CHANGE ORDER REQUEST
Change Order# 001 Date F May 12,2019 Contract# CS-51689
Project Title CONTRACT FOR ASBESTOS ABATEMENT ACTIVITIES LOCATED AT PIONEER TOWER,3401 WEST LANCASTER BLVD.
Project# ENV 18-05:PIONEER TOWER
Funding(FID) 35005 0234100-100503 5330201-000884-999
Purchase Order# FW0203-0000000919
Project Description Asbestos Abatement Activity at Pioneer Tower,3401 West Lancaster Boulevard,Fort Worth,Texas
Original Contract Amount $393,600.00
Extras To Date $0.00
Credits to Date $0.00
Contract Cost To Date $(276,313.15)
Balance Contract Remaining $117,286.85
Amount of this Change Order $41,113.98
Revised Contract Amount $434,713.98
IN ACCORDANCE WITH THIS CHANGE ORDER,THE CONTRACTOR SHALL:
Change Order#1 to City Secretary Contract No.51689 Contract with HP EnviroVision for additional costs incurred during initial phases of the asbestos removal
activities.The amounts are listed below for each individual change order item:
1. HP to cut 42 holes(16"x 16")Into plaster ceiling on three sides of Tower Vestibule for the purpose of the scaffold contractor to install support beams
for the scaffold erection of the exterior of the tower for various trades to perform work on the exterior.$10,906.00
2. HP to remove'700 SF of sheetrock ceiling with texture and—850 SF of two layers of floor the/black mastic from the five offices to the west of the
Tower Vestibule to make way for the installation of the support listed in Item#1.$7,084.00
3. HP to abate an additional 750 SF of piaster/tat ceiling on three sides of Tower Vestibule for the scaffold contractor to install shoring up to the
concrete deck.$15,679.00
4. Removal of black iron for access;and removal of abandoned duct/heater system within the
area of scaffold shoring up to the concrete deck$5,233.00
S. Additional fencing installed for safety barrier area$2,221.34
6. Additional Bonding$4,080.64
All work to be performed in accordance with the Proposal specifications.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents in full(both time and
money)for all costs arising out of,or incidental to,the above Change Order.
Contractor's Name HP Ecological Services LLC dba HP EnviroVision
Original Contract Time Ongoing
Additional Approved Time to Date None
Additional Time for This Change Order I Vo_ne`—�_
n
Thomas Pallet,President Dag/�/
Project Manager Date 5-1131-1
Roger Grantham
Environmental Manager Date
Cody M.Whittenburg � - � , !� /fl /'9
Senior Assistant City Attorney Date �` n C�
Christa Lopez-Reynolds / ;to I
Assistant City Manager Date S� ek
Valerie Washington
M&C# C-28971 Action Date 12/11/2018 1295:2018
N
CORDTARY, TX
FORTWORTH.
Change Order#001 Date: May 12, 2019 CSC# 51689
ATTEST:
�M .: ar
Ma J. Kayser is
TEXT
City Secretary
Date Signed: /-zlh CSC #
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible for the monitoring and
administration of this contract, including ensuring all performance and reporting
requirements.
Roger Grantham /
Name of Employee/Signature
Environmental Supervisor
Environmental Quality Division
Code Compliance Department OFFICIAL RECORD
CITY SECRETARY
FT. WORTH,TX