Loading...
HomeMy WebLinkAboutContract 50006-A3 CITY SECRETARY CONTRACT N0. 000 6-ft 3 AMENDMENT No.3 TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Alan Plummer Associates, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 50006, (the CONTRACT) which was authorized by M&C C- 28464 on the 7th day of November, 2017 in the amount of $688, 037 . 00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment No. 1 in the amount $16,005.00 administratively authorized on July 31, 2018 and Amendment No. 2 in the amount of $54, 039. 00 administratively authorized on November 19, 2018 ; and WHEREAS, the CONTRACT involves engineering services for the following project: North Holly Water Treatment Plant Sedimentation Basin Sludge Removal System Replacement; and WHEREAS, it has become necessary to execute Amendment No. 3 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated February 20, 2019 a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $393 , 152 .00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1,151,233.00 . 3 P lz onG10Q1 All other provisions of the Contract, which are n G� G�yS amended herein, shall remain in full force and effect. 7FTWORTH ECORD TARY Page -1- ,TX EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth Alan P umme As ociate , Inc. Jesus J. Chapa David A. Guda .E. Assistant City Manager Senior Associate DATE: ` '� DATE: APPROVAL RECOMMENDED: Chris Harder, P.E. Director, Water Department APPROVED AS TO FORM AND LEGALITY: Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Dena J nson, P.E. Proje t Manager Douglas W. Black Senior Assistant City Attox_ a fY:G ATTEST- ®�,fOR7 q. Ma y s r t '. City Secretary /Form 1295 No. :2019-455428 M&C No. : C-29090 M&C Date: April 9, 2019 r OFFICIAL RECORD CITY SECRETARY Page -2- FT. WORTH,TX ASSOCIATES, INC. ENVIRONMENTAL ENGINEERS AND SCIENTISTS 0318-058-01 February 20, 2019 Ms. Dena Johnson Project Manager City of Fort Worth 200 Texas Street Fort Worth, Texas 76102-4397 Re: North Holly Water Treatment Plant Sedimentation Basin Sludge Removal System Replacement(City Project No. 02328) Contract Amendment No. 3 Dear Ms. Johnson: The purpose of this letter is to request authorization for$393,152 for Special Services. The fee includes$30,000 as a construction allowance to be used only if directed by the City in writing. Amendment No_ 3 adds the following new scope item: construction management and observation services. The following items are attached: (1)Amendment No. 3 scope of services. and (2)fee summary. The following table summarizes the engineering services fees: Item Amount Project Schedule Original Contract and $704,042 Notice to Proceed: December 18, 2017 Amendment No. 1 _ _ Estimated Duration: Dec.2018—Dec. 2019 Amendment No. 2 $ 54,039 Estimated Duration: Dec. 2018—May 2020 Amendment No. 3 $393,152* Total Cost $ 1,151,233 Note: Amounts include a markup factor of 1.10 for subconsultants and expenses. *Includes S30,000 as a construction allowance to be used only if directed by the City in writing. If you have any comments, please contact me. Sincerely, ALAN PLU MER ASSOCIATES, INC. Alan .Davis, P.E. /AED Enclosures: Scope of Services cc: Dr. Christopher Boyd, P.E., Alan Plummer Associates, Inc. 1320 SOUTH UNIVERSITY DRIVE SUITE 300 FORT WORTH,TEXAS 76107 PHONE 817.80&1700 FAX 817.E70.2536 tFt- fs ft.,ac.;Ysh3 cv;yEc,:',0318'058-OI 3 0 A,Jrt rns!rdtiun3-i cOIVTRACT.AGREEMENP,3;-'C014TR.ACTS Aa endrrent 3Amendmen'3 C2378.dc-x www.apaiem,.com TBPE Firm No,13 CONTRACT AMENDMENT NO. 3 CITY OF FORT WORTH NORTH HOLLY WATER TREATMENT PLANT SEDIMENTATION BASIN SLUDGE REMOVAL SYSTEM REPLACEMENT CONSTRUCTION MANAGEMENT AND OBSERVATION SERVICES Scope of Services February 20, 2019 1 Onsite Resident Project Representative Services 1.1 During construction of the North Holly Water Treatment Plant Sedimentation Basin Sludge Removal System Replacement project (Project), the Engineer shall provide a Construction Manager and an onsite resident project representative (RPR) who shall review the work of the Contractor and report to the City and the Contractor opinions of the Contractor's fulfillment of these recommended actions and adherence to the plans and specifications. The Engineer's project representatives shall endeavor to protect the City against defects and deficiencies in the work by reviewing the work for general conformance with the plans and specifications. However, the Engineer neither guarantees the performance of the Contractor, subcontractors, or other persons at the site nor assumes responsibility for Contractor's failure to perform the work in accordance with the contract documents. 