Loading...
HomeMy WebLinkAboutContract 52165 CITY SECRETARY CONTRACT NO. 59.1 b 5 REIMBURSEMENT AGREEMENT THIS AGREEMENT ("Reimbursement Agreement"), made and entered into as of the 5th day of February, 2019, by and between BARNETT GATHERING LLC, a limited liability company whose mailing address is 22777 Springwoods Village Parkway, Spring, Texas 77389 - 1425 ("BG") and THE CITY OF FORT WORTH ("City") whose mailing address is 200 Texas Street, Fort Worth, Texas, 76102 (individually referred to as "Party" and jointly as "Parties"). All exhibits attached hereto are incorporated within this Reimbursement Agreement as if copied in full. WITNESSETH THAT; WHEREAS, the City was granted a 20-foot wide permanent easement for a sanitary sewer line in Tarrant County, Texas under the authority terms and conditions set forth in that certain easement recorded in Instrument Number D 172069689 of the Deed Records of Tarrant County, Texas; WHEREAS, the City was granted a 35-foot wide permanent easement for a sanitary sewer line in Tarrant County, Texas under the authority terms and conditions set forth in that certain easement recorded in Instrument Number D218094234 of the Deed Records of Tarrant County, Texas; WHEREAS, the City was granted a variable with temporary construction easement for construction of a sanitary sewer line in Tarrant County, Texas under authority terms and conditions set forth in that certain easement recorded in Instrument Number D218094236 of the Deed Records of Tarrant County, Texas; WHEREAS, the City was granted a 25-foot wide temporary construction easement for construction of a sanitary sewer line in Tarrant County, Texas under authority terms and conditions set forth in that certain easement recorded in Instrument Number D218094235 of the Deed Records of Tarrant County, Texas; WHEREAS, the City was granted a 35-foot wide permanent easement for a sanitary sewer line in Tarrant County, Texas under the authority terms and conditions set forth in that certain easement recorded in Instrument Number D213008970 of the Deed Records of Tarrant County, Texas; WHEREAS, an affiliated entity of BG was granted a Pipeline Right of Way and Easement, dated January 24, 2006, recorded in Instrument Number D206081625 of the Deed Records of Tarrant County, Texas and another Pipeline Right of Way and Easement, dated July 20, 2005, recorded in Instrument Number D206235147 of the Deed Records of Tarrant County, Texas. ("Pipeline ROW Agreements"); OFFICIAL RECORD CITY SECRETARY ��G�SE��`� xecution Copy 3/22/19 Barnett Gathering LLC and CFW Reimbursement A reeme �R��of� WHEREAS, BG has installed its pipeline in and across the above described rights of ways acquired in the Pipeline ROW Agreements, (the "Premises") the design of which is more particularly described in the attached Exhibit"A" ("Facilities"); WHEREAS, City is in the process of locating utilities through the Premises ("Development"), which affects BG's present Facilities within a portion of said Premises; WHEREAS, the proposed Development will interfere with the present location of BG's existing Facilities, and because the Facilities were located through the Premises before the City's Development, the City is responsible for the cost of the relocation; WHEREAS, City has requested that BG relocate its existing Facilities to provide for Development and enter into this Reimbursement Agreement with City providing for such relocation and for the reimbursement to BG of the expenses BG incurs in accommodating City's requested relocation of said Facilities as and to the extent provided below; and WHEREAS, with the permission of BG's affiliated entity, BG will perform the relocation of its existing Facilities in one phase, including any necessary survey, right of way services, engineering, cost estimation work as outlined in the attached Exhibit `B" and including the actual relocation of the Facilities in accordance with an approved engineering design, which will be lowered in accordance with Exhibit B; NOW, THEREFORE, in consideration of the premises and of the mutual covenants and agreements hereinafter set forth, it is agreed by and between the Parties hereto as follows: 1. This Reimbursement Agreement for the reimbursement of costs that BG incurs in the actual relocating of its Facilities as