HomeMy WebLinkAboutContract 52275 CITY SECRETARY - I
gree
CONTRACT NO. 3L, P ge In of 3
SECTION 00 52 43
AGREEMENT FOR EMERGENCY REPAIR SERVICES
THIS AGREEMENT is made by and between The City of Fort Worth, a Texas home rule municipality acting by
and through its duly authorized City Manager, ("City"), and WILLIAM J. SCEFULTZ, INC., DB/A CIRCLE
"C" CONSTRUCTION COMPANY, a corporation authorized to do business in Texas, acting by and through
its duly authorized representative ("Contractor"). City and Contractor, in consideration of the mutual covenants
hereinafter set forth, agree as follows:
Article 1.WORK
Contractor shall abandon (fill with grout)the existing 10-inch vitrified clay sanitary sewer main M-34 and fill the
annular space of the tunnel of the existing 24-inch PVC deep sewer DSL-7R* and perform additional asphalt
pavement repairs, as needed, to prevent further pavement failures and settlement in 71" St. from Commerce Street
to Houston Street.
Article 2.PROJECT
On April 23, 2019, Water Field Operations was informed of a large void underneath the pavement of 7" St.
between Commerce Street and Main Street. Field Operations investigated the area and discovered that soil was
entering thtu the previously abandoned 10-inch M-34 and also thru the annular space of the tunnel for the 24-inch
DSL-7R*. The Contractor will mobilize April 29"' and excavate an 8-foot diameter shaft at the location of the
pavement settlement. This shaft will allow access for the Contractor to fully grout and completely abandon the
old 10-inch M-34 and properly grout the annular space of the tunnel for DSL-7R*. Current estimated
construction completion is May 3,d,2019.TPW Traffic has approved the permit for traffic control.
Article 3. CONTRACT TIME
Time is of the essence.
Contractor recognizes that time is of the essence, and the Contractor will be required to remain on the jobsite until
the work is completed. The City expects the Contractor to have a sense of urgency to complete the Work in a
timely manner.
Article 4. CONTRACT PRICE
City agrees to pay Contractor for performance of the Work based on Contractor's invoice an amount up to Three
Hundred Thousand Dollars($300,000.00) This figure may be amended up or down as final invoices are received.
Article 5. CONTRACT DOCUMENTS
CONTENTS:
The Contract Documents which comprise the entire agreement between City and Contractor concerning
the Work consist of the following:
1. This Agreement.
2. Exhibits to this Agreement:
a. Approved Invoice
b. Evidence of Current Insurance
c. Current Prevailing Wage Rate Table incorporated by reference.
3. General Conditions incorporated by reference
_1FiOA9.RECORD
CIV SECRETARY
Emergency Agreement - Emergency Response - annular space void under 71h Street ET WORTH,TX
-2
Agreement
Page 2 of 3
Article 6.INDEMNIFICATION
6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense,the city,
its officers, servants and employees, from and against any and all claims arising out of, or alleged to
arise out of, the work and services to be performed by the contractor, its officers, agents, employees,
subcontractors, licenses or invitees under this contract. This indemnification provision is specifically
intended to operate and be effective even if it is alleged or proven that all or some of the damages
being sought were caused, in whole or in part, by any act, omission or negligence of the city. This
indemnity provision is intended to include,without limitation,indemnity for costs, expenses and legal
fees incurred by the city in defending against such claims and causes of actions.
6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the city, its
officers,servants and employees,from and against any and all loss,damage or destruction of property
of the city, arising out of, or alleged to arise out of, the work and services to be performed by the
contractor, its officers, agents, employees, subcontractors, licensees or invitees under this contract.
This indemnification provision is specifically intended to operate and be effective even if it is alleged
or proven that all or some of the damages being sought were caused, in whole or in part, by any act,
omission or negligence of the city.
Article 7.MISCELLANEOUS
7.1 Terms.
Terms used in this Agreement which are defined in Article 1 of the General Conditions will have the
meanings indicated in the General Conditions.
7.2 Assignment of Contract.
This Agreement, including all of the Contract Documents may not be assigned by the Contractor without
the advanced express written consent of the City.
7.3 Successors and Assigns.
City and Contractor each binds itself, its partners, successors, assigns and legal representatives to the other
party hereto, in respect to all covenants,agreements and obligations contained in the Contract Documents.
7.4 Severability.
Any provision or part of the Contract Documents held to be unconstitutional, void or unenforceable by a
court of competent jurisdiction shall be deemed stricken, and all remaining provisions shall continue to be
valid and binding upon CITY and CONTRACTOR.
7.5 Governing Law and Venue.
This Agreement, including all of the Contract Documents is performable in the State of Texas. Venue shall
be Tarrant County, Texas, or the United States District Court for the Northern District of Texas, Fort Worth
Division.
7.6 Other Provisions.
The Contractor agrees to pay at least minimum wage per hour for all labor as the same is classified,
promulgated and set out by the City.
Emergency Agreement - Emergency Response - annular space void under 7th Street
-3
Agreement
Page 3 of 3
7.7 Authority to Sign.
Contractor shall attach evidence of authority to sign Agreement, if other than duly authorized signatory of
the Contractor.
IN WITNESS WHEREOF, City and Contractor have signed this Agreement in multiple counterparts. At least
one counterpart of each has been delivered to City and Contractor.
This Agreement will be effective on the date subscribed by the City's designated Assistant City Manager(which
is the Effective Date of the Agreement).
City of Fort Worth
Contractor: WILLIAM J.SCHULTZ,INC.,
D/B/A CIRCLE"C" CONSTRUCTION
COMPANY
B :
Jay Chapa
By: Assistant City Manager
(Signature)
i to l l
Title: President Date
Teresa Skelly
(Printed Name)
Attest: /01 C>
tty Sec as c i
Address: t
(Seal)
City/State/Zip: Approved as to Form and Legality:
Date Ova!
Douglas W.Blac c
Senior Assistant City Attorney
M&C N/A
Date N/A
APPROVAL RECOMMENDED:
C�7 /V I
Chris Harder,P.E.
Director, Water Department
CITY SECRETARY
Emergency Agreement - Emergency Response - annular space void under 711 Street FT. WORTH, l` K
N N o
h h
F �h
H �wW
FW UhN o
04 to
3� r
aQ Fhb �
wE Wok a o
�o
IId M
II
—
glplolp
,101
tlt 0
tlf �
tit
g
s
g6
I ela I
� I a �
® oo o
gs
III �g O
'ZS NO.LSl2oH— — —
b —
_ ICI
plplpl
1I
141
III
s
- ' p�n:
C I �03:C•+OYa w }- 4 .n j2 r4sia...
Mr
h >
o " , v.
I••P - NI cMS9 L42t6nv}
rn V'> £�'809 LQ13S418 L,.@
rIr. F 31 "INON
r
_ � �f1Hd F . w�— 1 103t Ia3n lON 41d301
F g4 +� -,. INwbVVNn la bl ✓
fYMONMN11 Hid
a0}' + W
12'
{",.
CID
.T
ail 0 1' I h N xao waois an y
�I
v W rwov
I � f
'SL
cyMCVwn w1Lmf
fly//. - -
iqi��.-��T
iW f
¢
f ,
I' 1i n
s_+aals aba3 nog • i l ,
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
Signature
Name of Employee
Title
CITY
FT.WCJR rv"T,K