Loading...
HomeMy WebLinkAboutContract 50749-AD2 CITY SECRETARY �GCCIVED CONTRACT NO. 50749—A bo1 A MAC �� 2019 Cl SECRt V SECOND ADDENDUM TO CITY SECRETARY CONTRACT NO. 50749 This Second Addendum to City Secretary Contract Number 50749 ("Second Addendum") is by and between the City of Fort Worth("City'), a home-rule municipality organized under the laws of the State of Texas, acting by and through its duly authorized Assistant City Manager, and Unified Fine Arts Services, L.L.C. acting by and through Victor Bissonette, its Principle (the "Contractor"). The City has designated the Arts Council of Fort Worth & Tarrant County, Inc., to manage this contract on its behalf. WHEREAS, the City and Contractor entered into City Secretary Contract Number ("CSC No.") 50749, whereby Contractor agreed to provide specific services for the purpose of assisting with the care and maintenance of the Public Art Collection, which was subsequently renewed through June 1,2019,under CSC No. 50749-R2(collectively,the"Agreement"); WHEREAS, City is in need of services as specified in this Second Addendum (collectively"Services"); WHEREAS, City owns and maintains a public Artwork titled Intimage Apparel&Pearl Earrings ("Artwork") by Donald Lipski ("Artist"), which is sited in the Fort Worth Convention Center located at 1200 Houston Street, 76102 ("Site") (Council District 9) and a description of which is attached hereto as Exhibit"C"and incorporated herein for all purposes; WHEREAS, City agrees to provide an appropriate lift for Contractor use to clean and inspect the Artwork and; WHEREAS, the City and Contractor wish to set out the additional Services to be provided per the Agreement that will be specific to this Second Addendum and this Artwork with the intent that further Services may be requested by the City through future addenda; NOW, THEREFORE, in consideration of the mutual covenants and agreements hereinafter set forth,the sufficiency of which is hereby acknowledged,the parties agree as follows: 1. The Services to be performed by the Contractor for this Second Addendum are set forth in the Contractor's Proposal ("Contractor's Proposal"), which is attached hereto as Exhibit "D" and incorporated herein for all purposes, and includes all labor, travel, equipment rental and any other expenses required to complete the Services for this Artwork. 2. Contractor covenants and agrees to fully perform, or cause to be performed, with good faith and due diligence, as needed services.("Services") to be performed at the direction of the Contract Manager and in accordance with this Second Addendum, which shall be executed in accordance with the Agreement and incorporated herein for all purposes. Services shall be performed in a professional, workman-like manner and in strict compliance with all terms and conditions in this Agreement. 3. Existing conditions hidden or concealed and not available for reasonable visual observation discovered during Services will be reported promptly to the Contract Manager prior to commencing any further Services. OFFICIAL RECORID; Second Addendum to CSC 50749 CM SECRETARY Execution Copy4R9119 F` . !l1 ORTHo TX a � 4. In consideration of the Services to be performed under i his Second Addendum, the City agrees to pay the Contractor the actual costs for services in an amount up to Two Thousand, Eight Hundred and Seventy-Five Dollars and No Cents ($2,875.00) in accordance with the terms of Article 4 of the Agreenttv. Any amounts paid in this Second Addendum shall be credited towards the total amount paid under the current Agreement renewal term. 5. Contractor shall coordinate with the City to coordinate the required schedule and availability to access the Site. 6. Contractor shall provide in its final report any information related to the Services provided under this Second Addendum, including before and after documentation noting areas of concern and recommendations. 7. Contractor shall take such measures as are necessary to protect the Artwork from loss or damage,including,without limitation,purchasing and maintaining the insurance required in Article 7 of the Agreement. 8. All terms and conditions of the Agreement not specifically addressed herein remain in full force and effect and are binding upon the parties. IN WITNESS WHEREO the partie- re o have executed four copies of this Second Addendum in Fort Worth,Texas,on day of 312019 CITY OF FORT WORTH UNIFIED FIN E ARTS SERVICES,LLC By: � By: Jesus J.Chapa Victor 13issonette Assistant City Manager Princip 1 e CONTRACT COMPLIANCE MANAGER By signing,i acknowledge that 11 am the person responsible for th monitoring and administration of this contract,including e ring all performance and reporting requirements. Jen fer Conn,bklic Art Collection Manager,Arts Council of Fort Wor h PRO D AS TO FORM AND L GALITY: Jessica a svan Sen r As ' t City Attorney Form 1295 /A ATTES �` iC}a Mary J.Kayser, ec et1: No M&C required ��XAS OFFICIAL RECORD Second Addendum to CSC 50749 QT(SECRETARY Exemaim Co"4n9/'9 FT WORTH,TX EXHIBIT C The Artwork *t i 1 gel 4_ M ' 16 ■ Intimate Apparel&Pearl Earrings by Donald Lipski Second Addendum to CSC 50749 3 of 4 Execution Copy 4/29/l9 EXHIBIT D Contractor's Proposal `4 WSW Tx 7624-ewe UNIFIED w4~01 FINE ARTS trgoMww oo I ESTIMATE AQOPIESB ESTItdAM0 e6" Fftwo mp"AAOavow" DATE 001@019 .WMW OW Iwo ftn*a FOR WOW TX MU UM GATE ACTrYMY :t, RATE oval,019 LSbr 2,96000 i e60 O0 Uftof&MOi WWft(paMdN9OlQNe1g9.Aerandck�, Ow d�9M0 /i- 11LpSWOONSMMFMWard, CiCiN1tN11rON cow.11r MW ow■ w tlN Naomi'.har aoarolDr Pout Mb99M■r9sObeam10o n9rb"IN9MKnilu,g OW ovoic*b*M"cows 009CONOC "hove the , -a $1ea9r aw"M ipP1001(Irrl kj iron IMID It M hwhOpIW@ moM NO 10SE1610 waftfODWAInrt a! ow ,d 9r CONgow I tWS am IWONO 10110 ONO,,it that ; twom w 9r pmoft OOIIOI,-Upw 1anSM APOea a ftod 6ONYlp' Mass" 91rMrSSNOAOpt 042NM9 N11OelOM , 299M Tw t7wt 4sw,,r I Roma PAY7MWARE NET 16.EwnNMwedbr40dw TOTAL $2,675.00 A 9eON0O de9gNd ri p►NIgM�rIM!s dwpd m tprOlOp eol p9W wNW ad Clops d Ywobe OOIO.q OIOMWO pO1t Mret w ONOOOOMy �eat ENNPPWved•91r d eNolet�ThO t>frt rNoroe�ee heleOoNNolrM9a NNd rlNtrlrsa�Ot000wPiNNrpgrA. wOwstp anOowo■yenrd0>,M pnorNd ACOOPMO a AcOWwd Dwa Second Addendum to CSC 50749 4 of 4 Execution Copy 4/29/19