NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: OFF-SITE WATER MAIN IMPROVEMENTS
City Project No.: 101562
Improvement Type(s): Water ® Sewer ❑
Original Contract Price: $900,609.00
Amount of Approved Change Order(s):
Revised Contract Amount:
Total Cost of Work Complete: $900,609.00
�r� Apr 19, 2019
Jacob Gatewoo Apr 19,2019)
Contractor Date
Project Manager
Title
Conatser Construction TX,L.P.
Company Name
EI�I�O�A%0,Apr23,2019) Apr 23, 2019
Eustorgio An rade Jr(Apr 23,2019)
Project Inspector Date
PabriaK SuaKlev Apr 23, 2019
Patrick Buckley(Apr 23,2019)
P 'ect Man�e���2a.�,� Date - - --
Apr 23, 2019
J e scarlett Morales(Apr 23,2019)
-A Manager Date
Susan Ala n is(Apr 26,2019)
Apr 26, 2019
Asst. City Manager Date
Page 1 of 2
OFFICIAL RECORD
CITY SECRETARY
t:r_ wnaTH_ Tx
Notice of Project Completion
Project Name: OFF-SITE WATER MAIN IMPROVEMENTS
City Project No.: 101562
City's Attachments
Final Pay Estimate 0
Change Order(s): ❑ Yes 0 N/A
Pipe Report: 0 Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety ,
Statement of Contract Time
Contract Time: 90 CD Days Charged: 79
Work Start Date: 1/1/2019 Work Complete Date: 4/2/2019
Page 2 of 2
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name OFF-SITE WATER MAIN IMPROVEMENTS
Contract Limits
Project Type WATER
City Project Numbers 101562
DOE Number 1562
Estimate Number 1 Payment Number 1 For Period Ending 4/3/2019
CD
City Secretary Contract Number Contract Time 9111)
Contract Date Days Charged to Date 79
Project Manager NA Contract is 100.00 Complete
Contractor CONATSER CONSTRUCTION TxLP
5327 WICHITA ST
FORT WORTH, TX 76119
Inspectors OWEN / ANDRADE
Wednesday,April 3,2019 Page 1 of 4
City Project Numbers 101562 DOE Number 1562
Contract Name OFF-SITE WATER MAIN IMPROVEMENTS Estimate Number I
Contract Limits Payment Number I
Project Type WATER For Period Ending 4/3/2019
Project Funding
WATER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
---------------------------------------
1 DUCTILE IRON WATER FITTINGS 14.91 TN $4,500.00 $67,095.00 14.91 $67,095.00
W/RESTRAINT
2 6"PVC WATER PIPE 31 LF $36.00 $1,116.00 31 $1,116.00
3 6"GATE VALVE 2 EA $1,050.00 $2,100.00 2 $2,100.00
4 8"PVC WATER PIPE 122 LF $40.00 $4,880.00 122 $4,880.00
5 8"GATE VALVE 4 EA $1,250.00 $5,000.00 4 $5,000.00
6 12"PVC WATER PIPE 969 LF $50.00 $48,450.00 969 $48,450.00
7 12"GATE VALVE 4 EA $2,400.00 $9,600.00 4 $9,600.00
8 16"PVC DR18 WATER PIPE 5691 LF $76.00 $432,516.00 5691 $432,516.00
9 16"DIP WATER 582 LF $106.00 $61,692.00 582 $61,692.00
10 16"GATE VALVE WNAULT 9 EA $14,500.00 $130,500.00 9 $130,500.00
11 24"STEEL CASING BY OTHER THAN OPEN CUT 205 LF $370.00 $75,850.00 205 $75,850.00
12 FIRE HYDRANT 2 EA $4,500.00 $9,000.00 2 $9,000.00
13 CONCRETE ENCASEMENT FOR UTILITY PIPES 32.6 CY $200.00 $6,520.00 32.6 $6,520.00
14 CONNECTION TO EXISTING 36"WATER MAIN 1 EA $9,500.00 $9,500.00 1 $9,500.00
15 2"COMBINATION AIR RELEASE VALVE 2 EA $6,500.00 $13,000.00 2 $13,000.00
WNAULT
16 WATER SAMPLING STATION 6 EA $1,500.00 $9,000.00 6 $9,000.00
17 TRENCH SAFETY 7395 LF $2.00 $14,790.00 7395 $14,790.00
--------------------------------------
Sub-Total of Previous Unit $900,609.00 $900,609.00
--------------------------------------
Wednesday,April 3,2019 Page 2 of 4
City Project Numbers 101562 DOE Number 1562
Contract Name OFF-SITE WATER MAIN IMPROVEMENTS Estimate Number I
Contract Limits Payment Number I
Project Type WATER For Period Ending 4/3/2019
Project Funding
Contract Information Summary
Original Contract Amount $900,609.00
Change Orders
Total Contract Price $900,609.00
