HomeMy WebLinkAboutContract 51689-CO1 4 RECEIVED CITY SECRETARY FORTWORTH MAY 2 2 2019 CONTRACT NO. MY OF FORT WORTH CI7YS MEfAW CHANGE ORDER REQUEST Change Order# 001 Date F May 12,2019 Contract# CS-51689 Project Title CONTRACT FOR ASBESTOS ABATEMENT ACTIVITIES LOCATED AT PIONEER TOWER,3401 WEST LANCASTER BLVD. Project# ENV 18-05:PIONEER TOWER Funding(FID) 35005 0234100-100503 5330201-000884-999 Purchase Order# FW0203-0000000919 Project Description Asbestos Abatement Activity at Pioneer Tower,3401 West Lancaster Boulevard,Fort Worth,Texas Original Contract Amount $393,600.00 Extras To Date $0.00 Credits to Date $0.00 Contract Cost To Date $(276,313.15) Balance Contract Remaining $117,286.85 Amount of this Change Order $41,113.98 Revised Contract Amount $434,713.98 IN ACCORDANCE WITH THIS CHANGE ORDER,THE CONTRACTOR SHALL: Change Order#1 to City Secretary Contract No.51689 Contract with HP EnviroVision for additional costs incurred during initial phases of the asbestos removal activities.The amounts are listed below for each individual change order item: 1. HP to cut 42 holes(16"x 16")Into plaster ceiling on three sides of Tower Vestibule for the purpose of the scaffold contractor to install support beams for the scaffold erection of the exterior of the tower for various trades to perform work on the exterior.$10,906.00 2. HP to remove'700 SF of sheetrock ceiling with texture and—850 SF of two layers of floor the/black mastic from the five offices to the west of the Tower Vestibule to make way for the installation of the support listed in Item#1.$7,084.00 3. HP to abate an additional 750 SF of piaster/tat ceiling on three sides of Tower Vestibule for the scaffold contractor to install shoring up to the concrete deck.$15,679.00 4. Removal of black iron for access;and removal of abandoned duct/heater system within the area of scaffold shoring up to the concrete deck$5,233.00 S. Additional fencing installed for safety barrier area$2,221.34 6. Additional Bonding$4,080.64 All work to be performed in accordance with the Proposal specifications. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. Contractor's Name HP Ecological Services LLC dba HP EnviroVision Original Contract Time Ongoing Additional Approved Time to Date None Additional Time for This Change Order I Vo_ne`—�_ n Thomas Pallet,President Dag/�/ Project Manager Date 5-1131-1 Roger Grantham Environmental Manager Date Cody M.Whittenburg � - � , !� /fl /'9 Senior Assistant City Attorney Date �` n C� Christa Lopez-Reynolds / ;to I Assistant City Manager Date S� ek Valerie Washington M&C# C-28971 Action Date 12/11/2018 1295:2018 N CORDTARY, TX FORTWORTH. Change Order#001 Date: May 12, 2019 CSC# 51689 ATTEST: �M .: ar Ma J. Kayser is TEXT City Secretary Date Signed: /-zlh CSC # Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Roger Grantham / Name of Employee/Signature Environmental Supervisor Environmental Quality Division Code Compliance Department OFFICIAL RECORD CITY SECRETARY FT. WORTH,TX