developer's signature provides written verification to the City that Developer: (1) does not
boycott Israel; and (2)will not boycott Israel during the term of the contract.
IMMIGRATION AND NATIONALITY ACT
R. Developer shall verify the identity and employment eligibility of its employees who perform
work under this Agreement, including completing the Employment Eligibility Verification
Form (1-9). Upon request by City, Developer shall provide City with copies of all 1-9 forms
and supporting eligibility documentation for each employee who performs work under this
Agreement. Developer shall adhere to all Federal and State laws as well as establish
appropriate procedures and controls so that no services will be performed by any Developer
employee who is not legally eligible to perform such services. DEVELOPER SHALL
INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES,
LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY
DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR
LICENSEES. City, upon written notice to Developer, shall have the right to immediately
terminate this Agreement for violations of this provision by Developer.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Alliance Town Center North—Expedition Way
CFA Official Release Date:02.20.2017
Page 7 of 11
Cost Summary Sheet
Project Name: Alliance Town Center North—Expedition Way
CFA No.: CFAIS-0152 CityProject.No.: 101807
An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 34,932.00
2.Sewer Construction $ 29,242.00
Water and Sewer Construction Total $ 64,172.00
B. TPW Construction
1.Street $ 187,66, 50
2.Storm Drain $ 114,20 .00
3.Street Lights Installed by Developer $ 32,66C 00
4. Signals $
TPW Construction Cost Total $ 334,531,50
Total Construction Cost(excluding the fees): $ 398,705.50
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 1,283.48
D. Water/Sewer Material Testing Fee(2%) $ 1,283.48
Sub-Total for Water Construction Fees $ 2,566.96
E. TPW Inspection Fee(4%) $ 12,074.86
F. TPW Material Testing(2%) $ 6,037.43
G. Street Light Inspsection Cost $ 1,306.40
H. Signals Inspection Cost $ -
H. Street Signs Installation Cost $
Sub-Total for TPW Construction Fees $ 19,418.69
Total Construction Fees: $ 21,985,65
Choice
Financial Guarantee Options,choose one Amount y Mark one
Bond=100% $ 398,705.50
Completion Agreement= 100%/Holds Plat $ 398,705.50
Cash Escrow Water/Sanitary Sewer—125% $ 80,217.50
Cash Escrow Paving/Storm Drain=125% $ 418,164.38.
Letter of Credit=125%w/2yr expiration period 1 $ 498,381.88 1 x
City of Fort Worth,Texas
Standard Community Facilities Agreement-Alliance Town Center North—Expedition Way
CFA Official Release Date:02.20.2017
Page 8 of 11
ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
Hillwood Alliance Services,LLC
Jesus J.Chapa(Mar
Jesus J. Chapa
Assistant City Manager Ldjw
Date: Mar 19,2019 L.Russell Laughlihn(Mar 18'1019)
Name: L.Russel Laughlin
Recommended by: Title: Executive Vice President Properties
Division
Evelyn Robs(Mar is 0 9 Mar 18,2019
Date:
Evelyn Roberts/Jennifer Ezernack
Project Assistant
Planning and Development
Contract Compliance Manager:
By signing, I acknowledge that I am the
Approved as to Form &Legality: person responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
Richard A.McCracken(Mar 19,2019) requirements.
