Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 46954-CO10
CITY SECRETARY . FORT WORTH.. City of Fort Worth CONTRACTNO.. bq� �© Change Order Request Breakdown Project Namel Runway Extension Project Runway 16R, 16L,and Taxiway A City Sec# 1 46954 Client Project#(s)l WFXN5100 Contractor Lane PM[—Brian Fawson Inspector Billy Jones Change Order Submittal# 10 Date 5/13/2019 Dept. Aviation Contract Time Totals CD Original Contract Amount $61,920,040.43 $61,920,040.43 791 Extras to Date S5,989,062.97 $5,989,062.97 107 Credits to Date $3,225,040.18 $3,225,040.18 0 Pending Change Orders(in M&C Process) $0.00 0 Contract Cost to Date $64,684,063.22 $64,684,063.22 898 Amount of Proposed Change Order $61,785.00 $61,785.00 Revised Contract Amount $64,745,848.22 $64,745,848.22 898 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) $61,785.00 $61,785.00 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 4.56% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $77,400,050.54 JOSTIPICATION (REASONS)FOR CHANGE 0RIDER Provide additional erosion control for perimeter road. Foer WogrH City of Fort Worth T Change Order Additions Project Name I Runway Extension Project Runway 16R,16L,and Taxiway A City Sec# 46954 Client Project# I WFXN5100 Contractorl Lane PM1 Brian Fawson Inspector.F Billy Jones Change Order Submittal# 10 Date 5113/2019 AUUI I IONS Unit Unit Cost Total via ion 10-2 INS[ALL GEUFABRIG UNDER RUCK GABION via ion 10-3 INS FALL 6"RUCK GABION BASKET via ion Aviation Aviation Aviation 61,785.00 uTotal Additions Change Order Additions Page 1 of 1 Fox TWO rm+ City of Fort Worth T Change Order Deletions Project Name Runway Extension Project Runway 16R,16L,and Taxiway A City Sec# 46954 Client Project# WFXN5100 Contractor Lane PM Brian Fawson Inspector Billy Jones Change Order Submittal# 10 Date 5113/2019 UELETIONS Unit unitCost Total Aviation 0.00 Sub I otal Deletions Change Order Deletions Page 1 of 1 City Sec#46954 Change Order#10 IN WITNESS WHEREOF, City and Contractor have each executed this Agreement to be effective as of the date subscribed by the City's designated Assistant City Manager ("Effective Date"). Contractor: The Lane Construction Corporation City of Fort Worth/3 / B �••.�. Fernando Costa By: Assistant City Manager (Signature) Date 5 28 l9 Brian Fawson Attest: (Printed Name) City Secr ary CJ. ;• Title: Project Engineer (Seal) , Address: .3ce,> 14feetr— /1 `31,c) "j. 4111- VJ©.t h , 7—X 7 6 13 7 Date: N/A Form 1295 No. N/A City/State/Zip: Contract Compliance Manager: / By signing, I acknowledge that I am the person responsible for the monitoring and Date administration of this contract, including ensuring all performance and reporting requirements. APPROVAL RECOMMENDED: Tyler Dale `William Welstead Airport Project Coordinator DIRECTOR, Aviation Approved as to Form and Legality: J B. Str g ty Assistant Ci A orney RE AFW Runway Extension y� CORD �, e, T'�R 11 Project No.00960 R'Ttj,TX F,ECEivED MAY 3 CITY OF FORT WORTH CITY S RTH City of Fort Worth ACCEPTANCE OF PREVIOUS DBE COMMITMENT FORM (for use with CHANGE ORDERS or AMENDMENTS greater than$50,000) To be Completed by City Project Manager Change Order(for Construction Contract) Y Project Name: City Project Number i Alliance Runway Extension Project Runway 16R, 16L, and C00960 Taxiway A City Project Manager . Contractor: Dakota Shaw&Tyler Dale Lane Construction City's DBE Project Goal: 23 % Original Amount of Contract: $61,920,040.43 Acceptea L)HL Commitment: 23 Total of Previous Change Orders: $2,764,042.02 Date of Last DBE Report: 6/1/2018 Amount for this Change Order: $61,785.00 Change Order#: 10 Revised Amount of Contract: $64,745,867.45 Date: 5/15/2019 E Language to be inserted in the M&C for this Contract t. E: Lane Construction agrees to maintain its initial DBE commitment of 23%that it made on the original r contract and extend and maintain that same DBE commitment of 23%to all prior change orders up to and inclusive of this Change Order No. 10. Therefore Lane Construction remains in compliance s with the City's BIDE Ordinance and attests to its commitment by its signature on the Acceptance of Previous DBE Commitment form executed by an authorized representative of its company. To be Completed by the Representative of the Cont for Brian Fawson Project Engineer Printed Signature Title u on d Signature/Date Lane Construction Company Name Contact Name (if different) 3001 Meacham Blvd Suite 215 bcfawson@laneconstruct.com Address E-mail address Fort Worth, TX 76137 214-551-2903 817-632-3777 City/State/Zip Phone number Fax Number 23% as of 5/15/2019 t DBE% Paid to Date Date City Project Manager has reviewed the work associated with this Change Order, considers it the same or similar to work in the original Contract, and recommends that the Contractor have the option to retain and confirm its existing SBE commitment. Dakota Shaw&Tyler Dale City Project Manager City Project Manager Signature Date ChangeAttach Complete Documentation and Forward to MIWBE office k To be • • • by • n ► a �� � �0 M/WBE Compliant Staff `J ID# DBE Current% Level via Last Report Rec'd C M/WBE Signature Date