HomeMy WebLinkAboutContract 50005-A1 CITY SECRETARY AMENDMENT No. 1 CONTRACT NO. 5DLQ5-Pr 1 TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and RJN Group, Inc. , (ENGINEER) made and entered into City Secretary Contract No.50005, (the CONTRACT) which was authorized by M&C C-28461 on the 7th day of November 2017 in the amount of $525, 000 .00; and WHEREAS , the CONTRACT involves engineering services for the following project: M-199 C-R Sanitary Sewer Main Parallel Interceptor. WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated January 2, 2019, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $157 ,325 . 00. 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $682,325 .00 . 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL.MOW ��0�� CITY SICRTAX p'���°ey FT. WORTH �'� tA Page -1- EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER RJN Group, Inc. N_ a J Jesus J. Chapa Daniel ckson, P.E. Assistant City Manager Vice President DATE: DATE: ` 3�2 S �� APPROVAL RECOMMENDED: ef6 IJ16 Chris Harder, P.E. Director, Water Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. l&i 2E Walter Norwood, P.E. Sr. Professional Engineer APPROVED AS TO FORM AND LEGALITY: M&C: C-29070 Date: March 19, 2019 Form 1295 No. 2019-441269 Douglas W. Black Senior Assistant City Attorney ATTEST. Mary J. e City Secretary } FT. W RECORD SECRETARY TK, 'TX,, Page -2- �.rjn.com — -- Excellence through Ownership January 2, 2019 Mr. Walter Norwood,P.E.,Project Manager City of Fort Worth Water Department 311 W. 10t'Street Fort Worth, Texas 76102 RE: Contract Amendment No. 1 M-199C-R Parallel Interceptors for West Fork Basin City Secretary Contract No. 50005 City Project No. 100836,Contract No. C-28461 Mr. Norwood: As you requested, please find attached Contract Amendment No. 1 to the M-199C-R Parallel Interceptors for West Fork Basin Project. This amendment request primarily addresses the Conceptual Design Phase of the project with the specific narrative elements summarized below: BACKGROUND: The M-199C-R Parallel Interceptor for the West Fork Basin conceptual alignment and permitting evaluation was submitted to the City of Fort Worth in May 2018. Data collection during the conceptual design phase revealed that there is no existing CCTV along the existing M-199C,M- 199C-R or M-199B interceptors.Additionally, it was confirmed that all of the currently evaluated proposed M-199C-R relief pipeline alignments would require a Section 408 authorization due to the proposed relief interceptor crossing the existing USACE levee and well as requiring a Section 404 authorization(NWP12)to cross Farmers Branch Creek. On June 14, 2018, the City of Fort Worth staff inspected the conceptual alignment alternatives presented in the May 2018 report with the RJN Group design team in order to evaluate RJN's recommendation for potential relief sewer interceptor alternatives. The least cost alternative requires open cutting through private, maintained residential and equestrian properties and was determined during this field visit not be the preferred alignment to continue to pursue. The other pipeline alignments presented in the Technical Memorandum were given additional considerations by staff and an initial recommendation was made to look more closely at the relief pipeline alignment which includes construction within Burton Hill Road and Aton Drive in Westworth Village (Alternative 2). The selection of this roadway alignment presents significant challenges and costs associated with installing pipeline in close proximity to existing utilities, including a City of Fort Worth 12-inch waterline in parallel with the potential relief sewer alignment, and considerations for replacing at least one-half of the newly reconstructed Burton Hill concrete roadway. At this time additional investigation and analysis is required to further evaluate Alternative 2 noted above, as well as investigating additional relief sewer alternative pipeline routes established by City staff. 