Richard A. McCracken
Assistant City Attorney Tame Scart&r Morales
M&C No. N/A Janie Scarlett Morales(Mar 19,2019)
Date: Name: Janie Morales
Form 1295: N/A : ..�,4 My. Title: Development Manager
g RT ��i
ATTEST:
U
Ma J. Kays&r a y
Mary J.Kayser(Mar 19,2019)
Mary J. Kayser/Ronald Gonzales `°"'C f
City Secretary/Assistant City Secretaa
City of Fort Worth,Texas OFFICIAL RECORD
Standard Community Facilities Agreement-Alliance Town Center North—Expedition Way CITY SECRETARY
CFA Official Release Date: 02.20.2017
Page 9 of 11 FT WORTH,TX
Check items associated with the project being undertaken: checked items must be
included as Attachments to this Agreement
Included Attachment
Attachment 1 -Changes to Standard Community Facilities Agreement
. Location Map
Exhibit A: Water Improvements
Exhibit A-1: Sewer Improvements
® Water and Sewer Cost Estimates
® Exhibit B: Paving Improvements
® Paving Cost Estimate
® Exhibit B-1: Storm Drain Improvenu n.ts
® Storm Drain Cost Estimate
® Exhibit C: Street Lights and Signs I-nprovements
Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left}31ank)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Alliance Town Center North—Expedition Way
CFA Official Release Date:02.20.2017
Page 10 of 11
ATTACHMENT"I"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 101 807
None.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Alliance Town Center North—Expedition Way
CFA Official Release Date:02.20.2017
Page 11 of 11
SECTION 00 42 43
PROPOSAL FORM
UNIT PRICE BID Bidder's Application
ATCN 6pederon Way-Water,Sanitary Sewer,Stoma Dmn,Paving&Seat lights
Project Item information 1lidders Proposal
&dost Item Desciaptne Specification Unit of Bad Quantity Unit Price Bid Value
No. Section No. Measaue
1 3110.0101 SiteCleanntg 311000 LS 1 S4,500.0D 54,500.00
2 3123.0103 Borrow by Plan 31 23 16 CY 2.838 $4.00 511.352.00
3 3123.0101 Unclassified Excatetion by Plan 31 23 16 CY 3,201 56.00 519,206.00
4 3125.0101 SWPPP ie 1 acre 312500 LS 1 $3,000.00 $3.000.00
Total Erdm A beip—meots $38,058.00
WAM-
Project Item lnfomation Bidders Proposal
Bglhst Item Specification Unit of
No Description Section No Measure Ikd Quanta y Una Rice &d Value
5 3311.0261 8"PVC Water Pipe 3311 12 LF 596 $40,00 523,840.00
6 33123003 B'Gate Valve 33 11 12 EA 3 $1.25000 53,750.DD
7 3312.0117 Connection to Existing 4"-12'Water Main 33 12 25 EA 2 $1,500.00 S3.000.00
8 3311.0001 Ductile Iran Water Fittings wl Restraint 33 11 11 TON 0.7 54,500.00 S3,15000
9 3305.0109 Trench Safety 33 05 10 LF 596 $2.00 $1,192.00
Total Water limprownstria $34,932.00
Project Item Inforrmtnn Bidders Proposal
Bidlist Item Description Section
Unit of Bad Quannry Unit Rice &d Value
No Section No Measure
10 3331 4115 8"Saw Pipe 33 11 10 LF 270 $5600515,120.00
11 3331.4116 8"Sewer Pipe.CSS Backfill 33 11 10,33 31 LF 20 51,320.00
12,33 31 20 S6600
12 0330.0001 Concrete Encase Sewer Pipe 033000 CY 1.36 $272.00
$200.00
13 3339.1001 4'Manhole 333910 333920 EA 2 $9.000.00
54.500.00
14 3339.1003 4'Extra Depth Manhole 33 3910,33 39 2C VF 6 $200.00 $1,20000
15 3305.0109 Trench Safety 33 05 10 LF 290 S400 S1,16000
18 3301.0002 Post4XTV Inspection 33 01 31 LF 290 5070 00
$3.00
17 3301.0101 Manhole Vacuan Testing 33 01 30 EA 2 $300.00
$150.00
Tad Ssr itary Sewer Wile amts 529,242.00
Page 2 of 6
Project hem lnfornamon Bdders proposal
Bdkst Item Dncripton Speci6calm Una of Quantey Ung Pnce Bal Value
W Section No Measure Bd
18 0241.D500 Remote Fence 02 41 13 LF 50 $4.00 $200.00
19 0241.1100 RWnote Asphalt PvM 024115 SY 1,032 $12.00 $12,364.00
20 3213 0103 8"Cone Punt 32 13 13 SY 999 $54,00 $53,946.00
21 3211.0502 8"Lime Treatment 321129 SY 1,065 $4.00 54,260.00