1.2 The RPR will be the primary point of contact and communications for the parties during construction of the Project. The RPR shall at all times have access to the Work whenever it is in preparation or progress. The RPR and Construction Manager shall be provided as follows: 1.2.1 RPR—Average of 45 hours per week, for a duration of 52 Weeks (2340 RPR hours) 1.2.2 Construction Manager — Average of 4 hours per week for a duration of 52 weeks (208 construction management hours) plus meetings and correspondence. 1.2.3 City Project Manager shall review qualifications of RPR proposed by the Engineer for the Project and shall have the right to reject individuals. City Project Manager also has the right to request RPR be removed from the site and request alternative personnel be provided. 1.2.4 If additional time is required beyond that stated above, the Engineer may request additional compensation or relief by the City's personnel. 1.3 Internet-based Construction Management 1.3.1 The Engineer will use the City's online BIM 360 program as the internet-based construction management system for the work. 1.3.2 Monitor the processing of Contractor's submittals and provide for filing and retrieval of Project documentation. Produce monthly reports indicating the status of submittals in the review process. 1.3.3 Monitor the progress of the Contractor in sending and processing submittals to see that documentation is being processed in accordance with schedules. 1.3.4 Submit monthly reports of construction progress. Reports will describe construction progress in general terms and summarize project costs, cash flow, construction schedule, and pending and approved contract modifications. 1.4 Project Documentation 1.4.1 The RPR will maintain records of the Project, including monitoring and documenting the observed work in a field report log for each visit. The field report log will include notes on personnel onsite, subcontractor's personnel, delivery of equipment and materials, and testing agencies. RPR will summarize in monthly reports to the City. 1.4.2 The RPR will monitor the Contractor's actual progress relative to the Contractor's planned construction schedule. The RPR will provide reports of actual versus planned progress. The RPR will take photographs electronically of the progress and maintain a digital copy of them in an organized fashion. Submit monthly summary of status of major facilities to City. 1.4.3 The RPR will coordinate with the Contractor for the startup and testing of equipment and testing of piping and electrical systems as specified per the contract documents. The RPR will create a log tracking installation reports, startup, testing, and training. The RPR will create and maintain a log of equipment warranty start and end dates, and when the City takes ownership of each item. The RPR will work with the Engineer and City to create interim punch lists for the Contractor. These punch lists will be compiled into an overall punch list, which will be issued to the Contractor upon issuance of substantial completion. The RPR will coordinate with the Contractor to work through the items on the punch list. 1.5 Progress Payments 1.5.1 The RPR will review the draft payment requests for delivery of materials, and quantities completed and recommend City action on contract progress payments. Upon receipt of the contractor's payment request and the recommendation of the onsite project representatives,the Construction Manager will review the progress payment. 