6701Brentvvood Stair Road,Suite 1 11W-Fort Worth, • • 817.451.3500 817.451,3506 r Tyll www.rjn.com ri - — Excellence through Ownership AMENDMENT NO. 1: This amendment is for CCTV inspection of the existingsanitary anitary sewer mains and for additional pipeline route studies. Data Collection Services (Tasks 2.1 and 2.2): To confirm the location of known or unknown City of Westworth Village public and private service connections to the existing M-199 system, RJN performed an additional 17 manholes and junction structure inspections of Fort Worth and Westworth Village infrastructure located close to each other in order to discern services connections between Fort Worth and the wholesale wastewater customer. Based on that field work, RJN also determined that 9,842 LF of MSI ($6.75/LF) and 3,748 LF of traditional CCTV ($1.75/LF) pipeline inspections needed to be performed by DFW Infrastructure to facilitate the overall relief sewer and existing M-199CR pipeline rehabilitation design. DFW Infrastructure's and Ace Pipe Cleaning field services are included in this amendment proposal.Ace Pipe would serve as a back-up to DFW infrastructure, if needed. This cost also includes Multi-Sensor Inspections during CCTV for M-199C-R and M-199B to evaluate pipe condition and thickness. This amendment task item also includes effort related to collecting data for two additional conceptual alignments and additional coordination meeting with the USACE to review conceptual alignments as needed. The additional alignments to be evaluated include reevaluating the proposed upstream connection as well as the overall flow routing for the M-199 system. • Supplemental Route Analysis & Conceptual Design Exhibits (Task 2.3): This amendment cost includes effort used to develop exhibits for two (2) additional alignments for the City including property ownership as well as evaluating the feasibility (constructability) of those additional pipeline alignments. This amendment task item also includes the cost for generating exhibits 2 additional alignments (for a total of seven)and revising the property ownership and overall route study exhibits. Under the Amendment No. 1 request,RJN has integrated the costs noted above in the amendment item summaries provided into a single LOE fee request for this amendment (see attached spreadsheet) which is summarized by project task costs are shown in the summary cost table below: Task Description Hrs Labor($) Expenses Total Costs No. ($) ($) Task 2 Conceptual Design: 2.1 Data Collection(Includes CCTV): 106 $ 13,974.00 $73,044.00 $ 87,018.00 2.2 Additional Manhole Inspections 84 $ 7,552.00 $ 250.00 $ 7,802.00 2.3 Route Analysis&Conceptual 422 $ 55,114.00 $ 86.00 $ 55,200.00 Design Exhibits SUBTOTAL: 1 $ 76,640.00 $73,380.00 $ 150,020.00 10%Sub $7,304.50 Marku TOTAL: $157,324.50 6701 •••Stair Road,Suite I/1W-Fort Worth, • • 817.451.3500 817.451.35W mn° "iw.rjn.com J Excellence through Ownership There are supplemental services required to be performed by existing certified SBE/MWBE firms associated with this amendment request. More specifically, $31,500.00 of the total request will be performed by the following certified SBE/MWBE firms listed in the table below: Task Firm Amount Percent M CCTV Inspection DFWlnfrastructure, Inc. $31,500.00 20.02% TOTAL: $31,500.00 20.02% The $31,500.00 in certified SBE/MWBE services noted above represents an approximate twenty percent(20.02%) commitment level to the project costs associated with Amendment No. 1. Contract Amendment No. 1 represents nearly a thirty percent (29.97%) increase in the total contract value of this project. Therefore,we are requesting Contract Amendment No. 1 to the M- 199C-R Parallel Interceptors for West Fork Basin in the amount of$157,324.50. For your convenience,a summary of the total project fees are as follows: Contract Item Original Contract Amount $ 525,000.00 Amendment No. 1 $ 157,324.50 Amended Contract Value $ 682,324.50 Please do not hesitate to contact us should you have questions or need any additional background information concerning this matter. Thank you for your time and consideration. Sincerely, 4/1.Z44(- Chris Brooks,P.E., Senior Project Manager RJN-18319300 CC: Tony Sholola,P.E.,FWWD, City of Fort Worth Daniel Jackson,P.E.,Vice President,RJN Group Amanda Voss,P.E.,Project Engineer,RJN Group ! ; CZ m ■ ; , ° ° ° ° 222 % S2 ; ■.