Loading...
HomeMy WebLinkAboutContract 49494-A1 - CSJ #0902-90-050 District#02-Fort Worth Code Chart 64# 15000 Project: Veloweb shared-use path ��co 2���' Federal Highway Administration �N,1 oa�� CFDA Title: Highway Planning and J ��1 Construction �10O Rc�P CFDA No.:20.205 Not Research and Development CITY SECRETARY STATE OF TEXAS § CONTRACT NO. 4q 49 4_ A COUNTY OF TRAVIS § ADVANCE FUNDING AGREEMENT AMENDMENT# 1 THIS AMENDMENT is made by and between the State of Texas, acting through the Texas Department of Transportation, called the State, and City of Fort Worth, acting by and through its duly authorized officials, called the Local Government. WITNESSETH WHEREAS, the State and the Local Government executed a contract on July 13'h of 2017 to effectuate their agreement to develop the Fort Worth to Dallas Regional Veloweb shared-use path (trail) between Trinity Boulevard/Elm Street and the existing THE/DART CentrePort Station, and also connecting to River Legacy Trail in Arlington; and, WHEREAS, it has become necessary to amend that contract; NOW THEREFORE, in consideration of the premises and of the mutual covenants and agreements of the parties, the State and the Local Government do agree as follows: AGREEMENT 1. Description of Amended Items Article 4, Scope of Work, language is deleted in its entirety and replaced with the following: The scope of work for this LPAFA is described as the engineering/design and construction of the CentrePort Trail between River Legacy Trail in Arlington and the THE CentrePort Station (reference Attachment B-1, Project Location Map) and the preliminary engineering of the trail for the continuation from the THE/DART CentrePort Station eastward to the Tarrant/Dallas County boundary south of the THE railroad in order to connect the Veloweb Network segment in Irving and the Mike Lewis Park in Grand Prairie through Trinity Boulevard and Roy Orr Boulevard in order to connect Mike Lewis Trail (reference Attachment B-1, Project Location Map). - OFFICIAL RECO'r CITY SECRETAr FT. WORT 3 AFA-AFA-Amend Page 1 of 3 Revised 03 1 i CSJ#0902-90-050 District#02-Fort Worth Code Chart 64# 15000 Project:Veloweb shared-use path Federal Highway Administration CFDA Title:Highway Planning and Construction CFDA No.:20.205 Not Research and Development Article 8, Compliance with Accessibility Standards, language is deleted in its entirety and replaced with the following: All parties to this Agreement shall ensure that the plans for and the construction of all projects subject to this Agreement are in compliance with standards issued or approved by the Texas Department of Licensing and Regulation (TDLR) as meeting or consistent with minimum accessibility requirements of the Americans with Disabilities Act (P.L. 101-336) (ADA). Attachment A, Resolution or Ordinance, is updated by adding Attachment A-1, Resolution or Ordinance, which is attached to this amendment. Attachment B, Project Location Map, is deleted in its entirety, and replaced with Attachment B-1, Project Location Map, which is attached to this amendment. The map contains the limits in the revised scope of work. Attachment C, Project Budget Estimate and Source of Funds, is deleted in its entirety, and replaced with Attachment C-1, Project Budget Estimate and Source of Funds, which is attached to this amendment. Subtotal project costs increase from $2,470,000.00 to $3,500,000.00 ($1,030,000.00) and added Right of Way and Utilities costs. All other provisions of the original contract are unchanged and remain in full force and effect. 2. Signatory Warranty Each signatory warrants that the signatory has necessary authority to execute this agreement on behalf of the entity,represented. AFA—AFA_Amend .Page 2 of 3 Revised 03/23/16 CSJ#0902-90-050 District#02-Fort Worth Code Chart 64# 15000 Project: Veloweb shared-use path Federal Highway Administration CFDA Title:Highway Planning and Construction CFQA No.:20.205 Not Research and Development THIS AGREEMENT IS EXECUTED by the State and the Local Government in duplicate. O THE LOCAL GOVERNMp ATTEST- �, >` City of Fort Worth By City tecreta Fernando Costa XPe' _/. ' Assistant City Manager APPROVEDAS TO FORM AND LEGALITY APPROVAL ECOMMEN E By By Assistant City Attorney Ri and Zavala Diractor Park and Recreation Department Date• 4, gt\;at'� 14 THE S T`AT E OF TEXAS Whitnev'14alle Contract Support Section Director Texas Departmer t of Transportation 3 6 Date E CORDTARY,TX AFA—AFA_Amend Page 3 of 3 Revised 03/23/16 OSIG A/o . +'?