1.5.2 The Construction Manager's recommendation of payment shall constitute a representation to the City based on the Construction Manager's observation at the site and on the data comprising the contractor's estimates for payment, that the work has progressed to the point indicated and that the quality of work is in accordance with the contract documents. The foregoing representations are subject to minor deviations from the contract documents. The issuance of a payment recommendation shall further constitute a representation that the Contractor is entitled to the payment in the amount recommended. However, the issuance of a recommendation of payment shall not be a representation that the Construction Manager has (1) reviewed construction means, methods, techniques, sequences, or procedures, or (2) ascertained how or for what the purpose the contractor has used money previously paid on account of the contract. 1.6 Construction Observation 1.6.1 The RPR will provide field observation for conformance of the Contractor's work with plans and specifications and notify the Contractor and the City of any observed nonconforming work and monitor the progress of the Contractor's corrective actions. The onsite RPR shall not be responsible for means, methods, techniques, sequences, or procedures of construction selected by the Contractor or the safety precautions and programs incident to the work of the Contractor. 1.6.2 The RPR shall have the responsibility and authority to reject work that does not conform to the contract documents. Whenever the RPR considers it necessary or advisable for implementation of the intent of the contract documents, the RPR will recommend additional observation or testing of the work in accordance with the provisions of the contract documents, whether or not such work is fabricated, installed, or completed. However, neither this authority of the RPR nor a decision made in good faith either to exercise or not exercise such authority shall give rise to a duty or responsibility of the RPR to the Contractor, subcontractor(s), their agents, employees, or other persons performing portions of the work. 1.7 Contractor will pay for laboratory and field testing including quality control and quality assurance testing. Assist the City in reviewing the quality assurance laboratories and/or field testing services proposed by the Contractor for quality assurance testing. RPR will coordinate factory witness testing, when required, between the Contractor, City, and Engineer. 1.8 Assist in the transfer of and acceptance by the Contractor of City furnished equipment or materials and spare parts by the Contractor to the City. 1.9 Assist the City in obtaining legal releases, permits, warranties, spare parts, and keys from the Contractor. Review and comment on the certificate of completion and the recommendation for final payment to the Contractor. Recommend to the City the dates of substantial completion and final completion and assist the City in scheduling startup and use of the complete facility. The RPR will obtain required manuals, guarantees, record drawings, and other documentation from the Contractor and deliver to the Engineer for review and for delivery to the City. 2 General Construction Administration Phase Services: 2.1 North Holly Water Treatment Plant Sedimentation Basin Sludge Removal System Replacement 2.1.1 The Engineer's responsibility to provide Basic Services, as set forth herein, for the Construction Phase of the Project under this Agreement commences with the award of the Contract Amendment No. 3 and terminates at the end of the construction period defined in the contract documents for the Project including associated testing and startup services identified in this Contract. 2.1.2 Construction Phase duties, responsibilities, and limitations of the Engineer shall not be restricted, modified, or extended without agreement of the City and Engineer in writing. 2.1.3 The Engineer shall be a representative of and shall advise and consult the City during construction. The Engineer shall have the authority to act on behalf of the City only to the extent provided in this Agreement unless otherwise modified by written instrument. 