Loading...
HomeMy WebLinkAboutContract 51755-FP1 City Secretary Contract 5,755 -FPI FORT WORTH. Date Received Apr 1,2019 E NY f4u NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: VICTORY SHOPS AT BAILEY BOSWELL City Project No.: 101876 Improvement Type(s), Water N Sewer 0 Original Contract Price: $27,49&W� 'Armunt of Approved Change Order(s), Revised Contract Amount: Total Cost of Work Complete: $27,496M AL/1- M a r 27, 2019 uso',Bw'rnekufl,A,v ..................—----------—-----------------—-—--------- ............ Contractor Date VP of Operations ........................................ Title Tri Dal. Utilities, Ltd. Company Name Mar 27,2019 . .. ............................................ ....... . ..... ...... Project Inspector Date Aallm.- ;77 M a r 27, 2019 ................................ ........... ;P ,ecl Ma Date M a r 28, 2019 . ................­_­_'-.....' ............... CFA Manager Date M a r 28, 2019 S1�"'n C'�nk(Kv M'201 9� . .............. Asst. City Manager Date DFICIAL RECORD Page I of 2 0111 YSECRETARY FTWORT14, TX I I Notice of Project Completion Project Name: VICTORY SHOPS AT BAILEY BOSWELL j City Project No.: 101876 i City's Attachments Final Pay Estimate 0 Change Order(s): ❑ Yes 0 N/A Pipe Report: 0 Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety Statement of Contract Time Contract Time: 21 CD Days Charged: 46 Work Start Date: 2/4/2019 Work Complete Date: 3/21/2019 Page 2 of 2 f f FoRTWORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name VICTORY SHOPS AT BAILEY BOSWELL Contract Limits Project Type WATER City Project Numbers 101876 DOE Number 1876 Estimate Number 1 Payment Number 1 For Period Ending 3/25/2019 CD City Secretary Contract Number Contract Time 2(rD Contract Date Days Charged to Date 46 Project Manager NA Contract is 100.00 Complete Contractor TRI DAL EXCAVATION&UTILITIES INC 540 COMMERCE ST SOUTHLAKE, TX 76092 Inspectors DICKINSON / CISNEROS Monday,March 25,2019 Page I of 4 � 4 r City Project Numbers 101876 DOE Number 1876 Contract Name VICTORY SHOPS AT BAILEY BOSWELL Estimate Number I Contract Limits Payment Number I Project Type WATER For Period Ending 3/25/2019 Project Funding WATER Item Estimated Estimated Completed Completed Description of Items Unit Unit Cost No. Quanity Total Quanity Total 1 6"PVC WATER PIPE 81 LF $38.00 $3,078.00 81 $3,078.00 2 2"WATER SERVICE I EA $2,425.00 $2,425.00 1 $2,425.00 3 FIRE HYDRANT 1 EA $3,650.00 $3,650.00 1 $3,650.00 4 8"X 6"TAPPING SLEEVE&VALVE 2 EA $3,450.00 $6,900.00 2 $6,900.00 5 TRENCH SAFETY 81 LF $3.00 $243.00 81 $243.00 6 REMOVE ASPHALT PVMT 34 SY $50.00 $1,700.00 34 $1,700.00 7 10'WIDE ASPHALT PVMT REPAIR, 30 LF $250.00 $7,500.00 30 $7,500.00 RESIDENTIAL 8 TRAFFIC CONTROL 1 MO $2,000.00 $2,000.00 I $2,000.00 Sub-Total of Previous Unit $27,496.00 $27,496.00 Monday,March 25,2019 Page 2 of 4 i City Project Numbers 101876 DOE Number 1876 Contract Name VICTORY SHOPS AT BAILEY BOSWELL Estimate Number I r Contract Limits Payment Number 1 Project Type WATER For Period Ending 3/25/2019 Project Funding Contract Information Summary Original Contract Amount $27,496.00 Change Orders Total Contract Price $27,496.00 Total Cost of Work Completed $27,496.00 Less %Retained $0.00 Net Earned $27,496.00 Earned This Period $27,496.00 Retainage This Period $0.00 Less Liquidated Damages Days(Z� /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $27,496.00 Monday,March 25,2019 Page 3 of 4 1 City Project Numbers 101876 DOE Number 1876 Contract Name VICTORY SHOPS AT BAILEY BOSWELL Estimate Number I Contract Limits Payment Number I Project Type WATER For Period Ending 3/25/2019 Project Funding Project Manager NA City Secretary Contract Number Inspectors DICKINSON / CISNEROS Contract Date Contractor TRI DAL EXCAVATION&UTILITIES INC Contract Time 21 CD 540 COMMERCE ST Days Charged to Date 46 CD SOUTHLAKE, TX 76092 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $27,496.00 Less %Retained $0.00 Net Earned $27,496.00 Earned This Period $27,496.00 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $27,496.00 Monday,March 25,2019 Page 4 of 4 FORTWORTH TRANSPORTATION AND PUBLIC WORDS PIPE REPORT FOR: PROJECT NAME: VICTORY SHOPS AT BAILEY BOSWELL PROJECT NUMBER: CPN 101876 DOE NUMBER: WATER PIPE LAID SIZE TYPE OF PIPE LF PVC 6" C-900 81 FIRE HYDRANTS: I VALVES(16" OR LARGER) PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: NEW SERVICES: 2" COPPER 42 SEWER PIPE LAID SIZE TYPE OF PIPE LF PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: NEW SERVICES: TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth• 1000 Throclunorton Street•Fort Worth,TX 76012-6311 (817) 392-7941 •Fax: (817)392-7845 AFFIDAVIT STATE OF Texas COUNTY OF Tarrant Before me, the undersigned authority, a notary public in tile state and county aforesaid, on this (lay personally appeared Jason Bien-neier, V. P. Operations Of Tri Dal Utilities, Ltd., known to me to be a credible person, who being by nic duly sworn, upon his oath deposed and said; That all persons, firnis, associations, corporations, or other organizations furnishing labor and/or materials bane been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; G. That there are no claims pending for personal