Loading...
HomeMy WebLinkAboutContract 51200-CO2 CITY SECRETARY CONTRACT NO. FORTWORTH. City of Fort Worth Change Order Request Project Namel Campbell Street From Crenshaw Avenue to Avenue J City Sec# 1 51200 Client Project#(s)i 100733 Project This project includes the design and the reconstruction of Campbell Street from Ave J to Crenshaw Avenue. Description Contractorl JLB Contracting,LLC Change Order# �� Date 4/24/2019 City Project Mgr.1 Maged Zaki City Inspector Adilda Cazorla Dept. Water Sewer TPW Contract Time Totals WD Original Contract Amount $139,599.95 $69,086.50 $1,098,223.03 $1,306,909.48 180 Extras to Date $17,460.45 $17,460.45 25 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $139,599.95 $69,086.50 $1,115,683.48 $1,324,369,93 205 Amount of Proposed Change Order $0.00 $31416.00 $0.00 $31,416.00 30 Revised Contract Amount $139,599.95 $100,502.50 $1,115,683.48 $1,355,785.93 235 Original Funds Available for Change Orders $0,00 Remaining Funds Available for this CO $0,00 $0.00 $0.00 Additional Funding(if necessary) $31,416.00 $31,416.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 3,74010 MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $1,633,636,85 JUSTIFICATION(REASONS)FOR CHANGE ORDER Water Depriament requested to replace the 24"Manholes with 30".We have 7 nos of 24"and one rectangular manhole 24"x40"need to be replaced.That includes Ring,Cover,and Cones,The price does not include vacuum testing or any other repairs on these manholes that go below the cone. VoRr Attested by Te� -,7j" % Mary J. fWsef, City Secretary *i It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. ContracEor'sCompmy Name Contractor Name Canlradl6lgnatara Date JLB oniraudiig LLC Aaron Porez A-- .,e -� 11+24,2011� I s ec laspection Su ervi o ate ProWct Manager/Program M na er Date r'Assistant Director(Dept) Da Di ctor,Contripft Department(Dept) Date /al/is A sf A4prney Date Assistant City Manager Date Council Action if required) M&C Number M&C Date Approved ilL FT. WORTH, Tx Fox,�_rx City of Fort Worth Change Order Additions Project Name Campbell Street From Crenshaw Avenue to Avenue J City Sec# 51200 Client Project# 100733 Project Description This project includes the design and the reconstruction of Campbell Street from Ave J to Crenshaw Avenue. Contractor JLB Contracting,LLC I Change Order# F2 Date 4/24/2019 City Project Mgr. Maged Zak! City Inspector Adllda Cazorla ADDITIONS Unit Unit Cost Total Unit 16 Remove 24"Ring,Cover,and Cone and replace with 30"Ring,Cover,and Con Sewer 7.00 EA T3 57-5. 17 Remove 24"x 40"Ring,Cover,and Cone.Replace with 30"Ring,Cover,and C Sewer 1.00 EA ,575.00 18 Remove and Replace Curb in areas where MH are to be dug out Sewer 6 .00 LF $44.05 Water $0.00 Sewer $31,416.00 TPW $0.00 Sub Total Additions $31,416.00 Change Order Additions Page 1 of 3 FoxT WOR M City of Fort Worth I--- Change Change Order Deletions Project Name Campbell Street From Crenshaw Avenue to Avenue J City Sec# 51200 Client Project# 100733 Project Description This project includes the design and the reconstruction of Campbell Street from Ave J to Crenshaw Avenue. Contractor JLB Contracting,LLC Change Order# L� Date F 4/24/2019 City Project Mgr. Maged Zaki City Inspector F77dilda Cazorla DELETIONS ty Unit Unit Cost Total Water $0.00 Sewer $0.00 TPW $0.00 Sub Total Deletions 0. Change Order Deletions Page 2 of 3 MWWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO N/A Total $0.00 Previous Change Orders CO# DATE AMOUNT None Total $0.00 Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirement Maged Zaki Graduate Engineer, PMP a 0MOAL RECORD CITY SECRETARY FT. WORTH,7X