2.1.4 Engineer's Personnel at Construction Site 2.1.4.1 The presence of the Engineer's personnel at a construction site is for the purpose of providing the Engineer and the City a greater degree of confidence that the completed work will conform generally to the contract documents and that the integrity of the design concept, as reflected in the contract documents, has been implemented and preserved. 2.1.5 Pre-construction Conference 2.1.5.1 The Construction Manager shall participate in one (1) pre-construction conference for the Project. Meeting shall be conducted with the City and Contractor at the City's facility. At a minimum, the following items shall be discussed at the pre-construction conferences: 2.1.5.1.1 The construction schedules prepared by the Contractor. 2.1.5.1.2 Schedule of Values and Payment Procedures and Schedules. 2.1.5.1.3 Designation of key personnel and their duties. 2.1.5.1.4 Procedures for the construction administration of the project. 2.1.6 Construction Manager Site Visits 2.1.6.1 The Construction Manager shall visit the construction site, when construction is in progress, to become familiar with the progress and quality of the work and to determine if the work is being performed in a manner that indicates that the work, when completed, will be in accordance with the contract documents. The number of site visits shall not exceed twelve (12) for the Project. 2.1.6.2 Additional site visits beyond those listed will be an Additional Service. 2.1.6.3 In addition, on the basis of these on-site observations as a Construction Manager, the Construction Manager shall keep the City informed of the progress and quality of the work and shall exercise reasonable care and due diligence in discovering and promptly reporting to the City defects or deficiencies of the Contractor or any subcontractor. Notify the Contractor, who is defined as that person or company that has entered into a contract with the City to complete the Project, of non-conforming work observed on site visits. 2.1.6.4 The City's approval, acceptance, use of, or payments for all or any part of Engineer's services hereunder or the project itself shall in no way alter the Engineer's obligations or the City's rights hereunder. 2.1.7 Construction Manager Participation at Construction Progress Meetings 2.1.7.1 The Construction Manager will participate in up to twelve (12) monthly construction progress meetings for the Project, the same day as the site visits. 2.1.7.2 The Construction Manager will prepare and distribute agendas and meeting notes for each meeting. 2.1.7.3 Additional meetings beyond those listed will be an Additional Service. 2.1.8 The Construction Manager will send Submittals to the Engineer. 2.1.9 The Construction Manager will send RFI's and CMRs to Engineer and coordinate RFI responses and Proposed Contract Modifications (PCMs) The fee is based on processing up to 25 RFIs and PCMs. 2.1.10 Construction Manager will: • Administer Contract Modification Requests in accordance with the General Conditions and Supplementary Conditions in the Contract Documents. Process contract modifications and negotiate with the Contractor on behalf of the City to determine the cost and time impacts of these changes. Prepare change order documentation for approved changes for execution by the City. • Document and prepare field orders, where cost to City is not impacted. • Receive and evaluate notices of Contractor claims and make recommendations to the City on the merit and value of the claim on the basis of information submitted by the Contractor or available in project documentation. Endeavor to negotiate a settlement value with the Contractor on behalf of the City if appropriate. Providing these services to review or evaluate Contractor's claims(s), supported by causes not within the control of Engineer are an Additional Service. 