� � k ! § aJ §, Z2 _ / 7J k 7 = o k0kk� � 'c �EkJ / J £M0 ! {##LL 0 � It \a © CL ._ T2 \ f ! ; © © § dcn k � § ; - ; _ \ { , k § - 1. / .§ \ § ƒ § § §; } j , ) _ 6 !! ! ! _ / \ f - § r ! ' ! ! ! ! > ! §m | ) ) � ! 2k ! ! ! § \ k{ { } ter |« ` � kk \ | |, | ƒ\ § ƒ [ { � _ � 2 $ {) 77 { § kk � | ; E ƒ � k _ / \ / / {\ / \ \ } ( ) \ \k \ { )) ) | | ( ( \ / \ \ \ � _- \ : : 5 : ; / } ; ; 2 ; = : : ; . = \ j ] / § kk ! _ _ 21.1 %!m$! � . 2 ; ! jf i ; § ; k k° k « _ | « ` kz&5 |a ■� § . AIkJf | £nc0 �??#a. \a Z ko , 0 ME x IL a ` N kk ) { 30: / t! - ! ` { ! � ) \ . ! | � \ { - ! $ \;! �_ . ■ : ( \ ) ( \ \ \ §\{ k) $ \ \� lor W,. «:; !§§ M� d [ § § ] ) : . : : : . : : ; : . 2 ; a : ; _ _ § § /)2 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 3/19/2019 - Ordinance No. 23600-03-2019 DATE: Tuesday, March 19, 2019 REFERENCE NO.: **C-29070 LOG NAME: 60M199CRPIWFBA1- RJN SUBJECT: Authorize Execution of Amendment No. 1 in the Amount of$157,325.00.to City Secretary No. 50005 with RJN Group, Inc., for a Revised Contract Amount of$682,325.00 for M-199 C-R Sanitary Sewer Main Parallel Interceptor and Adopt Appropriation Ordinance (COUNCIL DISTRICT 7) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached Appropriation Ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of$207,325.00; and 2. Authorize execution of Amendment No. 1 in the amount of$157,325.60 to City Secretary No. 50005, for the M-199 C-R Sanitary Sewer Main Parallel Interceptor Project(City Project No.100836). DISCUSSION: On November 7, 2017, (M&C C-28461), the City Council authorized an Engineering Agreement in the amount of$525,000.00 with RJN Group, Inc., for the M-199 C-R Sanitary Sewer Main Parallel Interceptor Project. Amendment No. 1 will provide compensation for the following items that are necessary on the project: • Additional route analysis • Additional CCTV pipeline inspection • Additional manhole inspection • Additional progress report meetings • Flow data evaluation In addition to the amendment amount, $50,000.00 is required for project management. M/WBE OFFICE- RJN Group, Inc., is in compliance with City's BDE Ordinance by committing an additional 20% SBE participation on this Amendment No. 1. The project is located in COUNCIL DISTRICT 7 and Westworth Village. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, of the Water and Sewer Capital Projects Fund. The Fiscal Year 2019 Water Operating Budget includes appropriations of$35,856,873.00 for the purpose of providing Pay-As-You-Go funding for Sewer Capital Projects. After this transfer for Fiscal Year 2019,the balance will be $24,954,402.00. Appropriations as depicted below: httn:Hanns.cfwnet.org/ecouncil/r)rintmc.ast)?id=26744&print=true&DocType=Print 3/21/2019 FUND Existing Additional Project Appropriations Appropriations Total* W& S Capital Projects 2018 - Fund 56014 $600,000.00 $0.00 $600,000.00 Water and Sewer Capita( Projects - Fund 56002 $0.00 $207,325.00 $207,325.00 [Project Total $600,000.00 $207 325.00 $807,325.00 *Numbers rounded for presentation purposes. FUND IDENTIFIERS (FIDs): TO Fund Department ccoun Project ProgramActivityl Budget Reference# moun ID 1 I j Year (Chartfield 2) 1 FROM Fund Department fAccount� Project IVr6—gr—amjActivity udget Reference# mown ID ID ' i Year (Chartfield 2) CERTIFICATIONS: Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: Chris Harder (5020) Additional Information Contact: Walter Norwood (5026) ATTACHMENTS 1. 60M199CRPIWFBAl- RJN FID Table (Dan).docx (CFW Internal) 2. 60M199CRPIWFBAl- RJN 56002 A019r.docx (Public) 3. 60MI99CRPIWFBAl-RJ N Compliance Memo.pdf (CFW Internal) 4. 60M199CRPIWFBAl-RJN Form 12952019-441269 Redacted.pdf (Public) 5. 60MI99CRPIWFBAI-RJN Map.pdf (Public) 6. 60M199CRPIWFBA1-RJN SAM.pdf (CFW Internal) httn•//ann� e.fwnet.erg/ecouncil/t)rintmc.as-o?id=26744&print=true&DoeType=Print 3/21/2019 N Y C� C Q X X X p O O 3 3 7 a a a 0 a a 0 yL6 Li _ YLtiLn cC C o Ln Lm LM Q Q Q Q w� W Z 0 H ami N ami ami W_ > W > y } d - - - ai v v v � W m W m W m i/ rn rnM rn a = = a a a = z z Orn rn rnrnrn 00 00 00 0000 o - - - o -ri p a C C0 0 0 J1 a a - - LL Q rn a Ln LL - - - - d Q - - - - � Q - - - - W LL 9 - - - - y O c0 - - c - D c 3 7 LL Ln Ln LL • • �. ©' �D 1© ©11 ©11,1