+qt Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. YOMQ / —4X`� Nam of Empl ee/Signature L Title ❑ This form is N/A as No City Funds are associated with this Contract Printed Name Signature EOFFICIALCORDTARY',T X a CSJ #0902-90-050 District#02-Fort Worth Code Chart 64# 15000 Project:Veloweb shared-use path Federal Highway Administration CFDA Title: Highway Planning and Construction CFDA No.:20.205 Not Research and Development ATTACHMENT A-1 RESOLUTION OR ORDINANCE A Resolution NO.498"S-220118 A RESOLUTION AUTHORIZING THE EXECUTION OF AMENDMENT NO. 1 TO A LOCAL PROJECT ADVANCE.FUNDING AGREEMENT WITH THE TEXAS DEPARTMENT OF TRANSPORTATION (CITY SECRETARY NO. 49494) TO INCREASE THE CITY'S PARTICIPATION BY THE AMOUNT OF S179,"S AND TO INCREASE THE TOTAL FUNDING AGREEMENT AMOUNT TO 53s684,450.40 FOR THE DESIGN AND CONSTRUCTION OF THE CENTREPORT TRAIL PROJECT WHEREAS, the Congestion Mitigation and Air Quality Improvement (CMAQ) Program, administered by the Texas Department of Transportation, provides funding for surface transportation projects and other related efforts that contribute air quality improvements and provide congestion relief.; and WHEREAS, the City of Fort Worth and the Texas Department of Transportation C'TxDOT") entered into a Local Projeet Advance Funding Agreement (City Secretary No. 49494) for the division of costs and responsibilities associated with the design and construction of the Project,of which the City's share is S520,002.00;and WHEREAS, The City and TxDOT desire to amend the original Funding Agreement to increase the amount of the City's share by$179,998.00 and increase the total amount of the Funding Agreement to S3,684,450.00, with correlative increases by the other project participants for additional design of a connection to the Mike Lewis Trait in the City of Grand Prairie; NOW THEREFORE, DE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH,THAT: The City Manager is authorized to execute the Amendment No. 1 to Local Transportation Project Advance Funding Agreement with the Texas Department of Transportation(City Secretary No. 49494) Increasing the total amount of the Agreement to to S3,684,430.40 with a correlative increase the City's participation by the amount of S179,998.00 for a revised amount of City participation of$700,000.00 for the additional design of the Mike Lewis Trail Connection to the CentrePort Trail Project. Adopted:this E5+b day of September,2018. A717EAzi Mar ].kaiser t}—t City Secretary 1 AFA-LPAFA ShortGen.doc Page 1 of 4 Attachment A-1 CSJ #0902-90-050 District#02-Fort Worth Code Chart 64# 15000 Project:Veloweb shared-use path Federal Highway Administration CFDA Title: Highway Planning and Construction CFDA No.:20.205 Not Research and Development ATTACHMENT A-1 (CON'T) City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 9F259010 -Res Motion No.4984-09-2018 and 23414-09, 2018 DATE: Tuesday,September 25,2018 REFERENCE NO.: "G-19383 LOG NAME: 80CENTREPORT TRAIL_LPAFA AMENDMENT SUBJECT: Adopt Resolution Authorizing Execution of Amendment No.t to the Advance Funding Agreement with the Texas Department of Transportation for the CentrePort Trail Project(City Secretary Contract No.49494) for Additional Design of a Connection to the Mike Lewis Trail in the City of Grand Prairie which Increases the Contract Amount by$926,862.00,with City Participation Increased by the Amount of$179,%8.00 for a Revised Total Agreement Amount of$3,684,450.00,Authorize Acceptance of Additional State and Federal Funds,Authorize Transfer for City's Match,Accept Funds from the City of Grand Prairie,and Adopt Appropriation Ordinance(COUNCIL DISTRICT 5) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached Resolution authorizing the execution of Amendment No.1,in the amount of $926,862.00,to the Advance Funding Agreement with the Texas Department of Transportation for the CentrePort Trail Project(City Secretary Contract No.49494)to increase the total amount to$3,684.,450.1X1 with Federal Participation in the amount of 52,800,0W.00,lndVW State Participation in the amount of $184,450.00 and City Participation increased by$179,998-00 for a total amount of VW I)W.00; 2- Authorize the acceptance of additional$720,000.00 in federal funds contributing to CentrePort Trail Project through the Texas Department of Transportation; 3- Authorize the acceptance of additional$26,864-00 in state funds co►tribubng to CentrePort Trail Project through the Texas Department of Transportation; 4- Authorize the transfer of$89,998-00 from the General Capital Projects Fund towards the Cilys match; 5- Accept$90,000-00 from the City of Grand Prairie for use toward local match;and 6. Adopt the attached appropriation ordnance increasing estimated receipts and appropriations in the Grants Capital Pr*cts Federal Fund in the mount of$926,862.00. DISCUSSION: The purpose of this Mayor and Council Commrnicat-ron(M&C)is to adopt a Resolution authorizing the City Manager to execute Amendment No.1 to an Advance Funding Agreement(AFA)with the Texas Department of Transportation(TxDOT)(City Secretary Contract No..49494)_The Amendment details the responsibilities of both the City and TxDOT in the development of the project and includes additional AFA-LPAFA ShortGen.doc Page 2 of 4 Attachment A-1 CSJ #0902-90-050 District#02-Fort Worth Code Chart 64 # 15000 Project: Veloweb shared-use path Federal Highway Administration CFDA Title: Highway Planning and Construction CFDA No.:20.205 Not Research and Development ATTACHMENT A-1 (CON'T) design for the connection to the Mike Lewis Trail in the City of Grand Prairie. This M&C also authorizes acceptance of additional state and federal grant funds for the project,acceptance of funds from the City of Grand Prairie,appropriation of matching funds and transfer of funds for the City's match_ This project is a part of the Veloweb Trail Network of the North Central Texas Council of Governments, connecting the CentrePort Trail from its terminus at the THE CentrePort Station to the: 1)Mike Lewis Trail in Grand Prairie,and 2)future Veloweb Trail at the eastern county boundary south of THE Railroad. The City Council approved an Advanced Funding Agreement with TxDOT in the amount of$2,757,568.00 on June 20,2017(M&C G-18975 and M&C G-19040)for the engineering and construction of the CentrePort Trail between River Legacy Trait in Arlington and the THE CentrePort Station,which will also connect to the American Airlines Headquarters. This amendment is for the preliminary engineering of the trail for the continuation from the THE CentrePort Station eastward to the:1)Tarrant f Dallas County boundary south of the THE railroad in order to connect the Veloweb Network segment in Irving;and 2)Mike Lewis Park in Grand Prairie through Trinity Blvd.,and Roy Orr Blvd.,in order to connect Mike Lewis Trail_ An Interlocat Agreement(CSC No.50713)with the City of Grano!Prairie for its anticipated share of the design costs was administratively executed on May 2,2018. Terms of this agreement require the City of Grand Prairie contribute$90,000.00 for the local match. Indirect costs associated with the ability for the City to recapture costs associated with administering this program are not allowed under this agreement. Total appropriations for this amount of$926,862.00 are summarized below: Source Current Appropriations i Proposed Total :Federal Participation $2,080,000.001 $720,000.00i $2,800,000.00 .......... 