HomeMy WebLinkAboutContract 51755-FP1 City Secretary Contract 5,755 -FPI
FORT WORTH. Date Received Apr 1,2019
E NY
f4u
NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: VICTORY SHOPS AT BAILEY BOSWELL
City Project No.: 101876
Improvement Type(s), Water N Sewer 0
Original Contract Price: $27,49&W�
'Armunt of Approved Change Order(s),
Revised Contract Amount:
Total Cost of Work Complete: $27,496M
AL/1- M a r 27, 2019
uso',Bw'rnekufl,A,v
..................—----------—-----------------—-—--------- ............
Contractor Date
VP of Operations
........................................
Title
Tri Dal. Utilities, Ltd.
Company Name
Mar 27,2019
. .. ............................................ ....... . ..... ......
Project Inspector Date
Aallm.-
;77 M a r 27, 2019
................................ ...........
;P ,ecl Ma Date
M a r 28, 2019
. ................__'-.....' ...............
CFA Manager Date
M a r 28, 2019
S1�"'n C'�nk(Kv M'201 9�
. ..............
Asst. City Manager Date
DFICIAL RECORD Page I of 2
0111 YSECRETARY
FTWORT14, TX
I
I
Notice of Project Completion
Project Name: VICTORY SHOPS AT BAILEY BOSWELL j
City Project No.: 101876
i
City's Attachments
Final Pay Estimate 0
Change Order(s): ❑ Yes 0 N/A
Pipe Report: 0 Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time: 21 CD Days Charged: 46
Work Start Date: 2/4/2019 Work Complete Date: 3/21/2019
Page 2 of 2
f
f
FoRTWORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name VICTORY SHOPS AT BAILEY BOSWELL
Contract Limits
Project Type WATER
City Project Numbers 101876
DOE Number 1876
Estimate Number 1 Payment Number 1 For Period Ending 3/25/2019
CD
City Secretary Contract Number Contract Time 2(rD
Contract Date Days Charged to Date 46
Project Manager NA Contract is 100.00 Complete
Contractor TRI DAL EXCAVATION&UTILITIES INC
540 COMMERCE ST
SOUTHLAKE, TX 76092
Inspectors DICKINSON / CISNEROS
Monday,March 25,2019 Page I of 4
� 4
r
City Project Numbers 101876 DOE Number 1876
Contract Name VICTORY SHOPS AT BAILEY BOSWELL Estimate Number I
Contract Limits Payment Number I
Project Type WATER For Period Ending 3/25/2019
Project Funding
WATER
Item Estimated Estimated Completed Completed
Description of Items Unit Unit Cost
No. Quanity Total Quanity Total
1 6"PVC WATER PIPE 81 LF $38.00 $3,078.00 81 $3,078.00
2 2"WATER SERVICE I EA $2,425.00 $2,425.00 1 $2,425.00
3 FIRE HYDRANT 1 EA $3,650.00 $3,650.00 1 $3,650.00
4 8"X 6"TAPPING SLEEVE&VALVE 2 EA $3,450.00 $6,900.00 2 $6,900.00
5 TRENCH SAFETY 81 LF $3.00 $243.00 81 $243.00
6 REMOVE ASPHALT PVMT 34 SY $50.00 $1,700.00 34 $1,700.00
7 10'WIDE ASPHALT PVMT REPAIR, 30 LF $250.00 $7,500.00 30 $7,500.00
RESIDENTIAL
8 TRAFFIC CONTROL 1 MO $2,000.00 $2,000.00 I $2,000.00
Sub-Total of Previous Unit $27,496.00 $27,496.00
Monday,March 25,2019 Page 2 of 4
i
City Project Numbers 101876 DOE Number 1876
Contract Name VICTORY SHOPS AT BAILEY BOSWELL Estimate Number I
r
Contract Limits Payment Number 1
Project Type WATER For Period Ending 3/25/2019
Project Funding
Contract Information Summary
Original Contract Amount $27,496.00
Change Orders
Total Contract Price $27,496.00
Total Cost of Work Completed $27,496.00
Less %Retained $0.00
Net Earned $27,496.00
Earned This Period $27,496.00