22 3211.0400 Hydrated Lime 32 11 29 TN 21.3 $185.00 $3,940.50
23 3212.0503 8"Asphalt Base Type B 31 1216 SY 1,029 $38.00 $39,102.00
24 3211.0502 8"Urn Treatment 321129 SY 1,070 $4.00 54,280.00
25 3211.0400 Fly Qatt I Lime 32 11 29 TN 16 5185.00 $2,960.00
26 3213.0301 4"Cone Sidewalk 321320 SF 2,314 $4.00 $9,256.00
27 9999.0001 Connect to Existing Header 000000 LF 34 S20.00 5680.00
29 3292.0400 Seeding.Hlytiontdch 329213 SY 4,038 $2.00 $8,076.00
30 9999.0005 6"CONDT PVC SCH 40 M OD 00 OD LF IDD $28.00 $2,800.00
31 9999.0004 4"COLT PVC SCH 40(T) 000000 LF IOD $20,DO $2,000.00
32 9999.00D4 2"CONDT PVC SCH 40(T) 000000 LF 50 $14.00 $700.00
33 3471.0001 Traffic Cartrol 3471 13 MO 1 51,500.00 $1,500.00
Taal Paving ktrpravements $148,084.50
Project Item Information Bidders proposal
Bdlat Item Descnptdt Specifics.on Una of Bid Qxrantm' Una Puce Bid Value
W Section No. Measure
34 3341.0205 24"RCP,Class III 334110 LF 84 $65.00 S5,460.D0
35 3341.0309 36"RCP,Class 111 33 41 10 LF 117 $105.00 512,285.00
36 3341.1102 4x3 Box Ctdtert 33 41 10 LF 111 WW 00 S22.200.00
37 9999 0003 Const(2)Cx3'%(1)4k3 Concrete Collar 000000 EA 1 $4,500.00 54,500.00
38 9999.0000 Tx DOT Std Concrete Headwall(FW-0) 000000 FA 2 $17,500.00 535.000.00
39 3349.5001 10'Cub Ina$ 334920 EA 2 53.200 00 $6,400.00
40 3137.0102 Large Stone ROW,dry 313700 SY 292 595.00 $27,740.00
41 3305.0109 Trench Safety 33 05 10 LF 312 $2.00 $624,00
TaW Stern Orr.Impr ".ts $114,209.00
Nge3of6
Protect Item Information Bdders proposal
Bulhtt Item Description Specification Una of
No, Section NoMeasure Bid Quantity Unit Pace &d Value
N .
42 3217.0002 4"SLD Punt Marking HAS(Y) 32 17 23 LF 412 $200 $824.00
43 3217.0004 4"BRK Punt Marking HAS(Y) 321723 EA 103 $2.00 $206.00
44 32171003 Lane Legend DBL Arrow 32 17 23 EA 1 $250.00 $250.00
45 3217.2103 REFL Raised Marker TY l-A-A 321723 EA 10 54.00 540.00
46 9999.0000 Install End of Roaft"'Type III Barricade 000000 LF 34 $50.00 $1,700.00
47 9999.0001 Rernow Type III Barricade 10000 LF 50 $10.00 $500.00
Total Patement Markings&Signsige 4rtpesemenu $3.620.00
Protect Item Infuriation &ddees Proposal
Bulbs hem Specification Una of
No Description Section No Measure &d Quantity Una Price Bid Value
48 2605.3001 1 114"CONDT PVC SCH 80(T) 26 05 33 LF 705 $12.00 $8,460.00
49 2805.3002 1 114"CONDT PVC SCH 80(B) 260533 LF 85 $30.00 $2,550.00
50 3441.1409 NO 8 Insulated Elec Condir 344110 LF 1,170 $3.00 $3,510.00
51 3441.1410 NO 10 Insulated Elec Condr 34 41 10 LF 585 $400 $2.340.00
52 3441.1501 Ground Box Type B 3441 10 EA 2 $850.00 $1,700.00
53 3441.3022 Ornamental Aaambly,Complex 3541 10 EA 3 $3,500.00 $10,500.00
54 3441.3303 Rdwy 41um Foundalion TY 7 34 41 20 EA 3 $1,200.00 $3,600.00
Told Srseet light bales s mesta $32,680.00
Earthwork Improvements $38.058.00
W atw lmgrovements $34,932.00
Sanaery Se..erhrpm%emeras $29,242.00
Paving Irtprovemmts 5146 084.50
Srorm Drax Improveaents $114,209.00
Pavement Marking&Signage Improvements $3,520,00
Street Lght Improvements $32,660.00
Total B $398,70^5.50
Page 4 of 6
J
SITE
0� GOLDEN TRIANGLE BLVD
EXPEDITION o0
WAY PRESTIGE p0�
ROAD &5z O
�0
wZ
-w
�o
Mo
Q- HERIT GE
Z TRACE P 377
U)
ft
cD w
ff Z
W J
287 a
w
LL
NORTH TARRANT
PARKWAY
co
U
�y� ¢
�WLvel4LL! m U
® Z I
�I
3
N
�I
3
I
w
I
3
x
a
U
U_
E
U
O
-------------------- dl
ENGINEER: y
OWNER/ DEVELOPER: ,
EXPEDITION WAY HILLWOOD ALLIANCE PEL�OTON ml
NORTH ALLIANCE TOWN CENTER NORTH SERVICES, LLC 9800 HILLWOOD PARKWAY 3
NOT TO SCALE 9800 HILLWOOD PARKWAY,SUITE 300 SUITE 250 =
FORT WORTH,TEXAS 76177 FORT WORTH,TX 76177
DATE:OCTOBER 2018 PHONE: (817) 224-6000 PHONE:817-562-3350
" •GOLDEN'TRI`ANGE
BOULEVARD
JGL ATC NORTH RACETRAC PETROLEUM,INC. AIL INVESTMENT,L.P.