2.1.11 The fee is based on the shop drawing reviews, RFIs, and CMRs listed above. If additional reviews are necessary, due to incomplete submittals, or multiple review iterations, and if the RFIs and requested changes are beyond the estimated amounts, such that the combined budgeted fee for these items is exceeded, this will be considered an Additional Service. Substitutions of materials or equipment or design modifications requested by the City are an Additional Service. 2.1.12 Substantial and Final Review 2.1.12.1 The Construction Manager will conduct, in the company of the City's Project Manager, a substantial completion review of the project for conformance with the design concept of the project and general compliance with the contract documents and provide a list of deficiencies to the Contractor. 2.1.12.2 The Construction Manager will conduct, in the company of the City's representative, a final review of the project for conformance with the design concept of the project and general compliance with the contract documents and verify that items identified on the deficiency list from the substantial completion review have been completed. 2.1.13 Record ("As-built") Drawings 2.1.13.1 The Construction Manager will coordinate with the Engineer for preparation of Record Drawings in accordance with the information furnished by the Contractor and the RPR reflecting changes to the project made during construction. 2.2 Construction Manager will request that the Contractor furnish a red-lined original or copy of the as-builts used to prepare the record drawings o so oci o LLI uj 2 / ; } }IM 2IL { \ ) , { )LLI { to ' ] k ) ( ) fEE :Nq \ k _ � ! < : = - : , o / LLJ Vl li cli � � § \ ko ! § � ) - J ca , 3 ( BE / § k % , f ) 2 ( - / \ \ LU a \ 0 q § \ ® \ / .� . . . . . . . . . . . . . . / _ .�. . . . . . . . . . . .. . / I § /e = « ) -5o : ) $a tJ : ! ! § ) [ ) !! § / ) ) ) } ! ] ! \ IE - } k - § { § ! # ® ) / E ) { \ ]] § ) ) � / _ � ) { { kl32 : ) ) / 2m `! // S . A to \ ( \ ` g ) \ / \ ] j \ /eeg ] lB : BlB : : ! ! § \ / ` 0 0 / EXHIBIT B ALAN PLUMMER ASSOCIATES, INC. HOURLY FEE SCHEDULE 2019 Staff Description Staff Code Range of Billing Rates Admin Staff Al-A3 $ 80.00 - $ 100.00 Senior Admin Staff A4 $ 95.00 - $ 125.00 Designer/Technician Cl-C2 $ 56.00 - $ 103.00 Designer/Technician III C3 $ 95.00 - $ 125.00 Senior Designer/Technician C4 $ 110.00 - $ 150.00 Electrical Engineer E1 $115.00 - $165.00 Senior Electrical Engineer E2 $200.00 - $280.00 Engineer/Scientist Intern ESO $ 50.00 - $ 75.00 Engineer-in-Training/Scientist-in-Training ES1-ES2 $ 80.00 - $115.00 Engineer-in-Training/Scientist-in-Training III ES3 $ 100.00 - $135.00 Project Engineer/Scientist ES4 $120.00 - $150.00 Senior Project Engineer/Scientist ES5 $140.00 - $185.00 Project Manager ES6 $170.00 - $225.00 Senior Project Manager ES7 $195.00 - $270.00 Principal I ES8 $250.00 - $305.00 Principal II ES9 $300.00 - $390.00 Construction Manager in Training (CMIT) CM 1 - 3 $ 50.00 - $ 120.00 Construction Manager CM 4 -CM 6 $ 118.00 - $198.00 Sr. Construction Manager CM 7 -CM 8 $ 166.00 - $ 250.00 Resident Project Rep. I RR1 $ 50.00 - $ 90.00 Resident Project Rep. II RR2 $ 70.00 - $ 110.00 Resident Project Rep. ill RR3 $ 85.00 - $ 128.00 Lead Resident Project Rep. RR4 $ 102.00 - $ 150.00 Billing rates are based on "salary cost'times a multiplier of 2.3. Salary cost is based on direct payroll costs times 1.43. Salary cost includes direct payroll costs, payroll taxes, vacation, holiday,sick leave,employee insurance,and other fringe. Range of billing rates shown may be adjusted by up to 4 percent annually(at the beginning of each calendar year)during the term of this agreement. The multipliers shown will not be adjusted. A multiplier of 1.10 will be applied to all direct expenses. A technology charge will be billed at$5 per labor hour. M3.29_2019 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 4/9/2019 -Ordinance No. 23632-04-2019 and Resolution No. 5073-04-2019 DATE: Tuesday, April 9, 2019 REFERENCE NO.: **C-29090 LOG NAME: 60NHWTPSBSR-BARCON SUBJECT: Authorize Execution of Amendment No. 3 in the Amount of$393,152.00 to City Secretary Contract No. 50006 an Engineering Agreement with Alan Plummer Associates, Inc.,to