HomeMy WebLinkAboutContract 51071-AR1 CITY SECRETARY FORT WORTH City of Fort worth CONTRACTNO. 51071 ARI Construction Allowance Request Construction FOA# Date 3/15/2019 City Sec# 1 51071 Client Project#(s)l 100605 FAC#(s) Project Name E.4th St Bridge Rehabilitation Description Contractorl Gibson&Associates, Inc City Inspector William Roberson Funding TPW Select Day Type Allocation Account Totals Original Contract Amount $148,584.00 $148,584.00 Extras to Date Credits to Date Current Contract Amount $148,584.00 $148,584.00 Amount of Proposed Allocation $7,133.50 $7,133.50 Original Allowance Available for Allocation $10,000.00 $10,000.00 Allowance Funds Previously Allocated Remaining Funds Available for this Allocation $10,000.00 $10,000.00 .ItIS'I`IFICATION SUMMARY IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL: Furnish all labor and material as per attached proposed Construction Allowance Request(with attachments)to the Cons r e. Allowance Request: �ti .oF FORT�2 �11�O Ate GoS�Q�Q��t 4arfJ. a r, 6 tary It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request.Contract Time will be adjusted on the basis of the time shown on this Construction Allowance Request by a later Change Order,if necessary. Date :... - I Date . Ali Date ?ateCapbl Fmjad Officer/Asst.Dir Date Director fate FORT WORTH. City of Fort Worth "144 Construction Allowance Request Construction FOA# Date 3/15/2019 City Sec# 1 51071 Client Project#(s)l 100605 FAC#(s) Project Name E.4th St Bridge Rehabilitation Description Contractorl Gibson&Associates, Inc City Inspector William Roberson :ION FOR CONSTRUCTION F#ELD ORDER AL LOWAINCE IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL: Furnish all labor and material as per attached proposed Construction Allowance Request(with attachments)to the Construction Allowance Request: The installed steel plate size of beam girder was increased to 16"instead of 12"due to exisitng larger flange at mid span of bridge.This construction allowance is to compensate addtional material cost and 10%overhead. 0 0 c ir) o v) -0 o o c CO @ U c 0 U C Q N C T _T U N N O d � � v cr rn d o f6 d °' c O M o O O O Q LL � v 4- Q Q O = m O 0 � t U) co C 0) O (U ED m0 :- m CD w c N U N N Q1 c N O N N m Q Q CY) xLO o L 0 o w C s o tea. m � a ° a E.y o o U- m m U a a o C U cn 0 N LO � M M c2 M_ r-: ti EtT C O Q H O H 7 N O N N OA !O d C O Al- N O v UO c t U MIWBE Breakdown for this Construction Allowance Request MWBE Sub Type of Service Amount for this FOA Total $0.00 Previous Construction Allowance Requests CO# DATE AMOUNT Total $0.00 (3`11BSON & ASSOCIATES., INC. Engineers and Contractors \�l�p 6ENf9q�Co 11210 Ayliecrest o ® yf P.O.Box 800579 4 �r Balch Springs,Texas s 75180-0579 �f AMER�p� 972/557-1199 S K I L L INTEGRITY FAX 557-1552 RFS"oNSIB«`� March 17,2019 Mr.Tariqul Islam TPW/Street Services City of Fort Worth 5001 James Avenue Fort Worth,TX 76115 RE: Project: E. 41h Street Bridge Rehab Project No.: 100605 County: Tarrant Dear Sir: As we discussed prior to starting this work, the size of the new reinforcement plates was changed from 12"to 16" due to the existing bridge beam width being wider on the center span. This increase in size also increased the cost of the material. We need to be reimbursed for this additional expense. While the new plates were considerably heavier and harder to install, we are only asking for the actual increase in material cost. I have attached the original quote and the new paid invoice from the material supplier. The difference in cost is $6,485.00. With the standard. 10%material mark-up,this comes to $7,133.50. There is also a time impact associated with this change. As 16" wide plate is not a standard size,there was additional fabrication time needed. We will need an additional 30 days added to the contract for this change. If there are any questions regarding this matter,please call me. Very truly yours, GIBSON 7 & ASSOC TES, INC. Trey Meador Vice President NITER METAL SERVICES, INCH P.O. Sox 395 Paradise, TX 76073 Office: 817 932-3330 QUOTATION To: Pam Davis Fax: 972 557-1552 Company: Gibson &Associates, Inc. Pho: 972 557-1199 Date: Thursday, May 17, 2018 Project: City of Ft. Worth - Bridge Beam Reinforcement Plates - Scope: Fabricate and Deliver the following: (7) - 1"x 12" x 30'-0" Long Plates with (160) - 1" Drilled Holes. All Bars-One Coat Shop Primer (1,120) - 1"x 3 112"A 325 Galv. Bolts (1,120)- 1" A 325 Galv. Nuts (2,240)- 1" Galv. Flat Washers All Materials Delivered to Ft.Worth Job Site Terms: 50% Deposit to Order Steel and Hardware. Balance Due Upon Delivery Lead Time: 10- 12 Working Days Installation Duration: N/A Exclusions: Installation, Equipment to Unload at Job Site, Finish Painting, Sales Tax, Payment or Performance Bonds, Permits, Liquidated Damages, All Other Not Listed Above. Price: $ 18,500.00 Tax Included: ❑ Yes ® No Ted Sims Accepted By: Estimator Cell -214 506-1818 P. ®. # Date: Terms: Net 10 Days, or to pay with Credit Card, please add 6%to Quoted Price. Pricing is good for 30 Days, but could be subject to material increase due to fluctuating metal prices after the date of this Quotation. C. O. D. Orders require 50% Down to Start Work. United Metal Services, Inc. �. P.O.Box 395 Paradise,TX 760T3 y 817-932-3330 �+ : INVOICE -111_A�_ry� 1i Gibson & Associates DATE 01/10/2019 P.O..Box 800579 T R*MS Due an receipt Balch Springs;Texas 78180 DUE DATE 01/10/2019 RO; NUMBER RO.#18-1728 �� F ` '�' ���� xr �''C-��xc;. � � i`" 'naa ..,�;.,n ���� �..: r a'. i;.ny>x�'",. �y�." s;.. i•, � 1°S"a"-a4 Fab/ Deliver Fab/Deliver(7) 1"x 16 112 x 30'-0" Long Bridge Beam Reinforcement Plats $24,985,00 ---------------- BALANCE DUE $2085.00 1 1D� DIfT. "a PAW ran N� RAOOt POON.�MIe Thank you for your business! Page I of i i I Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Tariqul Islam Graduate En roger Title ❑ This form is N/A as No City Funds are associated with this Contract Printed Name . Signature [�`i-�CHETARY LL "'CORDNOUN, TX