Loading...
HomeMy WebLinkAboutContract 51374-CO1 CITY SECRETARY f%0NTRACT NO. 513-7 CO 1 Wb . RTWORTH. City of Fort Worth C`�{g�CF�PRl' Change Order Request Project Name I HMAC Surface Overlay(2019-3)at Various Locations City Sec# I 51374 Client Project#(s)l CPM#101611 Rood Descriptiorn Contractorl Advanced Paving Company Change Order# I� Date 3/21/2019 City Project Mgr,I Shammi Rahman City Inspector James Ruiz Dept. TPW-Storm Contract Time Water Totals D Original Contract Amount $642,330.60 $642,330.60 170 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $642,330,60 $642,330.60 170 Amount of Proposed Change Order $78,498.00 $78,498.00 Revised Contract Amount $720,828.60 $720,828.60 170 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(9 necessary) $78,498,00 $78,498.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 12.22% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25 0) $802,913.25 The original contract specified a soil stabilization 1:1 mixture of Roadbond and Cement. After applying this mixture to a quarter of the project site on Precinct Line Road,the soil stabilization mixture was found to be insufficient for the soil characteristics and the mixture was changed to 100%cement at the recommendation of the CFW Materials testing section and in accordance with industry standard. The portion of roadway placed with the 1:1 mixture was repaved with the cement only stabilization. Additionally,variations between the width of the existing pavement and the new pavement increased the overaii "y of asphalt pavement for the project. Attested by: pF FART` • O� M J. Ka , C' ikMtary l It is understood and agreed that the acceptance of this Change Order by the. r tituj�s"an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above "rdk The ProjecdProgram,Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,includin2/e7 wring all performance and reporting requirements. 1 Goitf�acfor's<Compao Nar�e�. Gpnfraptor Name ofi tSf" " ;A�1 Advanced Paving Company Sam L.Garrett i °'" 3/21/2019 4pf Via( ,, oflt[acti eqt Qept y5. .� e�0 eaurd # 1_ , ,4ssisfari(C :gip L a er f3�GGbl ... . M&C Number M&C Date Approved OFFICIAL KLLOK! 4 CITY SECRETARY FT. WORTH,T p 0 m 0 M O O N_ N O U N Li DO U � co O c N U N c T Q1 N O `- O U � t cn is U Cv0 cu N 2:1 E a O U n o'a Z +• o v U- a 0 00 o 43) c U = � u O U � ca M � C ? O T d N (� E U Z3 m Ca. C_ fp co m 0- E U 'E CU Qcu 2E o x U rn O U C 7�5 � 110. Q U 'o U CD O O OC) 00 co W ca L N O t 6 ` Q Q U) N O tao N [IIru d C UO Q 4J `C3 O v c U Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Shammi Rahman " Name of Employee/Signature Graduate Engineer Title ❑ This form is N/A as No City Funds are associated with this Contract Printed Name Signature M AL RECORDECRETARYORTH, TX