HomeMy WebLinkAboutContract 50312-A1 CITY SECRETARY
CONTRACT No. 5 0313-
AMENDMENT No.1
TO CITY SECRETARY CONTRACT
WHEREAS, the City of Fort Worth (CITY) and Freese and Nichols,
Inc. , (ENGINEER) made and entered into City Secretary Contract No.
50312 , (the CONTRACT) which was authorized by M&C C-28566 on the
301 day of January, 2018 in the amount of $3,099,361 . 00 ; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Lake Arlington Lift Station and Force Main; and
WMEREAIS, it has become necessary to execute Amendment No. 1 to
the CONTRACT to include an increased scope of work and revised
fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and
through their duly authorized representatives, enter into the
following agreement, which amends the CONTRACT:
1 .
Article I of the CONTRACT is amended to include the additional
engineering services specified in a proposal dated December 17,
2018, a copy of which is attached hereto and incorporated herein.
The cost to City for the additional design services to be performed
by Engineer totals $229,755.00 .
2 .
Article II of the CONTRACT is amended to provide for an increase
in the fee to be paid to Engineer for all work and services
performed under the Contract, as amended, so that the total fee
paid by the City for all work and services shall be an amount of
$3,329,116.00.
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date last written by a
signatory, below.
rFT.
Y SECRETARY
Page -1- WORTH,T
APPROVED: ENGINEER
City of Fort Worth Freese and Nichols In .
Jesus J. Chapa Thomas Haster, P.E.
Assistant City Manager Chief Business Development Officer
DATE: DATE:
APPROVAL RECOMMENDED:
Chris Harder, P.E.
Director, Water Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for
the monitoring and administration of this contract, including
ensuring all performance and reporting requirements .
at' aP udyal, P.E.
Professional Engineer
APPROVED AS TO FORM AND LEGALITY: M&C: C-29067
Date: March 19, 2019
Form 1295 No. : 2019-440147
QLA,
Douglas W. Black
Senior Assistant City Attorney
ATTEST:
U
ser
City SecretaryAcj
L
RECORD
RETARY
Page -2- RTH,TX
rM • approaches
EIESE Innovative
4055 International Plaza,Suite 200 • Fort Worth,Texas 76109 • 817-735-7300 • fax 817-735-7492 www.freese.com
December 17,2018
Ms. Pratima Poudyal, P.E.
Project Manager
City of Fort Worth Water Department
311 West 10th Street
Fort Worth,TX 76102
Re: Amendment 1 for the Lake Arlington Force Main(City Project No. 100995)
Dear Ms. Poudyal:
Freese and Nichols, Inc. (FNI) is providing this proposal to amend the Engineering Design Services for the
Lake Arlington Lift Station and Force Main (City Project Number 100995).The following fee includes the
costs for environmental study,geotechnical investigation,and engineering design relating to
approximately 1,000 linear feet of aerial pipe crossing Lake Arlington and its required supports, plus
investigation of eight additional geotechnical boring areas. FNI records show that this proposal would
serve as Contract Amendment No. 1.
• Environmental services required to design pier support system under NWP 12 or 25
• Geotechnical investigation and engineering recommendation required for design of pier support
system. Plus,8 additional locations for geotechnical investigation along the force main route.
• Design plans and specifications required specifically for the aerial lake crossing
• Coordination with other entities with a vested interest in the lake water
A summary of the additional costs is shown below:
Item Fee
Environmental study $4,003
Geotechnical investigation $130,301
Design of aerial pipe crossing $95,451
Total $229,755
[FTW18195]T:\1.02 PM\Amendments\Amendment 1-Pier Design\Amendment 1 Letter
CPN 100995 Amendment No. 1 ! �y '
Aerial Pipe Crossing for the Lake Arlington Force Main
December 17,2018
Page 2 of 2
Freese and Nichols,Inc. appreciates this opportunity and we would like to meet with you to discuss
these additional services at your convenience.
Original Contract Amount $3,099,361
Amendment No.1 $ 229,755
Contract Amount to Date $3,329,116
Sincerely,
k.#'&�
Russell Gibson, P.E.
Vice President
Attachments
Scope of Work
Level of Effort Spreadsheet
[FTW18195]T:\1.02 PM\Amendments\Amendment 1-Pier Design\Amendment 1 Letter]
& r
@§!2a
§#®\ ! !! -
\
�) �
§\ ; W
f2 0
'a r
( it iwz -
��� £!k -
-
xLu 0 RM M) °
{1:2-0 ]
\§ f2o &-
/
,
)f-
61.
