Loading...
HomeMy WebLinkAboutContract 50572-CO3 CITY "SECRETAR FORTWORTH City of Fort Worth CONTRACTNO., 5057a—Co3 or"VASO' Change Order Request Project Name Concrete Restoration 2018-1 at various locations City Sec# 1 50572 Client Project#(s)[— Project Concrete Restoration 2018-1 contract provides for the repair and reconstruction of failed concrete pavement. Description Contractorl Westhill Construction,Inc. Change Order# Date 4/19/2019 City Project Mgr.J Juan Pablo De La Cruz City Inspector F Matt Cain Dept. TPW-Storm Contract Time Water Totals CD Original Contract Amount $711,497.00 $711,497.00 165 Extras to Date $28,030.50 $28,030.50 10 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $739,527.50 $739,527.50 175 Go to ADD&DEL Tabs to Enter CO Backup $0.00 170 Revised Contract Amount $739,527.50 $739,527.50 345 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 3.94 0 MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $889,371.25 ttM—TION PWASCW FOR CHWE ORDER Change order No.3 is required for the following additional items: •Additional 90 days for new concrete pavement replacement of three streets added to the contract by M&C(C-29023)approved on 2/5/2019. •Additional 33 days for sub grade issues encountered at Saint Christian Street. •Additional 47days for added concrete panel replacement and drivew, 4F F�f�T�'b A A. Y• ; �° ary Ja Kayser, City Se �XP►� It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Contractor's Company Nam=e = Contractor Name -- Contract signature Date Westhill Construction, Inc. e ns ectio Su sor µ ate Pro'e ager/Pro rare Mafia er. -; 01 �-- Assistan Directo pt) to irect r,Contracti e rtment(Dept) Dat Assi of ' ttorn bate Ssistant City M ag 5 t ! Council Action if red iced) 1�77177177177TF7 M&C Number C 29023 ,YyZ3rs-M&C Date Approved 5 1TY SECRE R `Y FT. WORM TX FORT WORTH City of Fort Worth Change Order Additions Project Name Concrete Restoration 2018-1 at various locations City Sec# 50572 Client Project# Project Description Concrete Restoration 2018-1 contract provides for the repair and reconstruction of failed concrete pavement. Contractor Westhill Construction,Inc. Change Order# 0 Date 4/19/2019 City Project Mgr. Juan Pablo De La Cruz City Inspector Matt Cain ADDITIONS Unit Unit Cost I ota TPW-Storm Water $0.00 Sub Total Additions $1.001 Change Order Additions Page 2 of4 FOR_ rR rH City of Fort Worth Change Order Deletions Project Name Concrete Restoration 2018-1 at various locations City Sec# 50572 Client Project# Project Description Concrete Restoration 2018-1 contract provides for the repair and reconstruction of failed concrete pavement. Contractor Westhill Construction,Inc. Change Order# 0 Date 4/19/2019 City Project Mgr. Juan Pablo De La Cruz City Inspector F Matt Cain DELETIONS ty unit Unit Cost Total TPW-Storm Water $0.00 Sub Total Deletionst—�o Change Order Deletions Page 3 of4 MWWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO N/A Total $0.00 Previous Change Orders Co# DATE AMOUNT None Total $0.00 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Juan Pablo De La Cruz / Name of Employee/Signature Project Manager Title 0 This form is N/A as No City Funds are associated with this Contract Printed Name Signature E ECORDETARYH,TX City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 2/5/2019 DATE: Tuesday, February 5, 2019 REFERENCE NO.: **C-29023 LOG NAME: 2000NCRETE RESTORATION 2018-1 CHANGE ORDER NO.3 SUBJECT: Authorize Execution of Change Order No. 3 to City Secretary Contract No. 50572 with Westhill Construction, Inc., to Rehabilitate Additional Sections of N. Main Street, Southcrest Drive and Townsend Drive at No Additional Cost and Authorize 90 Additional Calendar Days for the Completion of the Contract (COUNCIL DISTRICTS 2 and 9) RECOMMENDATION: It is recommended that the City Council authorize Execution of Change Order No. 3 to City Secretary Contract No. 50572 with Westhill Construction, Inc., to rehabilitate additional sections of N. Main Street, Southcrest Drive, and Townsend Drive at no increase in contract cost and an extension of 90 calendar days for completion of the contract. DISCUSSION: On February 6, 2018, Mayor and Council Communication (M&C C-28568) awarded City Secretary Contract No. 50572 in the amount of$711,497.00 Westhill Construction, Inc., for Concrete Street Restoration 2018-1 at seven locations. (City Project No. 101293) The Concrete Restoration 2018-1 contract has approximately $200,000.00 remaining in available contract funds which may be used for additional rehabilitation work. Change Order No. 3 will add N. Main Street, Southcrest Drive, and Townsend Drive due to its existing deteriorated condition. These street sections were not included in the original contract and changes the scope of the project which requires City Council approval. This Change Order does not require an increase in the contract amount since remaining funds in the contract are available. The project's construction allowance will be required to cover the additional $2,500.00 for traffic control plan cost to complete this additional work. CONCRETE RESTORATION 2018-1 TREET NAME I�BLOCK LIMI F STREET LIMITS CD I MAPSCO MAIN STREET 4600-4849 1 MEACHAM BLVD-MEACHAM BLVD I� 2 - 48P OUTHCREST DRIVE 1 1900-1999 1 GORDON AVE-TOWNSEND DR 1 9 -r 90Q OWNSEND DRIVE 5200-5299-1 SOUTHCREST DR-FRAZIER AVE (-9F 90Q The project is located in COUNCIL DISTRICTS 2 and 9. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendation, funds are available in the current capital budget, as appropriated of the General Capital Projects Fund. Prior to an expenditure being incurred, the participating department has the responsibility to validate the availability of funds. Logname: 2000NCRETE RESTORATION 2018-1 CHANGE ORDER NO.3 Page I of 2 FUND IDENTIFIERS (FIDs): TO Fun Department ccoun Project JProgram ctivity Budget Reference # moun ID ID Year (Chartfield 2) FROM Fund Department ccoun Project JProgram ctivity Budget Reference # moun ID ID Year Chartfield 2) CERTIFICATIONS: Submitted for City Manager's Office by: Susan Alanis (8180) Originating Department Head: Steve Cooke (5134) Additional Information Contact: Juan Pablo De La Cruz (6747) ATTACHMENTS 1. 2018-1 Concrete Restoration CPN-101293 Map.pdf (Public) 2. Westhill 1295 for Concrete Restoration - 2019-442355 Redacted.pdf (Public) Logname: 2000NCRETE RESTORATION 2018-1 CHANGE ORDER NO.3 Page 2 of 2