NOTICE OF PROJECT COMPLETION
its Pt oje a)
iCity I' 00354
Regardinl;contract 100354 for WELLINGTON, TER INFRASTRUCTURE 1,BLUE MOUND
as required lip the'WATER DEPARTMENT approved / /A the director
of the WATERDEP i n of the Assistant Directorof the Transportation is
WorksDepartment accepted the project as complete.
l Contract Price. S82,691M
ountofApproved Cbaage Orders: Ne
Reid Contract,Amount. ,
Total Cost Work Completed: S82,691.0
Is A
e-com, Acceptance Date
AsSt. Dlre W -Development Services
x,
",dY"
a
Acoeptd Date
Director, WATER DEPARTMENT
Asst. Clty Manager Date
Dnpa�rtrn t f TP W net. ervlces
ON - Cut
° Co Management
r
P.O.E. rot herton
A !oe Is
canned - K5_ OFFICIAL RgCoR;
ingpeo �NIYThe Praced SOCMARY
concerning the rpqu, far,final ll6ynnent&haveFT. WoRr"I TX
rate this project for such,Payment.
Clearance Conducted By
City Project Ntimbers 100354 DOE Number
Contract Name WLf.L INCPPTONI,MAls-rER lNE'RAs'rR41'C"1'UR 1,BI,UE 9d tJNT R E, Estimate Number
ber h
Contract Limits Payment Number 1
Project"Type A'1],:&SE W'ER For Period Ending
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors t,AYER / SLA'rEN contract Date
Contractor )t O A "l'1 q hJC k°1[N(',x 7 13C 1 Ei lir,t.l. Contract Time 20 CD
110 BOX 93929 Bays Charged to Tate 358 C
SOU'"1'14LAKE, rx 76,092 Contract is .000000 0 Complete
CITY OF FORT WORTII
SUMMARY OF CHARGES
Line Fund Account Center amount dross Retainage Net
EFunded.
"Total Cost of"Work Completed $822,691.55
Less %Retained MOO
Net Earned $82,691,55
Earned This Period $82,691.55
Retainage This Period $0,00
Less Liquidated Damages
ll bays g $0.00 /Day $01.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Pius Material on hand Less 1 % $0.00
Balance Due This Payment ��2,69 1,55
Thursday,May 10,2018 Page 4 of 4
FORTWORTH
CITY OF FORS"WORTH
FINAL PAYMENT RE,QUEST
Contract Name WELLINGTON,MASTER INFRASTRUCTURE 1,BLUE MOUNT RD WEST
Contract I,imits
Project Type WKITR&SEWER
City Project Numbers 1 O0354
DOE Number 0354
Estimate Number I Payment Number I For Period Ending 511012018
CD
City Secretary Contract Number Contract Time 247D
Contract Date Days Charged to Date 358
Project Manager NA Conti-act is I ODO00 Complete
Contractor KODIAKTRENCHING 7 BORING,LLC
P 0 BOX 93929
SOUITILAKE, TX 761192
Inspectors LAYER / SLATEN
Thursday,May 10,2018 Page,ll of 4
-------—-----............................................................................— S _
City Project Numbers 100354 DOE Number 0354
Contract Name WELLFNGTON,MASTER INFRASTRUCTURE 1,BLUE MOUNT RD WE Estimate Number I
Contract Limits. Payment Number I
Project Type WATER&SEWER, For Period Ending 5/10/2018
Project Funding
WATER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
...... ------ ....... ........ .............. ....... .. .. . ... ....... ........ — '__ , .. _.-
1 12"WATER PIPE 122 LF $37,00 $4,514.00 122 S4,514.00
2 8"WATER PIPE 973 LF $22.00 $21,406.00 973 $21,406.00
3 8"GATE VALVE 3 EA $1,250,00 $3,750.00 3 S3,750�.00
4 FIRE HYDRANT 1, EA $2,450.00 $2,450.00 1 $2,450.00
5 DUCTILE IRON WATER FITTINGS 0,88 TN S5,000.00 $4,400.00 0.88 $4,400.00
W/RESTRAINT
6 CONNECTION,TO EXISTING 36"WATER MAIN I EA $1,500.00 $1,500.00 1 $1,5100 00
7 36"XIT'TAPPING SLEEVE&VALVE I EA $7,7100-00 $7,700.00 1 $7,7KOO
8 TRENCH SAfETY 1 095 LF $0,25 $273.75 1095 $273.75
9 CONCRETE ENCASEMENT 9.6 CY $130.00 $1,248.00 9-6 $1,24&00
10 SWPPP I LS $300.00 $300.00 1 $300.00
. ........ .... ....... ......- .... ........ . ......- ...... . ........ , , .
