Loading...
HomeMy WebLinkAboutContract 52275 CITY SECRETARY - I gree CONTRACT NO. 3L, P ge In of 3 SECTION 00 52 43 AGREEMENT FOR EMERGENCY REPAIR SERVICES THIS AGREEMENT is made by and between The City of Fort Worth, a Texas home rule municipality acting by and through its duly authorized City Manager, ("City"), and WILLIAM J. SCEFULTZ, INC., DB/A CIRCLE "C" CONSTRUCTION COMPANY, a corporation authorized to do business in Texas, acting by and through its duly authorized representative ("Contractor"). City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1.WORK Contractor shall abandon (fill with grout)the existing 10-inch vitrified clay sanitary sewer main M-34 and fill the annular space of the tunnel of the existing 24-inch PVC deep sewer DSL-7R* and perform additional asphalt pavement repairs, as needed, to prevent further pavement failures and settlement in 71" St. from Commerce Street to Houston Street. Article 2.PROJECT On April 23, 2019, Water Field Operations was informed of a large void underneath the pavement of 7" St. between Commerce Street and Main Street. Field Operations investigated the area and discovered that soil was entering thtu the previously abandoned 10-inch M-34 and also thru the annular space of the tunnel for the 24-inch DSL-7R*. The Contractor will mobilize April 29"' and excavate an 8-foot diameter shaft at the location of the pavement settlement. This shaft will allow access for the Contractor to fully grout and completely abandon the old 10-inch M-34 and properly grout the annular space of the tunnel for DSL-7R*. Current estimated construction completion is May 3,d,2019.TPW Traffic has approved the permit for traffic control. Article 3. CONTRACT TIME Time is of the essence. Contractor recognizes that time is of the essence, and the Contractor will be required to remain on the jobsite until the work is completed. The City expects the Contractor to have a sense of urgency to complete the Work in a timely manner. Article 4. CONTRACT PRICE City agrees to pay Contractor for performance of the Work based on Contractor's invoice an amount up to Three Hundred Thousand Dollars($300,000.00) This figure may be amended up or down as final invoices are received. Article 5. CONTRACT DOCUMENTS CONTENTS: The Contract Documents which comprise the entire agreement between City and Contractor concerning the Work consist of the following: 1. This Agreement. 2. Exhibits to this Agreement: a. Approved Invoice b. Evidence of Current Insurance c. Current Prevailing Wage Rate Table incorporated by reference. 3. General Conditions incorporated by reference _1FiOA9.RECORD CIV SECRETARY Emergency Agreement - Emergency Response - annular space void under 71h Street ET WORTH,TX -2 Agreement Page 2 of 3 Article 6.INDEMNIFICATION 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense,the city, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licenses or invitees under this contract. This indemnification provision is specifically intended to operate and be effective even if it is alleged or proven that all or some of the damages being sought were caused, in whole or in part, by any act, omission or negligence of the city. This indemnity provision is intended to include,without limitation,indemnity for costs, expenses and legal fees incurred by the city in defending against such claims and causes of actions. 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the city, its officers,servants and employees,from and against any and all loss,damage or destruction of property of the city, arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licensees or invitees under this contract. This indemnification provision is specifically intended to operate and be effective even if it is alleged or proven that all or some of the damages being sought were caused, in whole or in part, by any act, omission or negligence of the city. Article 7.MISCELLANEOUS 7.1 Terms. Terms used in this Agreement which are defined in Article 1 of the General Conditions will have the meanings indicated in the General Conditions. 7.2 Assignment of Contract. This Agreement, including all of the Contract Documents may not be assigned by the Contractor without the advanced express written consent of the City. 7.3 Successors and Assigns. City and Contractor each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, in respect to all covenants,agreements and obligations contained in the Contract Documents. 7.4 Severability. Any provision or part of the Contract Documents held to be unconstitutional, void or unenforceable by a court of competent jurisdiction shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon CITY and CONTRACTOR. 7.5 Governing Law and Venue. This Agreement, including all of the Contract Documents is performable in the State of Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the Northern District of Texas, Fort Worth Division. 7.6 Other Provisions. The Contractor agrees to pay at least minimum wage per hour for all labor as the same is classified, promulgated and set out by the City. Emergency Agreement - Emergency Response - annular space void under 7th Street -3 Agreement Page 3 of 3 7.7 Authority to Sign. Contractor shall attach evidence of authority to sign Agreement, if other than duly authorized signatory of the Contractor. IN WITNESS WHEREOF, City and Contractor have signed this Agreement in multiple counterparts. At least one counterpart of each has been delivered to City and Contractor. This Agreement will be effective on the date subscribed by the City's designated Assistant City Manager(which is the Effective Date of the Agreement). City of Fort Worth Contractor: WILLIAM J.SCHULTZ,INC., D/B/A CIRCLE"C" CONSTRUCTION COMPANY B : Jay Chapa By: Assistant City Manager (Signature) i to l l Title: President Date Teresa Skelly (Printed Name) Attest: /01 C> tty Sec as c i Address: t (Seal) City/State/Zip: Approved as to Form and Legality: Date Ova! Douglas W.Blac c Senior Assistant City Attorney M&C N/A Date N/A APPROVAL RECOMMENDED: C�7 /V I Chris Harder,P.E. Director, Water Department CITY SECRETARY Emergency Agreement - Emergency Response - annular space void under 711 Street FT. WORTH, l` K N N o h h F �h H �wW FW UhN o 04 to 3� r aQ Fhb � wE Wok a o �o IId M II — glplolp ,101 tlt 0 tlf � tit g s g6 I ela I � I a � ® oo o gs III �g O 'ZS NO.LSl2oH— — — b — _ ICI plplpl 1I 141 III s - ' p�n: C I �03:C•+OYa w }- 4 .n j2 r4sia... Mr h > o " , v. I••P - NI cMS9 L42t6nv} rn V'> £�'809 LQ13S418 L,.@ rIr. F 31 "INON r _ � �f1Hd F . w�— 1 103t Ia3n lON 41d301 F g4 +� -,. INwbVVNn la bl ✓ fYMONMN11 Hid a0}' + W 12' {",. CID .T ail 0 1' I h N xao waois an y �I v W rwov I � f 'SL cyMCVwn w1Lmf fly//. - - iqi��.-��T iW f ¢ f , I' 1i n s_+aals aba3 nog • i l , Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Signature Name of Employee Title CITY FT.WCJR rv"T,K