Retainage This Period $0.00
Less Liquidated Damages
Days(Z� /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $27,496.00
Monday,March 25,2019 Page 3 of 4
1
City Project Numbers 101876 DOE Number 1876
Contract Name VICTORY SHOPS AT BAILEY BOSWELL Estimate Number I
Contract Limits Payment Number I
Project Type WATER For Period Ending 3/25/2019
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors DICKINSON / CISNEROS Contract Date
Contractor TRI DAL EXCAVATION&UTILITIES INC Contract Time 21 CD
540 COMMERCE ST Days Charged to Date 46 CD
SOUTHLAKE, TX 76092 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $27,496.00
Less %Retained $0.00
Net Earned $27,496.00
Earned This Period $27,496.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $27,496.00
Monday,March 25,2019 Page 4 of 4
FORTWORTH
TRANSPORTATION AND PUBLIC WORDS
PIPE REPORT FOR:
PROJECT NAME: VICTORY SHOPS AT BAILEY BOSWELL
PROJECT NUMBER: CPN 101876
DOE NUMBER:
WATER
PIPE LAID SIZE TYPE OF PIPE LF
PVC 6" C-900 81
FIRE HYDRANTS: I VALVES(16" OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES:
NEW SERVICES: 2" COPPER 42
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES:
NEW SERVICES:
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth• 1000 Throclunorton Street•Fort Worth,TX 76012-6311
(817) 392-7941 •Fax: (817)392-7845
AFFIDAVIT
STATE OF Texas
COUNTY OF Tarrant
Before me, the undersigned authority, a notary public in tile state
and county aforesaid, on this (lay personally appeared Jason Bien-neier,
V. P. Operations Of Tri Dal Utilities, Ltd., known to me to be a credible
person, who being by nic duly sworn, upon his oath deposed and said;
That all persons, firnis, associations, corporations, or other
organizations furnishing labor and/or materials bane been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
G.
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Victory Shops at Bailey Boswell
BY
Jas n Beirnieier V.P. Operations
-e me on this a 27 of March, 2019.
Subscribed and sworn before e
...........
F,"J: I'F'[-)1� -XA
Notary Public
C UM N4 E X,P I �j I
Tarrant County, Texas i140 FIARY q) 130')HVIN� d
CONSENT OF OWNER E]
SURETY COMPANY ARCHITECT E]
TO FINAL PAYMENT CONTRACTOR 0
AIA DOCUMENT G707 SURETY 0
OTHER 0 Bond 4 106997576
PROJECT:Victory Shops at Bailey Boswell-Public Water and Paving Improvements
TO(Owner): CONTRACT FOR: Construction
City of Fort Worth
1000 Throckmorton Street
Fort Worth,TX 76102 CONTRACT DATE:
CONTRACTOR:
Tri Dal Utilities,Ltd.
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the
Travelers Casualty and Surety Company of America
One Tower Square
Hartford,CT 06183 SURETY COMPANY,
on bond of
Tri Dal Utilities,Ltd.
540 Commerce St.
Southlake,TX 76092 CONTRACTOR,
hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its obligations to
City of Fort Worth
1000 Throckmorton Street
Fort Worth,TX 76102 OWNER,
As set forth in the said Surety Company's bond
IN WITNESS WHEREOF,
the Surety Company has hereunto set its hand this 26th day of March,2019.
Travelers Casualty and Surety Company of America
Surety
Sigrciturc,�alufhorizedr,opKesentando)
Attest:
(Seal) —Dtc.esch, Witness Felix Navejar
„Name Attorney-In-Fact
..........
PARTF"'RD.