-
!r -
!) .92
-
kia !}\/##°} I\
t$ §\$!»;!i !#[i 1 w \ )2)(a \{: 1 "I \\\ } \/
City of Fort Worth, Texas
Mayor and Council Communication
DATE: Tuesday, March 19, 2019 REFERENCE NO.: **C-29067
LOG NAME: 60LALSFMAl-FNI
SUBJECT:
Authorize Execution of Amendment No. 1 in the Amount of$229,755.00 to City Secretary Contract No.
50312, an Engineering Agreement with Freese and Nichols, Inc., for a Revised Contract Amount of
$3,329,116.00 for Design of the Lake Arlington Lift Station and Force Main, Located in the Carver Heights
East and Enchanted Bay Neighborhoods (COUNCIL DISTRICT 5)
RECOMMENDATION:
It is recommended that the City Council authorize execution of Amendment No. 1 to City Secretary
Contract No. 50312, an Engineering Agreement with Freese and Nichols, Inc., in the amount of
$229,755.00 for a revised contract in the amount of$3,329,116.00 for Design of the Lake Arlington Lift
Station and Force Main, Located in the Carver Heights East and Enchanted Bay Neighborhoods. (City
Project No. 100995)
DISCUSSION:
On January 30, 2018, Mayor and Council Communication (M&C C-28566) the City Council authorized the
execution of an Engineering Agreement with Freese and Nichols, Inc., in the amount of$3,099,361.00 for
the preparation of plans and specifications for the Lake Arlington Lift Station and Force Main Project.
Amendment No. 1 will provide plans and specifications for a 1,000 linear feet aerial pipe crossing of Lake
Arlington to accommodate the proposed force main. The amendment will also allow for additional
geotechnical investigations at 8 locations along the force main.
This project will have no impact on the Water Department's Operating Budget when complete.
M/WBE OFFICE: Freese and Nichols, Inc., is in compliance with City's BDE Ordinance by committing to
33 percent SBE participation on this amendment. The City's SBE goal approved by the MWBE office on
this amendment is five percent.
The project is located in COUNCIL DISTRICT 5.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that funds are available in the Water and Sewer Capital Projects 2018
Bond Fund for Lake Arlington Lift Station and Force Main Project.
Funding for the Lake Arlington Lift Station and Force Main Project is depicted in the table below.
FUND Existing 11 Existing Project Total*
Appropriations Appropriations
W&S Capital Project 2018 $8,729,361.00 $0.00 $8,729,361.00
Fund 56014
Project Total $8,729,361.00 11 $0.00 $8,729,361.00
* Numbers rounded for presentation purposes.
http://apps.cfwnet.org/ecouncil/printmc.asp?id=26787&print=true&DocType=Print 3/20/2019
TO
Fund Department ccoun Project ProgramActivity Budget Reference# moun
ID ID Yhartfield 2)
FROM
Fund Department ccoun Project JProgram ctivity Budget Reference# moun
ID ID Year (Chartfield 2)
CERTIFICATIONS:
Submitted for City Manager's Office by: Jay Chapa (5804)
Originating Department Head: Chris Harder (5020)
Additional Information Contact: Pratima Poudyal (6149)
ATTACHMENTS
1. 60LALSFM FNI MAP.pdf (Public)
2. 60LALSFMAl FNI Compliance Memo.pdf (CFW Internal)
3. 60LALSFMAl FNI Form 1295 2019-440147 Redacted.pdf (Public)
4. 60LALSFMAl-FNI FID Table.pdf (CFW Intemal)
5. SAM Freese and Nichols Inc.pdf (CFW Internal)
http://apps.cfvvnet.org/ecouncil/printme.asp?id=26787&print=true&DoeType=Print 3/20/2019
v
N
C�
C
Q
y v v
a3 a a
V r �
= C 3
3 �
a a d Q
d
Z
N m
O
to
OD
L L O
CL a a
u
LLC-4
LL
u N.. u N..
L L L
W y W cu
_ _ N
N r d v
F a F o �`. ItoM
W co W m W W
) _
« +�
Q -
a a a a -
z z
`o 0
O'
.. Y t y C y Y v
Y .o J o 0
a a Z a
r
N O N O C O
uu
W6
d
a CL a v
D D x
v
In
C 0 ?
LL LL LL I LL