.� No.1,LTD. INST.#D215035449 - VOL.14315,PG.56
Q INSTC.R T1C T4733 C.R.T.C.T. C.R.T.C.T.
EX 8"GATE
�o VALVE
EX 8"GATE EXIST FIRE
?Q
8"GATE VALVE HYDRANT
VALVE EXPEDITION -
:0 AY O .
8„WL
(I EX 8"WL EX 8"GATE
8"WL VALVE
AIL INVESTMENT,L.P. 8"WL AIL INVESTMENT,L.P.
(TRACT 11 / TEXAS HEALTH RESOURCES
VOL.14315,11�.56 8"GATE VOL.14315,PG.56 INST.#D209326416
r C.R.T.:.T. VALVE C.R.T.C.T. C.R.T.C.T.
I •• EX 12"GATE
EX 12"WL VALVE
8"WL
' •;I EX 12"GATE
VALVE
AIL INVESTMENT,L.P-
VOL.14315,PG.56 E}12"GATE
C.R.T.C.T. 'VA LVE
EX 8"WL
:
LEGEND
PROPOSED WATER LINE N
EXIST WATER LINE E
i
#- PROPOSED FIRE HYDRANT
. a
U
-C�- EXIST FIRE HYDRANT
' U
H PROPOSED GATE VALVE
D4 EXIST GATE VALVE
U
p
EXHIBIT A — WATER
=----------------------------------------------------------------------------------------- - ------------ --------------- --------------
OWNE1 z / DEVELOPER: li'91 PELOTON
NORTH 2O0. EXPEDITION WAY HILLWOODALLIANCE �� �•Me ,o��T,oM,
SERVICES, LLC 9800 HILLWOOD PARKWAY
ALLIANCE TOWN CENTER NORTH 9800 HILLWOOD PARKWAY,SUITE 300 SUITE FORT WORTH TX 76177 m
FORT WORTH,TEXAS 76177 PHONE:817-562-3350 °
GRAPHIC SCALE DATE:DECEMBER 2018 PHONE: (817) 224-6000
---------- --------------------------------------------------------------- ------------------------ - - -- - .....-.
•GOLDEN TRtANGUE...
BOULEVARD
_-�:r _. � �.•.. a _r__•_�
Q GL ATC NORTH I ='� ��`
RACETRAC PETROLEUM,INC. - AIL INVESTMENT,L.P.
No.1,LTD. :l3•:
INST.#D215014733 INST.#D215035449 i VOL.14315,PG.56
C.R T.0 T. C.R.T.C.T. ! C.R.T.C.T.
�0) EX 10"SS
EXPEDITION
a'ssMH
No
~ WAY
#� i �. ._:,_„ ,•.�..- " .._.SEX 10"SS •-%�•
O f. /
#, � ,/.• JP /
AIL INVESTMENT,L.P. AIL INVESTMENT,L.P. •f• / TEXAS HEALTH RESOURCES
(TRACT 11 4'SS MH VOL.14375,PG.56
J VOL.14315,Pa.56 C.R.T.C.T. / INST.#D209326476
#i C.R.T.C.T. ," C.R.T.C.T.
1� � �'� •.� EX 10"SS
', _`_ ••ills ::!
I•,I :I
AIL INVESTMENT,L.P. EX 10"SS
VOL.14315,PG.56
C.R.T.C.T.
