Loading...
HomeMy WebLinkAboutContract 51200-AR1 CITY SECRETARY FORT WORTH City of Fort Worth CONTRACT NO. 51200 Construction Allowance Request Project Namel Campbell Street From Crenshaw Avenue to Avenue J City Sec No. 51200 Project No.(s)J 100733 M&C: C-28771 City Proj.No. 100733 Project Description: This project include the design and the reconstruction of Campbell Street from Ave J to Crenshaw Avenue. Contractor: JLB Contracting,LLC Allowance No: Date: 2/20/2019 City Project Mgr,l Maged Zaki City Inspector: I Adilda Cazorla Phone Number: 817-392-5448 Phone Number: 817-223-2282 Dept. Water Sewer Paving Totals Contract Time (Calender days) Original Contract Amount $139,599.95 $69,086.50 $1,098,223.03 $1,306,909.48 180 Previous Allowances Allocated $0.00 $0.00 $0.00 $0.00 0 Go to ADD&DEL Tabs to Enter CO Backup $4,400.00 $0.00 $0.00 $4,400.00 0 Original Allowance Available for Allocation $30,000.00 $30,000.00 $80,000.00 $140,000.00 Remaining Funds Available for this Allocation $30,000.00 $30,000.00 $80,000.00 $140,000.00 Revised Contract Time 180 _JWTIFICATIQN(RW,- -0NSj EORAIrOWANCE While putting in the water line on Line A and Line B we encountered an existing water service on each line in the construction area. These each needed to be replaced in order to restore water to the existing houses. The following services were tied in at 3600 Ave K and 3600 Ave L -SOF FO�� Atte Mary J. K sff,tity Secretary It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request. Con tract9f,&.000ariMafne Contractor Name (Contractor$ignatute Date JLB Contracting,LLC Aaron Perez 3/1/2019 Inspector Date Project Magag _ Date Dire for . avec A Date Construct pta; uAe tsar.T/FWDept}- - - Date L4 T As l tang _ drn , _ Date Assistant City�Mana-ger __ Bate VV EFT. 0RTI# FOP,. F W43kR'TH City of Fort Worth Construction Allowance Request Project Name I Campbell Street From Crenshaw Avenue to Avenue J City Sec No. 51200 Project No.(s) 100733 M&C: G28771 City Proj. No. 100733 Project This project include the design and the reconstruction of Campbell Street from Ave J to Crenshaw Avenue. Description Contractor JLB Contracting,LLC Allowance No: F-T-1 Date: 2/20/2019 City Project Mgr. Maged Zaki City InspectorAdilda Cazorla CONSTRUCTION ALLOWANCE ITEMS TO BE ADDED ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total Unit 1 21 1"Tap for Water Service on Line A,service to 3541 Ave K. Water 2.00 EA $2,200.00 $4,400.00 Water $4,400.00 Sewer Paving Page 1 of 3 JAdditions Sub Total $4,400.00 F4 RT WC RT H City of Fort Worth 1W'�'''� Construction Allowance Request Project Name Campbell Street From Crenshaw Avenue to Avenue J City Sec No. 51200 Project No.(s) 100733 M&C: C 28771 City Proj.No. 100733 Project Description This project include the design and the reconstruction of Campbell Street from Ave J to Crenshaw Avenue. Contractor JLB Contracting,LLC Allowance No: 0 Date 2/20/2019 City Project Mgr. Maged Zaki City Inspector Adilda Cazorla CONSTRUCTION ALLOWANCE ITEMS TO BE DELETED ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total Water Sewer Paving Page 2 of 3 Deletions Sub Total MIWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00 Page 3 of 3 Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requireTgnts. Maged Zaki Project Manager OFFICIAL.RECORD CITY SECRETARY FT. WORTH,TX