made necessary by City, which affects BG's present Facilities within a portion of said Premises. The Facilities will be lowered in accordance with Exhibit B. The City will reimburse BG in accordance with Exhibit B. It will be necessary for BG to do certain survey, engineering and surface site procurement to determine the components to be covered by this Reimbursement Agreement. Accordingly, City and BG have agreed to implement this Reimbursement Agreement to cover the payment by City of the costs outlined in Exhibit B and expenses to be incurred by BG in causing a survey of the area and Facilities to be affected by City's request, in having preliminary engineering and cost estimate prepared, final engineering design and relocation of the Facilities. 2. City shall pay to BG a set amount of Three Hundred Three Thousand Dollars and No Cents ($303,000.00) for costs and expenses incurred in connection with the preliminary survey, preliminary engineering, cost estimate, final engineering design and relocation of the Facilities in accordance with Exhibit B. City shall not be obligated for the reimbursement of any amount over $303,000.00. 3. BG will be paid under this Reimbursement Agreement within Thirty (30) days upon City's receipt of an invoice evidencing the completion of work performed and the City's receipt of the as built drawings required under this Reimbursement Agreement. BG will complete all work no later than June 3, 2019. If BG does not complete all work by this date, 2of7 Execution Copy 3/22/19 Barnett Gathering LLC and CFW Reimbursement Agreement City may extend the completion date in 30 day increments, but BG shall use its best efforts to accommodate the City's construction schedule for the Development. 4. BG agrees to notify City's Water Department field operation staff within in 48 hours of before beginning any work on the Premises and will coordinate the work as may be requested by City. 5. BG will submit as built drawings for the relocated Facilities within 60 days of completion of the work. BG will also submit the City an affidavit of bills paid in a form acceptable to City. 6. BG and City agree that any future construction or relocation shall not be subject to the terms and conditions of this Reimbursement Agreement and will be negotiated based on the facts and circumstances in place at that time. 7. BG anticipates all work can be done within the Premises; however, upon request by BG, City may grant, to the extent that it has the right to do so, any necessary temporary workspace City has the rights to for the relocation of the Facilities under this Reimbursement Agreement. BG shall be required to coordinate any work on temporary workspace granted under this section. 8. Nothing herein constitutes a waiver of the City's sovereign immunity. 9. BG agrees that the City shall, until the expiration of three (3) years after final payment under this Reimbursement Agreement, have access to and the right to examine any directly pertinent books, documents, papers and records (records) of BG involving transactions relating to this Reimbursement Agreement. The place and time of all audits must be reasonable and agreed to by both Parties. The City shall give BG reasonable advance notice of intended audits. BG shall include in any subcontracts a clause similar to this. The City can obtain a copy of any of BG's audits of it's contractors related to the relocation activities hereunder. 10. The person signing this Reimbursement Agreement for BG hereby warrants that BG has secured the legal right to the Premises; that he or she has the legal authority to execute this Reimbursement Agreement on behalf of his or her respective Party; and that such binding authority has been granted by proper order, resolution, ordinance or other authorization of the entity. City is fully entitled to rely on this warranty and representation in entering into this Reimbursement Agreement. 