HomeMy WebLinkAboutContract 51257-AR1 CITY SECRETARY FORT WORTH® City of Fort Worth CONTRACT NO. S l a 51-PCP-..1 Construction Allowance Request Construction FOA# Date 3/15/2019 City Sec# 1 51257 Client Project#(s)l 101602 FAC#(s) Project Name Concrete Restoration(2019-3)at Various Locations Description Contractorl Select Striping LLC City Inspector Lorrie Pitts Funding TPW Select Day Type Allocation Account Totals Original Contract Amount $940,678.00 $940,678.00 Extras to Date Credits to Date Current Contract Amount $940,678.00 $940,678.00 Amount of Proposed Allocation $2,117.50 $2,117.50 Original Allowance Available for Allocation $30,000.00 $30,000.00 Allowance Funds Previously Allocated Remaining Funds Available for this Allocation $30,000.00 $30,000.00 IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL:Furnish all labor and material as per attached proposed Construction Allowance Request(with attachments)to the Construction Allowance Request: 9 �d�,"�-.,� ��cE°��� Ate by: _�; •••.��,t c�N'�N Nary J. ser Secre 7EX�5 It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request.Contract Time will be adjusted on the basis of the time shown on this Construction Allowance Request by a later Change Order,if necessary. Ir"itak roe Officer/ sst b-r ,,,ff : d l i -7L�' 01 FORT WORTH® City of Fort Worth *'% � Construction Allowance Request Construction FOA#u Date 311512019 City Sec# 1 51257 Client Project#(s)l 101602 FAC#(s) Project Name Concrete Restoration(2019-3)at Various Locations Description Contractorl Select Striping LLC City Inspector Lome Pitts LIiATION F'QR CONSTRlJCTlQN±!&D,,qME tAL.LO IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL:Fumish all labor and material as per attached proposed Construction Allowance Request(with attachments)to the Construction Allowance Request:This construction allowance is for lowering traffic signal cable at Western Center Blvd at Old Denton Rd.This construction allowance is to compensate labor and material cost including10%overhead. FORT WORTH. City of Fort Worth Construction Allowance Request Construction FOA# 0 Date 3/1 512 0 1 9 City Sec# 51257 Client Project Ns) 1 11602 FAC#(s) Project Name Concrete Restoration(2019-3)at Various Locations Description Contractorl Select Striping LLC City Inspector F- Lorrie Pitts ITEM _7SCRIPTION ADDITIONS ep ty Unit Unit Cost I ota New Loweinng existing Traffic Signal Gable at Western Center and Old Denton TPW $2,117.50 Sub Total Additions 2,117.50 Change Order Additions Page 1 of 1 FORT WORTH® City of Fort Worth Construction Allowance Request Construction FOA# 0 Date 3/15/2019 City Sec# 51257 Client Project#(s) 101602 FAC#(s) Project Name Concrete Restoration(2019-3)at Various Locations Description Contractorl Select Striping LLC City Inspector Lome Pitts GONSTRUGTION ALLOWANCE ITEMS TO BE REDUCED ITEM DESCRIPTION DepVFAC QtY Unit Unit Cost Total TPW $0.00 Sub Total Deletions 0.00 Change Order Deletions Page 1 of 1 M1WBE Breakdown for this Construction Allowance Request MWBE Sub Type of Service Amount for this FOA Total $0.00 Previous Construction Allowance Requests Cog DATE AMOUNT Total $0.00 Electrical Repair Item Description Unit Quantity Unit Price Total 9600 6000 Traffic Signal Conduit Repair 1 LS $ 2,117.50 Total $ 2,117.50 CONTROL: 101602 HIGHWAY: Western Center Blvd PROJECT: Concrete Restoration(2019-3) COUNTY: Tarrant QTY: 1.00 LS WORK DESCRIPTION: Traffice Signal Conduit Repair at 2921 Western Center Blvd ITEM DESCRIPTION QUANTITY UNIT PRICE EXTENSION ADJ.EXT. EQUIPMENT Survey Equip 1.00 LS $ - $ Sub total: $ 15%Equipment: $ EQUIPMENT UNIT PRICE $ LABOR BASE HOURS OT HOURS TOTAL HOURS BASE PRICE EXTENSION Sub total: $ 25%Labor: $ 55%Work Comp: $ Total: $ LABOR UNIT PRICE $ MATERIAL QTY UNIT UNIT PRICE EXTENSION Sub total: $ 25%Material: $ Total: $ $ MATERIAL UNIT PRICE $ SUBCONTRACTOR WORK QTY UNIT UNIT PRICE EXTENSION Makou,Inc. 1.00 LS $ 1,750.00 $ 1,750.00 Sub total: $ 1,925.00 10%Sub Marku $ 192.50 Total: $ 2,117.50 $ 2,117.50 SUBCONTRACT $ 2,117.50 SUBTOTAL $ 2,117.50 TOTAL $ 2,117.50 PRICE/EA $ 2,117.50 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Tariqul Islam Graduate Engineer Title ❑ This form is N/A as No City Funds are associated with this Contract Printed Name . Signature OFFICIAL RECORD 011TY SECRETARY FT WORTH,TX