Sub-Total of Previous Unit $47,541.75 $47,541.75
SEWER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
......... ...... -.1- ... ..... ........ . ......
1 12"SEWER PIPE 248 LF $40,00 $9,9201.00 248 $9,920,00
2 4'MAN HOLE I EA $2,450.00 $2,450,00 1 $2,450.00
3 4'EXTRA DEPTH MANHOLE 9 VF $2,450.00 $22,050,00 9 $22,050-00
4 TRENCH SAFETY 248 LIF $0.25 $62.00 248 $62,00
5 POST CCTB INSPECTION 248 LF $1-10 $272.80 248 $272,810
6 MANHOLE VACUUMTEsTiN(i I EA $150,00 $150.010 t $150,010
7 SWPPP I LS $245.00 $245.00 1 $245-010
.... ... ------- . ....... . ........ .... .. ..... ....... _ ...... .........
Sub-Total of Previous Unit $35,149.80 $35,149.80
.. ................. ...... ......
Thursday,May 10,2018 Pa.,,e 2 of 4
....................................
City Project Numbers 100354 DOE Number 0354
Contract Name WEI-LINGTON,MASTER INFRASIRUCI-URE 1,BLUE MOUNI-RD WE Estimate Nomber I
Contract Limits Payment Number I
Project Type WA,rER&SEWE.R For Period Ending 5/10/2018
Project Funding
Conti-act Information Summa
Original Conti-act Amount S82,691.55
Change Orders
Total Contract Price $82,691.55
cz,
A bate Total Cost of Work Completed $82,691.55
Contractor Less %Retained $0,00
Net Earned $82,691'.55
,
Date 6
-
Insp cation ry or Earned This Period $82,691,55
RetainageThis Period 0.00
Date Less Liquidated Damages
"Ole all
Days 1 Day $0.00
Date at <f
LessPavenient Deficiency $0.00
Asst. Less Penalty $U0
Date Less Previous Payment $0.00
Director Y Contracting Department Plus Material on Hand Less 15% $U0
Balance Due This Payment $82,691,55
'rhUrsday,May 10,2018 Page 2 of 4
FORTWORTH rev 03/05/07
rau�mim 01M171fiC%/'Il,ll Yl �"�IGl9rur�s�r�ix�a, ,
TRANSPORTATION & PUBLIC WORKS
FINAL STATEMENT OF CONTRACTTIME
FINAL STATEMENT NO.: I
NAME OF PROJECT: Wellington,Master Infi-astructure Blue Mound Egad West
PROJECT'"T NO.: 100354 CONTRACTOR: Kodiak
PERIOD FRO,M;I15/08/17 TO": Il l/30/'1 ' FINAL INSPECTION DATE: �-�- � _ ➢
WORK ORDER EFFECTIVE: CONTRACT TIME: 20 0 WD 0 CD
DAY OF DAYS REASON FOR DAYS DAY OF TRAYS REASON FOR DAY
MONTH CHARGED CREDITED CHARGED DURING
CREDITED
MONTH'
1. 1 Ta.
2. 17.
3. 18.
. 19.
. 20.
6. 2'1.
7. 22.
23.
2 „
10. 25.
11. 2 ,
1.2. 2 .