11. This written instrument (together will all exhibits) constitutes the entire understanding between the Parties, and any prior or contemporaneous, oral or written agreement that purports to vary from the terms hereof shall be void, but only as it relates to the work performed under this Reimbursement Agreements. This Reimbursement Agreement does not replace or supersede the Pipeline ROW Agreements. This Reimbursement Agreement may only be amended via written instrument signed by both Parties and dated after the execution date of this Reimbursement Agreement, provided, however that the Parties agree that any applicable changes in local, state, or federal laws, rules, or regulations that may occur during the term of 3 of 7 Execution Copy 3/22/19 Barnett Gathering LLC and CFW Reimbursement Agreement this Reimbursement Agreement shall be automatically incorporated into this Reimbursement Agreement without written amendment hereto and shall become part hereof as of the effective date of the law, rule, or regulation. 12. BG represents that it is self-insured and can cover any and all liabilities associated with the work being done under this Reimbursement Agreement. BG will contract with its contractors to carry adequate insurance to cover any and all liabilities . 13. This Agreement shall inure and be binding upon the successors and assigns of the Parties hereto. 14. BG SHALL INDEMNIFY OR HOLD HARMLESS THE CITY AGAINST LIABILITY FOR ANY DAMAGE COMMITTED BY BG OR BG'S AGENTS, CONSULTANT UNDER CONTRACT, OR ANOTHER ENTITY OVER WHICH BG EXERCISES CONTROL TO THE EXTENT THAT THE DAMAGE IS CAUSED BY OR RESULTING FROM AN ACT OF NEGLIGENCE, INTENTIONAL TORT, INTELLECTUAL PROPERTY INFRINGEMENT, OR FAILURE TO PAY A SUBCONTRACTOR OR SUPPLIER. CITY IS ENTITLED TO RECOVER ITS REASONABLE ATTORNEY'S FEES IN PROPORTION TO BG'S LIABILITY. 15. The law of the State of Texas shall govern the validity of this Reimbursement Agreement, its interpretation and performance, and any other claims related to it. The venue for any litigation related to this Reimbursement Agreement shall be Tarrant County, Texas. 16. BG shall at all times observe and comply with all federal and State laws and regulations and with all City ordinances and regulations which in any way affect this Reimbursement Agreement and the work hereunder, and shall observe and comply with all orders, laws ordinances and regulations which may exist or may be enacted later by governing bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof shall be considered. BG agrees to defend, indemnify and hold harmless City and all of its officers, agents and employees from and against all claims or liability arising out of the violation of any such order, law, ordinance, or regulation, whether it be by itself or its employees. 17. BG shall verify the identity and employment eligibility of its employees who perform work under this Reimbursement Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, BG shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. BG shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any BG employee who is not legally eligible to perform such services. BG SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS SECTION BY BG, BG'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. CITY, upon written notice to BG, shall have the right to immediately terminate this Agreement for violations of this provision by ENGINEER. 4of7 Execution Copy 3/22/19 Barnett Gathering LLC and CFW Reimbursement Agreement 18. BG acknowledges that in accordance with Chapter 2270 of the Texas Government Code, City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this Reimbursement Agreement, BG certifies that BG'S signature provides written verification to the City that BG: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. IN WITNESS WHEREOF, the Parties hereto have executed this Agreement as of the day and year first above written. "BG" BARNETT GATHERING, LLC By: { ..� 1rV\ -��..:... Name (Print) : _m&u%&.a M. C�,v•a,�i Title: V3<.�Gr 4+Lrcbzay�+vc "CitOYT " CIT W H �r By: 7 Name (Print): Je us J. Chapa `.Title: Assistant City Manager ATTEST: By: Ma Kays r � City Secretary Form 1295 Certification No. Not Required M&C: No: C-29028 Date: 2/5/2019 APPRO t S TO FORM AND LEGALITY: By: Jessica Sang van Senior Assi t City Attorney OFFICIAL FdECC CITY SECRE Execution Copy 3/22/19 Barnett Gathering LLC and CFW Reimbursement grfTmRTH,T'X CONTRACT COMPLIANCE MANAGER: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. A Name: John Kasavich Title: Water Department Engineering Manager CITY SECKET"4i"''° i FT WORTNTA7 Execution Copy 3/22/19 Barnett Gathering LLC and CFW Reimbursement