11-ocal Participation* $520,002.00 $179,998.00* $700,000.00 State Participation $,157,586.00 $26,Sf4.0fl, $184,450.00', ...... - Total $2,757,588.00` $926,861001 $3,684,450.00j `City of Grand Prairie$90,000,00-1 General Capital Projects Fund Transfer$89,998.00. This project is located in COUNCIL DISTRICT 5. This contract will be with a governmental entity,state agency or public institution of higher education: Texas Department of Transportation. FISCAL INFORMATION=CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance,funds will be available in the Grants Capital Projects Federal Fund. This is a reimbursement grant. FUND IDENTIFIERS(FIDs): TO Fun_ Clepartenf ccountProject'Program ctivsty BudgetR�eference# ;Amount ID � I iD_ Year (Chartfseld 2j AFA-LPAFA ShortGen.doc Page 3 of 4 Attachment A-1 CSJ #0902-90-050 ." District#02-Fort Worth Code Chart 64# 15000 Project: Veloweb shared-use path Federal Highway Administration CFDA Title: Highway Planning and Construction CFDA No.:20.205 Not Research and Development ATTACHMENT A-1 (CON'T) CERTIFICATIONS: Submitted for City Manager's office by: Fernando Costa (6122) Orininatina Department Head: Richard Zavala (5711) Additional Information Contact: David Creek (5744) ATTACHMENTS 1. 0902-90-050 AFA-AFA Amend RDAFT.pdf (CFW Ndernal) 2- 80CENTREPORT TRAIL LPAFA AMENDMENT A018 31001r.docx (Pubic) 3. MAP Regional Trial Connections to CentrePort Updated(June 27 2016)Amendment.aclf (Pubic) 4. MC FID ATTACHMENT-CentrePorl Trail Amend No 1 As (CPN Intemal) 5. Resolution CentrePort Trail TX DOT Amendment 1(Rev9.07.18).docx (Pubic) AFA-LPAFA ShortGen.doc Page 4 of 4 Attachment A-1 CSJ#0902-90-050 District#02-Fort Worth Code Chart 64# 15000 Project:Veloweb shared-use path Federal Highway Administration CFDA Title:Highway Planning and Construction CFDA No.:20.205 Not Research and Development ATTACHMENT B-1 PROJECT LOCATION MAP Regional Trail Connections to CentrePort THE Station • d M t t CENTRE�ORI PtWimrwyftin-m•bi Irving Rock Island Rd Fort s Worth I a I, Arlington - ,Y srou r I I Grand Scope:0902-90-050 6 Prairie {� 411111111110ra+S an FmhA ti FpR WaT.N.r1�eq t;an.tvebn) 1'` + t..••..• "•.� _ --r.�— t.«.-. _ �.r s.d-FuMrA ti Fat wme(R.i.timr bv.«No) � i ' �•-.-T-.�-...� - � A �_ t.,i.. Tml 9-1-F-d d In&.W Pk.nw,•'QY ' t •,i�YV jI i-7Da)aN�W WbF Y W Grand ) ° t�o"o + i Pralrle - _ a VnatiK FYiM.tl w,seem. O r' +—Rr u— Mies — — r_ ',+fi r. L�cm-so 0 0.125 0.25 0.5 AFA-LPAFA_ShortGen.doc Page 1 of 1 Attachment B-1 CSJ#0902-90-050 District#02-Fort Worth Code Chart 64# 15000 Project:Veloweb shared-use path Federal Highway Administration CFDA Title: Highway Planning and Construction CFDA No.:20.205 Not Research and Development ATTACHMENT C-1 PROJECT BUDGET ESTIMATE AND SOURCE OF FUNDS Except for Indirect State Costs, all other costs will be allocated based on 80% Federal funding and 20% Local Government funding until the federal funding reaches the maximum obligated amount. The Local Government will then be responsible for 100% of the costs. Description Total Federal State Local Estimated Participation Partici ation Participation Cost t/1 Cost /° ost /o Cost Engineering (by Local $840,750 80% $672,600 % 0 0% 168,150 Government Environmental (by Local $299,250 0% $239,400 0% 0 0% 59,850 Government Right of Way (by Local $137,750 0% $110,200 % 0 0% 27,550 Government Utilities (by Local Government) $42,750 80% $34,200 % 0 0% 8,550 Construction (by Local $1,797,298 0% 1,437,838 0% 0 0% 359,460 Government Subtotal $3,117,798 2,494,238 0 623,560 Environmental Direct State Costs $15,750 80%il2,600 % 0 0% 3,150 Right of Way Direct State Costs $7,250 0% 5,800 0% 0 0% 1,450 Engineering Direct State Costs $44,250 0% 35,400 % 0 0% 8,850 Utility Direct State Costs $2,250 % 1,800 0% 0 0% 450 Construction Direct State Costs $312,702 0% 250,162 0% 0 00 62,540 Indirect State Costs 184,450 % 0 100% 184,450 % 0 TOTAL 3,684,450 2,800,000 184,450 700,000 Initial payment made by the Local Government to the State: $3,902.00 Payment to be made by the Local Government at execution of amendment: $9,998.00 Payment by the Local Government to the State before construction: $62,540.00 Estimated total payment by the Local Government to the State $76,440.00 This is an estimate. The final amount of Local Government participation will be based on actual costs. AFA-LPAFA_ShortGen.doc Page 1 of 1 Attachment C-1