13. 2 .
14. 29.
15. 30.
31.
SAT,SUN, RAIN,'TOO WET, UTILITIES OTHERS,** 'T DAYS 'TOTAL
HOLIDAYS & 'TOO COLD RELOCATIONS HAR ED D,AY
THIS 35
PERIOD
PREVIOUS
PET IOD
TOTALS
DATE358
*REMARKS:
CONTRACTOR DATE INSPECTOR DC ATE
ENGINEERING DE1' ,,U dlvllvNT
( (817)392-7941 - Fax:(817)392- 7845
D
The City L F'ort Worth+"1018"I'Iazoclemortou Street»Fort Worth,TX 76012- 511 �,
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority,a notary public in the state
and county aforesaid, on this day personally appeared Matthew Mahone,
Managing Director Of Kodiak Trenching and Boring,LLC,known to me
to be a credible person,who being by me duly sworn,upon his oath
deposed and said;
That all persons, firms, associations,corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury andlor
property darnages;
On Contract described as;
Wellington Master Infrastructure
BY
Matthew ne
Subscribed and sworn before me on this date 16th of April, 20 18.
N( ,6 y Public 'v
Tarrant, Texas
.' JENNIFER NAVARRO
.6,
SNotary Public,state of Texas'
omm Expires 04-28-2020
NOtarY 10 130640644
BCD1045815 OWNER
FX
CONSENT OF SURETY ARCHITECT
TO FINAL PAYMENT CONTRACTOR
Conforms with the American Institute of SURETY
Architects,AIA Document G707 OTHER
TO 0 NER: HPG Wellington North Development Corp ARCHITECT'S PROJECT N O:
(Name and addroxv) 3001 Knox St, Suite 207 Dallas,TX
AND The City of Fort Worth Texas
200 Texas Street CONTRACT FOR:
Fort Worth,TX 76102 C3 Wellington,, Master Infrastructure 1, Blue Mound Rd, West
PROJECT: Master Infrastructurel,'Blue Mound Rd. CONTRACT DATED:
(Natne anaaddrevs) Fort Worth,Texas October 13,2016
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the
(Insert name and address ofSlureiy)
The Hanover Insurance Company
440 Lincoln Street
Worcester,MA 01653
SURETY,
on bond of
anvert name and address qfConsracicn,)
Kodiak Trenching and Boring
214 East College Street
Grapevine,TX 76051
,CONTRACTOR,
hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall not relieve the Surety of any
of its obligations to
(Insert name and address ofowneo)
HPC Wellington North Development Corp
3001 Knox St,'Suite 207 Dallas, TX AND The City of Fort Worth Texas
200 Texas Street
Fort Worth,TX 76102
OWNER,
as set forth in said Surety's bond.
IN WITNESS WHFREOF,the Surety has hereunto set its hand on this date: February 10,2018
(Insert in wriOns ihcv mondy failowed by the numeric daiG andyear)
Subscribed and sworn'to before me,a Notary The Hanover Insurance Company
Public, in and for County of Fairfield and
S of
JC !nnect'
11�
Attest: 20� ......
Notar u 10 t-1 46,kqWnii��ofa uthorized representafive)
'Expiration DaIeP17AL
Robert D. Riggs I Dir.of Construction Operations-Surety
(Printed nome and title)
S-21341AS 10101
XDP
—---- .........111.1-------------------
FO I RT WORTH
1RU000""',
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: -Wellington Master Infrastructure I Blue Mound Road West
PROJECT NUMBER: 100354
DOE NUMBER: N/A
WATER
PIPE LAID SIZE TYPE OF PIPE LF
12" PVC 122
PVC 973
FIRE HYDRANTS: I VALVES(16"OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: All Passed
NEW SERVICES:
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
PVC 248
PIPE ABANDONED SIZE TYPE OF PIPE LP'
DENSITIES: All Passed
NEW SERVICES:
TRANSPORTATION AND PUBLIC WORKS