Provide for Inspection Services, for a Revised Contract Amount of$1,151,233.00, Authorize Execution of a Contract with Bar Constructors, Inc., in the Amount of$7,528,000.00 for the North Holly Water Treatment Plant Sedimentation Basin Sludge Removal System Replacement, Provide for Project Costs for a Project Total in the Amount of $9,093,069.00, Adopt Resolution Expressing Official Intent to Reimburse Expenditures with Proceeds of Future Debt and Adopt Appropriation Ordinance (COUNCIL DISTRICT 9) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached Resolution Expressing Official Intent to Reimburse Expenditures with Proceeds of Future Debt for the North Holly Water Treatment Plant Sedimentation Basin Sludge Removal System Replacement Project; 2. Adopt the attached Appropriation Ordinance increasing estimated receipts and appropriations in the Water& Sewer Commercial Paper Fund in the amount of$8,307,069.00 for the North Holly Water Treatment Plant Sedimentation Basin Sludge Removal System Replacement; 3. Authorize the execution of Amendment No. 3 in the amount of$393,152.00 to City Secretary Contract No. 50006 to provide for inspection services for the North Holly Water Treatment Plant Sedimentation Basin Sludge Removal System Replacement (City Project No. CO2328); and 4. Authorize the execution of a contract with Bar Constructors, Inc., in the amount of$7,528,000.00 for the North Holly Water Treatment Plant Sedimentation Basin Sludge Removal System Replacement (City Project No. CO2328). DISCUSSION: This Mayor and Council Communication provides for the construction of the North Holly Water Treatment Plant Sedimentation Basin Sludge Removal System Replacement project. On November 7, 2017, (M&C C-28464), the City Council authorized an engineering agreement in the amount of$688,037.00 with Alan Plummer Associates, Inc., for the North Holly Water Treatment Plant Sedimentation Basin Sludge Removal System Replacement. The agreement was subsequently revised by Amendment No. 1 in the amount of$16,005.00 administratively authorized July 31, 2018 and Amendment No. 2 in the amount of$54,039.00 administratively authorized November 19, 2018. Amendment No. 3 will allow Alan Plummer Associates, Inc., (APAI)to provide inspection services during construction of the project. Staff considers the proposed fee to be fair and reasonable for the scope of services proposed. Construction of the project was advertised for bid on January 3, 2019 and January 10, 2019 in the Fort http://apps.cfwnet.org/ecouncil/printme.asp?id=26850&print=true&DocType=Print 4/10/2019 Worth Star-Telegram. On February 14, 2019 the following bids were received: BIDDER AMOUNT TIME OF COMPLETION Bar Constructors, Inc. 17$7,528,000.00 IF 365 Calendar Days Felix Construction Company $9,675,297.00 In addition to the contract cost, $160,077.00 is required for Project Management, City inspection and material testing and $225,840.00 is provided for project contingency. This project is anticipated to be included in a future revenue bond issue for the Water and Sewer Fund. Available cash within the Water and Sewer portfolio and the City's portfolio along with the appropriation authority authorized under the Callable Commercial Paper Program (CP) will be used to provide interim financing for this project until debt is issued. To the extent resources other than the Water and Sewer portfolio are used to provide interim financing, the Water and Sewer Fund will be charged interest that is equivalent to the overall rate of return being earned by the City portfolio (currently approximately one- percent annually). Should the City's portfolio not support the liquidity needed to provide an interim short- term financing source, another funding source will be required, which could mean issuance of securities under the CP Program or earlier issuance of Water and Sewer revenue bonds than is currently planned. Once debt associated with this project is sold, bond proceeds will be used to reimburse the Water and Sewer portfolio and the City's portfolio in accordance with the attached Reimbursement