Agmentem— STATE OF TEXAS § COUNTY OF § The foregoing instrument was acknowledg 'd before me on this day of March, 2019, by A , for Barnett there L , a Texas limited liability company, on behalf of said limited liability company. e (SEAL) Notary Public My Commission Expires STATE OF TEXAS § COUNTY OF TARRANT § This instrument was acknowledged befor me on the day of 20 , by Jesus J. Chapa, Assistant Ci ger of the City of Fort Worth, a Texas home rule municipality, on behalf of said City If ort rth. 1 � ; (SEAL) Notary Public My Commission Expires Return This Instrument To: City of Fort Worth Property Management Department Attn: Ricardo Salazar II 200 Texas Street Fort Worth,Texas 76102 With a Copy To: Barnett Gathering,LLC Attn: Laura Mamazza 110 West 7th Street Fort Worth,Texas 76102 ET. ECORD' TARYf C ° Execution Copy 3/22/19 Barnett Gathering LLC and CFW Reimburseme 4/11/2019 M&C Review Official site of the City of Fort Worth,Texas CITY COUNCIL AGENDA FORS W oRm COUNCIL ACTION: Approved on 2/6/2019-Ordinance No.23664-02-2019 DATE: 2/5/2019 REFERENCE **C-29028 LOG NAME: 60M257P2A-GAS NO.: RELOCATIONS CODE: C TYPE: CONSENTPUBLIC NO HEARING: SUBJECT. Authorize Execution of a Reimbursement Agreement with Barnett Gathering LLC,in the Amount of$303,000.00 for Two Gas Pipeline Relocations to Accommodate the Sanitary Sewer Main 257 Upper and Middle Village Creek Parallel Relief Main, Part 2 Project and Adopt Appropriation Ordinance(COUNCIL DISTRICT 8) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of$303,000.00 from available funds; and 2. Authorize the execution of a Reimbursement Agreement with Barnett Gathering LLC, in the amount of$303,000.00 for two gas pipeline relocations to accommodate the Sanitary Sewer Main 257 Upper and Middle Village Creek Parallel Relief Main, Part 2 Project(City Project No. 01227). DISCUSSION: The City's sewer easements for the Sanitary Sewer Main 257 Upper and Middle Village Creek Parallel Relief Main, Part 2 Project are subject to the existing gas pipelines. In order for the City to construct its project,the gas pipelines need to be lowered and relocated,and the City is responsible for the costs associated with relocating the gas pipelines. Barnett Gathering LLC, has agreed to lower and relocate the two conflicting gas pipelines,and the Reimbursement Agreement is necessary to allow reimbursement of the total cost of$303,000.00. Construction for relocation of the gas pipelines is anticipated to commence in February 2019. The relocations consist of the lowering of a ten-inch gas main by 17 feet for a distance of 150-feet at a cost of$220,000.00 and a ten-inch gas main by 13 feet for a distance of 40-feet at a cost of$83,000.00. The project is located in COUNCIL DISTRICT 8. This M&C does not request approval of a contract with a business entity. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance,funds will be available in the current capital budget,as appropriated,of the Water and Sewer Capital Projects Fund.The Fiscal Year 2019 Water Operating Budget includes appropriations of$35,856,873.00 for the purpose of providing Pay-As-You-Go funding for Sewer Capital Projects.After this transfer for Fiscal Year 2019,the balance will be$24,348,533.00. Funding for the Sanitary Sewer Main 257 Upper and Middle Village Creek Parallel Relief Main, Part 2 Project are as depicted below by fund: FUND Existing Additional F Ptoject Total* FAp Appropriations Water&Sewer Capital Projects $0.00 $303,000.00 Fj303,000.00 Fund 56002 Clean Water SRF Fund 59602 $969,090.00 $0.00 $969,090.00 Sewer Capital Fund-Legacy $3,283,000.00 $0.00 $3,283,000.00 59607 Project Total $4,252,090.00 $303,000.00 F $4,555,090.00 *Numbers rounded for presentation. TO Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year Chartfield 2 FROM Fund Department Account Project Program Activity Budget Reference# Amount ID ID Year Chartfield 2 Submitted for City Manager's Office by_ Jay Chapa(5804) Originating Department Head: Chris Harder(5020) apps.cfwnet.org/council_packet/mc_review.asp?I D=26742&councildate=2/5/2019 1/2 4/11/2019 M&C Review Additional Information Contact: John Kasavich(8480) ATTACHMENTS 60M257P2A-GAS RELOCATIONS Map.pdf 60M257P2A-GAS RELOCATIONS 56002 AO19.docx apps.cfwnet.org/council_packet/mc_review.asp?I D=26742&councildate=2/5/2019 2/2