Total Cost of Work Completed $900,609.00
Less %Retained $0.00
Net Earned $900,609.00
Earned This Period $900,609.00
Retainage This Period $0.00
Less Liquidated Damages
Days @ /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $900,609.00
Wednesday,April 3,2019 Page 3 of 4
City Project Numbers 101562 DOE Number 1562
Contract Name OFF-SITE WATER MAIN IMPROVEMENTS Estimate Number I
Contract Limits Payment Number I
Project Type WATER For Period Ending 4/3/2019
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors OWEN / ANDRADE Contract Date
Contractor CONATSER CONSTRUCTION TxLP Contract Time 90 CD
5327 WICHITA ST Days Charged to Date 79 CD
FORT WORTH, TX 76119 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
-------------------------------------- -
Total Cost of Work Completed $900,609.00
Less %Retained $0.00
Net Earned $900,609.00
Earned This Period $900,609.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $900,609.00
Wednesday,April 3,2019 Page 4 of 4
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: Off-Site Water Main Improvements(Walsh Ranch PA-2)
PROJECT NUMBER: 101562
DOE NUMBER: N/A
WATER
PIPE LAID SIZE TYPE OF PIPE LF
DR18 16" PVC 5691
DR18 12" PVC 969
DR18 8" PVC 122
DR18 611 PVC 31
DIP 16" DIP 582
FIRE HYDRANTS: 2 VALVES(16" OR LARGER) 9
PIPE ABANDONED SIZE TYPE OF PIPE LF
None
DENSITIES: Passed
NEW SERVICES: None
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
None
PIPE ABANDONED SIZE TYPE OF PIPE LF
None
DENSITIES: N/A
NEW SERVICES: None
TRANSPORTATION AND PUBLIC WORDS
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
a
(817)392-7941 •Fax: (817)392-7845
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a Notary Public in the state and county aforesaid,
on this day personally appeared Brock Huggins, President of Conatser Management Group, Inc.,
general partner of Conatser Construction TX LP, known to me to be a credible person, who
being by me duly sworn,upon his oath deposed and said:
That all persons, firms, associations, corporations or other organizations furnishing
labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of Fort Worth, has
been paid in full;and
That there are no claims pending for personal injury and/or property damages;
On Contract described as:
WALSH RANCH QUAIL VALLEY
PLANNING AREA 2 (WS-5)
OFF-SITE WATER MAIN IMPROVEMENTS
IMPROVEMENTS
DOE#: N/A
CFA PRJ#:N/A
CITY PROJCT #: 101562
CITY OF FORT WORTH
STATE OF TEXAS
CONATSER CONSTRUCTION TX,LP
Brock Huggins
Subscribed and sworn to before me this 12th day of April
BERTHA GIANULIS
�: Notary Public,State of Texas ✓
=a^ JP\ My Commission Expires Notary Public in 'arrant County, Texas
;'FaC ' September 18, 2019
j
CONSENT OF OWNER ❑
SURETY COMPANY ARCHITECT ❑
CONTRACTOR ❑
TO FINAL PAYMENT SURETY ❑
Conforms with the American Institute of OTHER
Architects,AIA Document 6707
Bond No 0219492
PROJECT:
(name, address)Walsh Ranch Quail Valley Planning Area 2
Fort Worth,TX
TO (Owner)
QUAIL VALLEY DEVCO Il,LLC AND THE CITY OF —1 ARCHITECT'S PROJECT NO:city Project No,101562
FORT WORTH CONTRACT FOR:
8401 N. Central Expressway,Suite 350 Off-Site Water Main Im rovements to Serve Walsh Ranch Quail Valley
Planning Area 2(WS-5f
Dallas TX 75225 --J CONTRACT DATE:
CONTRACTOR:CONATSER CONSTRUCTION TX,L.P.
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above,the
(here insert name and address of Surety Company)
BERKLEY INSURANCE COMPANY
475 Steamboat Road
Greenwich CT 06830 , SURETY COMPANY
on bond of !here insert name and address of Contractor)
CONATSER CONSTRUCTION TX,L.P.