LLI
II
E
•.I
. 3
x
• 'a
LEGEND
PROPOSED SEWER LINES E
-0-- EXIST SEWER LINES
NOTE:ALL PROPOSED SANITARY SEWER
LINES ARE 8" UNLESS OTHERWISE NOTED
: a
EXHIBIT A1 - WASTEWATER
------------------------------------------------------------------------------ ------------------------------------------- -------------------
0 NORTH 200 OWNER/ DEVELOPER: 1101 PELOTON a
EXPEDITION WAY HILLWOOD ALLIANCE 1111TLAND SOLUTIONS
SERVICES, LLC 9800 HILLWOOD PARKWAY
ALLIANCE TOWN CENTER NORTH 9800 HILLWOOD PARKWAY,SUITE 300 SUITE 250 =
GRAPHIC SCALE FORT WORTH,TEXAS 76177 FORT WORTH,TX 76177 0
DATE:OCTOBER 2018
PHONE: (817) 224-6000 PHONE:817-562-3350 ,
---------------
...............GOLDEN TRIANGLE _............ .. ......... .... ...............,.... .,'� .
�....
BOULEVARD """ •••.. ,
GL ATC NORTH #`
Q: RACETRT. PETROLEUM,INC. AIL INVESTMENT,L.P.
Q. No.1,LTD. INST.#D215035449 •'�'' y VOL.14315,PG.56
INST.#D215014733 4733
• 0• - C.R.T.C.T. C.R.T.C.T.
C.R.T.C.T.
co - I
EXPEDITION C,
.. .,. WAY..... ...; .•�:. ���••',�
ZIL INESTMENTL .
35� B-U /50' ROW AVOLV14315,PG.56P TEXAS HEALTH RESOURCES
C.R.T.C.T. INST.#D209326476
•'�• C.R.T.C.T.
AIL INVESTMENT,L.P.
(TRACT 11)
7**
VOL.14315,PG.56
C.R.T.C.T,
O �O
AIL INVESTMENT,L.P.
VOL.14315,PG.56
C.R.T.C.T.
d
U�
y
�I
�I
' 3
i
. E
a
LEGEND
. Q
. LL
PROPOSED CONCRETE PAVEMENT
U
• E
�- SIDEWALK
' U
p
EXHIBIT B - PAVING
-------------------------- -------------
OWNI_R / DEVELOPER: 1101 PELOTON E
NORTH 200, EXPEDITION WAY HILLV,,'OOD ALLIANCE ��
p LAND ■OLOTION.
SE (VICES, LLC 9800 HILLWOOD PARKWAY
ALLIANCE TOWN CENTER NORTH 9800 HILL`/JOODPARKWAY,SUITE 300 SUITE 250 =
FOR PHCINE: (817) 224-6000WORTH,TEXAS 76177 FORT WORTH,TX 76177 0
PHONE:817-562-3350 3
GRAPHIC SCALE DATE:DECEMBER 2018 5
7;
t
1
.. .. r..>. ... . .... .....r 11 4e ,
.....GOLDEN'TMANGL.E....
"""'EX42"RCS
•�r
.r�.rrrr
rr
BOULEVARD
•
.. _:.:.,._.e.....:._. _,.„-_,_..ate_:_...p„„_ ^._ ,• ..
.3
t
• Q GL ATC NORTH RACETRAC PETROLEUM,INC. .f / AIL INVESTMENT,L.P.
Q No.1,LTD. INST.#D215035449 ••• �. / VOL.14315,PG.56
p
IT.#D215014733 C.R.T.C.T. —/ C.R.T.C.T.
•
C.R.T.C.T.
w
�Q
4'x 3'RCB 36”RCP ( ' '`•' �� _
24"RCP EXPEDITION WAY
2 ;r
4'x 3'RCB 24 RCP ; ' Jam' .f /
_'� Q 2•.,> EX 42"RCP
AIL INVESTMENT),L.P. 24"RCP AIL INVESTMENT,L.P. TEXAS HEALTH RESOURCES
VOL
(TRACT
11) 5fi 24"RCP VOL.14315,PG.56 •r £ / INST.#D209326476
%t C.R T.C.T. C.R.T.C.T. ��'--� C.R.T.C.T.
EX 24"RCP 1 f., �f•
EX 24" RCP
AIL INVESTMENT,L.P.
VOL.14315,PG.5fi
C.R.T.C.T.