0 N N.
AIA DOCUMENTG707 CONSENT OF SURrl; Y"T `SNAIL PAYMENT APRIL 1970 EDITION ALAS
- y"I 14 "*
0 1970-THE AMERICAN INSTITUTE OF ARCI�?TL4',C "S `' ORK AVE,,NW,WASHINGTON,D.C. 20006
Travelers Casualty and Surety Company of America Travelers
TRAVELERS Casualty and Surety Company
St.Paul Fire and Marine Insurance Company
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS:That Travelers Casualty and Surety Company of America,Travelers Casualty and Surety Company,and St.
Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut(herein collectively called the
"Companies"),and that the Companies do hereby make,constitute and appoint Felix Navejar,of Grapevine,Texas,their true and lawful Attorney-in-
Fact to sign,execute,seal and acknowledge any and all bonds,recognizances,conditional undertakings and other writings obligatory in the nature
thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons,guaranteeing the performance of contracts and executing or
guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law.
IN WITNESS WHEREOF,the Companies have caused this instrumentto be signed,and theircorporate seals to be hereto affixed,this 3rd day of February,
2017.
By:
40 Robert L.Raney,Se or Vice President
State of Connecticut
City of Hartford ss.
On this the 3rd day of February,2017,before me personally appeared Robert L.Raney,who acknowledged himself to be the Senior Vice President of
Travelers Casualty and Surety Company of America,Travelers Casualty and Surety Company,and St. Paul Fire and Marine Insurance Company, and
that he,as such,being authorized so to do,executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations
by himself as a duly authorized officer.
In Witness Whereof,I hereunto set my hand and official seal.
p.
My Commission expires the 30th day of June,2021
Mane C.Tetreault,Notary Public
This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Travelers Casualty and
Surety Company of America,Travelers Casualty and Surety Company,and St. Paul Fire and Marine Insurance Company,which resolutions are now in
full force and effect,reading as follows:
RESOLVED,that the Chairman,the President,any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any
Second Vice President,the Treasurer, any Assistant Treasurer,the Corporate Secretary or any Assistant Secretary may appoint Attorneys-in-Fact and
Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with
the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a
bond,recognizance,or conditional undertaking,and any of said officers or the Board of Directors at any time may remove any such appointee and revoke
the power given him or her,and it is
FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice
President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company,provided that each such delegation
is in writing and a copy thereof is filed in the office of the Secretary;and it is
FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional
undertaking shall be valid and binding upon the Company when(a)signed by the President,any Vice Chairman,any Executive Vice President,any Senior
Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant
Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary;or(b)duly executed(under seal, if required)by
one or more Attorneys-in-Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more
Company officers pursuant to a written delegation of authority;and it is
FURTHER RESOLVED,that the signature of each of the following officers:President,any Executive Vice President,any Senior Vice President,any Vice
President,any Assistant Vice President,any Secretary,any Assistant Secretary,and the seal of the Company may be affixed by facsimile to any Power
of Attorney or to any certificate relating thereto appointing Resident Vice Presidents,Resident Assistant Secretaries or Attorneys-in-Fact for purposes only
of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof,and any such Power of Attorney or certificate bearing
such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile
signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached.
1, Kevin E. Hughes, the undersigned, Assistant Secretary of Travelers Casualty and Surety Company of America, Travelers Casualty and Surety
Company,and St.Paul Fire and Marine Insurance Company,do hereby.edtli'j+','(T�'Vt40,e,above and foregoing is a true and correct copy of the Power of
Attorney executed by said Companies,which remains in full force anOLff 3 u f r
Dated this 26th day of March,2019. �, ' �O
ORD, ' A
hr'`••...,,,..• `ij� . Kevin E.Hughes,Ass tant Secretary
p i
JJjI
To verify Me authenticity of this Power.. call us at 1-800-421 3880.
Meese refer try fire above named Ad vnwy4n-Fact and the details of the band to which the power is attached.