Resolution. The City Council adopted the Water Department's Fiscal Year 2018-2022 Five Year Capital Improvement Plan on September 26, 2017. This City Council adopted plan includes this specific project, with funding identified through the CP program to be reimbursed with future revenue bonds. In accordance with the provisions of the Financial Management Policy Statement, Staff anticipates presenting revenue-supported debt issuances to the City Council for consideration within the next three years. This debt must be issued within approximately three years to provide reimbursement for these expenses. If that does not occur, the costs will no longer be reimbursable by issuing tax-exempt debt and the funding source will have to be made whole through budgetary methods. Adoption of this resolution does not obligate the City to sell bonds, but preserves the ability to reimburse the City from tax-exempt bond proceeds. Construction is anticipated to commence in May, 2019 and be completed by May, 2020. MWWBE OFFICE: Bar Constructors, Inc., is in compliance with the City's BDE Ordinance by committing to 6 percent MBE participation on this project. The City's MBE goal on this project is 5 percent. Additionally, Bar Constructors, Inc., is a certified MWWBE firm. APAL A waiver of the goal for MBE/SBE subcontracting requirements was requested by the Department and approved by the MWBE Office, in accordance with the MWBE or BDE Ordinance, because the purchase of goods or services is from sources where subcontracting or supplier opportunities are negligible. The project is located in COUNCIL DISTRICT 9. FISCAL INFORMATION /CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the Water&Sewer Commercial Paper Fund for the North Holly Water Treatment Plant Sedimentation Basin Sludge Removal System Replacement Project. The Water and Sewer Commercial Paper Fund includes authority of$150,000,000.00 for the purpose of providing interim funding for Water and Sewer Capital Projects. After this transfer, the balance will be $39,942,578.00 for future capital projects. Funding for the North Holly Water Treatment Plant Sedimentation Basin Sludge Removal System Replacement project is as depicted below: httn://anns.cfwnet.org/ecouncil/nrintmc_asn?id=26950&nrint=true&DocTvne=Print 4/10/2019 Existing Additional FUND Appropriations Appropriations Project Total* W&S Capital Project 2018 - $786,000.00 $0.00 Fs 786,000.00 Fund 56014 W&S Commercial Paper- $0.00 $8,307,069.00 $8,307,069.00 —IF Fund 56016 Project Total $786,000.00 $8,307,069.00 $9,093,069.00 * Numbers rounded for presentation. FUND IDENTIFIERS (FIDs): TO Fund; Department ccoun Project IProgramlActivity Budget Reference# moun ID ID Year (Chartfield 2) FROM Fund Department Accoun Project Program Activity Budget Reference# moun ID ID Year Chartfield 2 CERTIFICATIONS: Submitted for City Manager's Office by: Jay Chapa (5804) Originating Department Head: Chris Harder (5020) Additional Information Contact: Dena Johnson (7866) ATTACHMENTS 1. 60NHWTPSBSR-BARCON Compliance Barcon.pdf (CFW Internal) 2. 60NHWTPSBSR-BARCON FID Table (Carol).docx (CFW Internal) 3. 60NHV TPSBSR-BARCON Form 1295 APAI 2019-455428 Redacted.pdf (Public) 4. 60NHWTPSBSR-BARCON Form 1295 BarCon 2019-455054 Redacted.pdf (Public) 5. 60NHV TPSBSR-BARCON Map.pdf (Public) 6. 60NHV TPSBSR-BARCON SAM APAI.pdf (CFW Internal) 7. 60NHV TPSBSR-BARCON SAM Barcon.pdf (CFW Internal) 8. 60NHV TPSBSR-BARCON Waiver APAI.pdf (CFW Internal) 9. 60NHV TPSBSR-BARCON- REIMB RESOLUTION.docx (Public) 10. 60NHV TPSBSR-BARCON 56016 A019r.docx (Public) httn://anus.cfwnet.org/ecouncil/nrintmc.asn?id=26850&print=true&DoeTvne=Print 4/10/2019 p O O O O O O O uN1 O O V Ln O ri M �Li Ln M 00' cn 00 m m -1 n cnm 00 R n N N N N N N O Cn Vocn Lrl M 00 00 00 00 m 00 cn cn cn cn cn m rn Ln Ln Ln Ln Ln Ln Ln V V V V V U U V 00 00 00 00 00 00 00 W N N N N N N N M M M M M m cn • V V V V V • V U d O O O m Om cc 0 O m 14 o v v �o O m y F' M .i m R m cn R 0 m M m Ln LL Z o 0 0 0 0 0 0 0 v v v v a v cnv � o 0 0 0 0 0 0 0 m m m m m m m m mo 0 0 0 0 0 0 0 N m m m m m m m m S p lD