EX 21"RCP
: Q
UI
• N
�I
N
I
3i
• E
N
I
LEGEND 3
uU
PROPOSED STORM DRAIN INLET
U
�- PROPOSED SLOPED HEADWALL
�--- PROPOSED STORM DRAIN DROP INLETzi
EXHIBIT B1 - STORM DRAINAGE
=------------------------------------------------------------------------------- ---------------------------------------------------------
2
OWNER / DEVELOPER: ;;??I PELOTON
Q NORTH 2O0, EXPEDITION WAY HILLWOOD ALLIANCE
SERVICES, LLC 9800 HILLWOOD PARKWAY
ALLIANCE TOWN CENTER NORTH 9800 HILLWOOD PARKWAY,SUITE 300 SUITE 250
FORT WORTH TX 76177
FORT WORTH,TEXAS 76177 PHONE:817-562-3350 °
GRAPHIC SCALE DATE:DECEMBER 2018 PHONE: (817) 224-6000
'G0LDEN'TRrANG E.... '
... ...
., BOULEVARD
44••t5lt
i' <It •
Q ,d GL ATC NORTH ;:'.( ,,1
No.1,LTD. RACETRAC PETROLEUM,INC. \�/ AIL INVESTMENT,J.P.
INST.#D215014733 INST.#D215035449 VOL.14315,PG.
C.R.T.C.T. C.R.T.QT. C.R.T.0-T.
� co
CID
to
2 E.= EXPEDITION WAY ���',-�s /
J`~
L.L.L.L.�
AIL INVESTMENT,L.P.
AIL INVESTMENT,L.P.
(TRACT 11 VOL.14315,PG.56 � TEXAS HEALTH RESOURCES
VOL.14315,PG.56 C.R.T.C.T. \.;./ J INST.#D209326476
C.R.T.C.T. 1.Y C.R.T.C.T.
F+
AIL INVESTMENT,L.P.
VOL.14315,PG.56
C.R.T.C.T.
U�
NI
�I
3i
E
3
x
4
U
LEGEND
U
' E
• PROPOSED STREET LIGHTS
O EXIST STREET LIGHTS
U
p
EXHIBIT C — STREET LIGHTS
------------- ------------ ----------------------- ---------------------------------------- -------------------------------------------------
OWNER/ DEVELOPER: pELOTON
HILLWOOD ALLIANCE
O NORTH Zoa, EXPEDITION WAY
LAND LOLYTIOM� m�
SERVICES, LLC 9800 HILLWOOD PARKWAY
ALLIANCE TOWN CENTER NORTH 9800 HILL'VVPOD PARKWAY,SUITE 300 SUITE FORT WORTH,TX 76177
FORT WORTH,TEXAS 76177 PHONE:817-562-3350 °
GRAPHIC SCALE DATE:DECEMBER 2018 PHONE: (817) 224-6000
GOLDEN'TRIANOL.E......• _.........•,
I` 3.
y. I
GL ATC NORTH #:*
N0.1,LTD. RACETRAC PETROLEUM,INC. AIL INVESTMENT,L.P.
Q INST.#D215035449 VOL.14315,PG.56
INST.#D215014733
C.R.T.0 T. C.R.T.C.T. '.• C.R.T.C.T.
�V I •
fV'�P
r EXPEDITION WAY ��•; y
ti
-[,
E
r?:• J� /
; t
AIL INVESTMENT,L.P. AIL INVESTMENT,L.P. j•.
(TRACT 11) VOL.14315,PG.56 • !•° / TEXAS HEALTH RESOURCES
VOL.14315,PG.56 C.R.T.C.T. V;.. / INST. D209326476
• tf C.R.T.C.T.
:.I
AIL INVESTMENT,L.P.
VOL.14315,PG.56
C.R.T.C.T.
:
U�
�I
3
3
i
• E_
• �I
3
• x
U
12
LEGEND
' E
PROPOSED STREET NAME SIGNSul
-
EXIST STREET NAME SIGNS
: o
EXHIBIT C1 - STREET NAME SIGNS
--- ---------------------------------------------------------------------------------------------------------------------------------
�j OWNER/ DEVELOPER: PELOTON E
NORTH 200 EXPEDITION WAY HILLWOOD ALLIANCE �� LAMC �OLY710 Ms
SERVICES, LLC 9800 HILLWOOD PARKWAY
ALLIANCE TOWN CENTER NORTH 9800 HILLWOOD PARKWAY,SUITE 300 SUITE 250 =
FORT WORTH,TEXAS 76177 FORT WORTH,TX 76177 0
PHONE:817-562-3350
GRAPHIC SCALE DATE:DECEMBER 2018 PHONE: (817) 224-6000