injury and/or property damages; On Contract described as; Victory Shops at Bailey Boswell BY Jas n Beirnieier V.P. Operations -e me on this a 27 of March, 2019. Subscribed and sworn before e ........... F,"J: I'F'[-)1� -XA Notary Public C UM N4 E X,P I �j I Tarrant County, Texas i140 FIARY q) 130')HVIN� d CONSENT OF OWNER E] SURETY COMPANY ARCHITECT E] TO FINAL PAYMENT CONTRACTOR 0 AIA DOCUMENT G707 SURETY 0 OTHER 0 Bond 4 106997576 PROJECT:Victory Shops at Bailey Boswell-Public Water and Paving Improvements TO(Owner): CONTRACT FOR: Construction City of Fort Worth 1000 Throckmorton Street Fort Worth,TX 76102 CONTRACT DATE: CONTRACTOR: Tri Dal Utilities,Ltd. In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the Travelers Casualty and Surety Company of America One Tower Square Hartford,CT 06183 SURETY COMPANY, on bond of Tri Dal Utilities,Ltd. 540 Commerce St. Southlake,TX 76092 CONTRACTOR, hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall not relieve the Surety Company of any of its obligations to City of Fort Worth 1000 Throckmorton Street Fort Worth,TX 76102 OWNER, As set forth in the said Surety Company's bond IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this 26th day of March,2019. Travelers Casualty and Surety Company of America Surety Sigrciturc,�alufhorizedr,opKesentando) Attest: (Seal) —Dtc.esch, Witness Felix Navejar „Name Attorney-In-Fact .......... PARTF"'RD. 0 N N. AIA DOCUMENTG707 CONSENT OF SURrl; Y"T `SNAIL PAYMENT APRIL 1970 EDITION ALAS - y"I 14 "* 0 1970-THE AMERICAN INSTITUTE OF ARCI�?TL4',C "S `' ORK AVE,,NW,WASHINGTON,D.C. 20006 Travelers Casualty and Surety Company of America Travelers TRAVELERS Casualty and Surety Company St.Paul Fire and Marine Insurance Company POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS:That Travelers Casualty and Surety Company of America,Travelers Casualty and Surety Company,and St. Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut(herein collectively called the "Companies"),and that the Companies do hereby make,constitute and appoint Felix Navejar,of Grapevine,Texas,their true and lawful Attorney-in- Fact to sign,execute,seal and acknowledge any and all bonds,recognizances,conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons,guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WHEREOF,the Companies have caused this instrumentto be signed,and theircorporate seals to be hereto affixed,this 3rd day of February, 2017. By: 40 Robert L.Raney,Se or Vice President State of Connecticut City of Hartford ss. On this the 3rd day of February,2017,before me personally appeared Robert L.Raney,who acknowledged himself to be the Senior Vice President of Travelers Casualty and Surety Company of America,Travelers Casualty and Surety Company,and St. Paul Fire and Marine Insurance Company, and that he,as such,being authorized so to do,executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. In Witness Whereof,I hereunto set my hand and official seal. p. My Commission expires the 30th day of June,2021 Mane C.Tetreault,Notary Public This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of Travelers Casualty and Surety Company of America,Travelers Casualty and Surety Company,and St. Paul Fire and Marine Insurance Company,which resolutions are now in full force and effect,reading as follows: RESOLVED,that the Chairman,the President,any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President,the Treasurer, any Assistant Treasurer,the Corporate Secretary or any Assistant Secretary may appoint Attorneys-in-Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond,recognizance,or conditional undertaking,and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her,and it is FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company,provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary;and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when(a)signed by the President,any Vice Chairman,any Executive Vice President,any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary;or(b)duly executed(under seal, if required)by one or more Attorneys-in-Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority;and it is FURTHER RESOLVED,that the signature of each of the following officers:President,any Executive Vice President,any Senior Vice President,any Vice President,any Assistant Vice President,any Secretary,any Assistant Secretary,and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents,Resident Assistant Secretaries or Attorneys-in-Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof,and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. 1, Kevin E. Hughes, the undersigned, Assistant Secretary of Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company,and St.Paul Fire and Marine Insurance Company,do hereby.edtli'j+','(T�'Vt40,e,above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies,which remains in full force anOLff 3 u f r Dated this 26th day of March,2019. �, ' �O ORD, ' A hr'`••...,,,..• `ij� . Kevin E.Hughes,Ass tant Secretary p i JJjI To verify Me authenticity of this Power.. call us at 1-800-421 3880. Meese refer try fire above named Ad vnwy4n-Fact and the details of the band to which the power is attached.