5327 Wichita St.
Fort Worth TX 76 1 1 9-6035 , CONTRACTOR,
hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its obligations to (here insert name and address of Owner)
QUAIL VALLEY DEVCO ii,LLC AND THE CITY OF FORT WORTH
8401 N. Central Expressway,Suite 350
Dallas TX 75225 , OWNER,
as set forth in the said Surety Company's bond.
IN WITNESS,WHEREOF,
the Surety Company has hereunto set its hard this 9th day Of April,2019
BERKLEY INSURANCE COMPANY
Surety Company
Attest: paboiiw
(Seal): Signature of Authorized Representative
J-ft�
Robbi Morales Attome -in-Fact
Title
NOTE: This form is to be used as a companion document to ALA DOCUMENT 6706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS,
Current Edition
ONE PAGE
No.BI-7280j
POWER OF ATTORNEY
0
BERKLEY INSURANCE COMPANY
WILMINGTON,DELAWARE
NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully.
KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly
organized and existing under the laws of the State of Delaware having its CZ
g g g' principal office in Greenwich,CT,has made, constituted
and appointed, and does by these presents make, constitute and appoint: Ricardo J. Reyna,Don E Cornell; Sophinie Hunter;
.n .E Robbi Morales;Kelly A. Westbrook; Tina McEwan;Joshua A. Saunders; or Tonie Petranek of Aon Risk Services Southwest,
'-'Inc. of Dallas, TX its true and lawful Attorney-in-Fact, to sign its name as surety only as delineated below and to execute, seal,
n, -°acknowledge and deliver any and all bonds and undertakings,with the exception of Financial Guaranty Insurance providing that no
single obligation shall exceed Fifty Million and 00/100 U.S. Dollars (U.S.$50,000,000.00), to the same extent as if such bonds
had been duly executed and acknowledged by the regularly elected officers of the Company at its principal office in their own
in
proper persons.
a�
This Power of Attorney shall be construed and enforced in accordance with, and governed by,the laws of the State of Delaware,
o >without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following
resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January 25,2010:
• c
RESOLVED,that,with respect to the Surety business written by Berkley Surety,the Chairman of the Board,Chief Executive
Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant Secretary are
chereby authorized to execute powers of attorney authorizing and qualifying the attorney-in-fact named therein to execute
y bonds,undertakings,recognizances, or other suretyship obligations on behalf of the Company,and to affix the corporate seal
cof the Company to powers of attorney executed pursuant hereto; and said officers may remove any such attorney-in-fact and
a..� revoke any power of attorney previously granted;and finther
wRESOLVED,that such power of attorney limits the acts of those named therein to the bonds,undertakings,recognizances,or
.0 other suretyship obligations specifically named therein,and they have no authority to bind the Company except in the manner
> and to the extent therein stated;and further
fl RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-in-fact named; and
A further
O to
a,.5 RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any
power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or
u 3 other suretyship obligation of the Company;and such signature and seal when so used shall have the same force and effect as
though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any
o person or persons who shall have been such officer or officers of the Company,notwithstanding the fact that they may have
ceased to be such at the time when such instruments shall be issued.
c c 1N WITNESS WHEREOF, the Com any has caused these presents to be signed and attested by its appropriate officers and its
o x corporate seal hereunto affixed this of MAkC4 1'9
Attest: Berkle Insurance Compan
o (Seal) By r By
o Ira: . Lede an Jef;•e tler
W Executive Vice President&Secretary en o i •esident
U O
o0 C- WARNING:THIS POWER INVALID IF NOT PRINTED ON BLUE"BERKLEY"SECURITY PAPER.
STATE OF CONNEMCUT)
O ) ss:
o COUNTY OF FAMMLD }
o
Sworn to before me,a Notary Public in the State of Connecticut,this2 day of 4&9dJt l�{ , by ira S. Lederman
and Jcf€rey M. Rafter who are sworn to me to be the Executive Vice Pre 'de and 5ecretaryy, n the Senior Vice President,
respectively,of Berkley insurance Comparf$ARIA C.RUNDBAKEN
Q NOTARY PUBLIC
i o MY COMMISSION EXPIRES otary Public,State of Connecticut
APRIL30,2019
z CERTIFICATE
I,the undersigned,Assistant Secretary of BERKLEY INSURANCE COMPANY,DO HEREBY CERTIFY that the foregoing is a true, correct
iX and complete copy of the original Power of Attorney;that said Power of Attorney has not been revoked or rescinded and that the authority of the
3 Attorney-in-Fact set forth therein,who executed the bond or undertaking to which this Power of Attorney is attached,is in full force and effect as
"of this date.
Given under my hand and seal of the Company,this 9th day of April o 19
(Seal)
Ainent .Forte