HomeMy WebLinkAboutContract 49066-A2 CITY SECRETARY .
AMENDMENT No . 2 'ONTRACT MO.
TO CITY SECRETARY CONTRACT
WHEREAS, the City of Fort Worth (CITY) and Freese &
Nichols, Inc. , (ENGINEER) made and entered into City Secretary
Contract No. 49066, (the CONTRACT) which was authorized by M&C
C-28215 on the 2nd day of May, 2017 in the amount of
$195,413 . 00; and
WHEREAS, the contract was subsequently revised by
Amendment No. 1 in the amount of $226,336. 00 authorized May 1 ,
2018 (M&C C-28671) ; and
WHEREAS, the CONTRACT involves engineering services for
the following project:
Water Efficiency and Condition Assessment
Program (WECAP) .
WHEREAS, it has become necessary to execute Amendment
No.2 to the CONTRACT to include an increased scope of work and
revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and
through their duly authorized representatives, enter into the
following agreement, which amends the CONTRACT:
1 .
Article I of the CONTRACT is amended to include the
additional engineering services specified in a proposal dated
May 13, 2019 a copy of which is attached hereto and
incorporated herein. The cost to City for the additional design
services to be performed by Engineer totals $32,324 . 00 . (Water:
$16,162 . 00; Sewer: $16,162 .00)
2 .
Article II of the CONTRACT is amended to provide for an
increase in the fee to be paid to Engineer for all work and
services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall be
an amount of $454,073 . 00 .00
EFT
AL RECORD
ECRETARY
ORTH, TX
� �,� Page -1-
3 .
All other provisions of the Contract, which are not
expressly amended herein, shall remain in full force and
effect.
EXECUTED and EFFECTIVE as of the date last written by a
signatory, below.
APPROVED: ENGINEER
Ci For Worth Freese & Nichols, Inc.
sus J. Ch pa 'Thomas Haste/, -P.E.
Assistant City Manager Principal r
DATE: �/�/v DATE. . ; 12-d
APPROVAL RECOMMENDED:
eic X(. C
Chris Harder, P.E.
Director, Water Department
APPROVED AS TO FORM AND LEGALITY:
Contract Compliance Manager:
By signing, I acknowledge that I am the person
responsible for the monitoring and administration
of this contract, including ensuring all
performance and reporting requirements.
Name ,of Employee
�W g p 1<.a,d� M&C: N/A
Jdffn Kasavic , P.E.
Project Manager
Q690.2 Date:N/A
Douglas W. Black
Senior Assistant City Attorney s�..v
�'` � a 0,4
-s ,^
City Secretary f y���..�;qqJJ ff , MUAL RECORD
tt CITY SECRETARY
FT. WORTH,TX
Page -2-
f
FREESE
i Practical results
rm,.NCHOLS larkdIng service
4055 International Plaza,Suite 200 Fort Worth,Texas 76109 • 817-735-7300 • fax 817-735-7492 www.freese.com
May 13,2019
Mr.John Kasavich,P.E.
Project Manager
City of Fort Worth Water Department
311 West 101h Street
Fort Worth,TX 76102
Re: Water Efficiency and Condition Assessment Program(City Contract No.49066)Amendment No.2
FNI Project No. FTW17312
Dear Mr.Kasavich:
Freese and Nichols, Inc.(FNI) is providing this proposal for amendment of the Additional Services for the
Water Efficiency and Condition Assessment Program (WECAP).The WECAP program is a proactive asset
management approach that utilizes a support decision-making tool for identifying and prioritizing
inspection, rehabilitation and renewal strategies for raw water transmission, water distribution, and
wastewater collection pipelines. This amendment covers the development of a departmental asset
management policy. FNI will utilize sub-consultant AMCL for support in the development of the policy.
The additional scope includes the following tasks:
• Asset Management Policy Development
• Asset Management Executive Training Session
Contract Water Sewer Total
Original Contract Amount $ 195,413.00 $0.00 $ 195,413.00
Amendment No.1 Amount $92,206.00 $ 134,130.00 $226,336.00
Amendment No.2 Amount $16,162.00 $16,162.00 $32,324.00
Total Contract Amount $3030782.00 $150,292.00 $454,073.00
Freese and Nichols,Inc.appreciates this opportunity and we would like to meet with you to discuss
these additional services at your convenience.
Sincerely,
Je ca Brown,P.E.
Vice President
cc:File
Attachments:Amendment#2 Scope,Water Fee,Wastewater Fee,Schedule,Form 1295
L:\Resources\OLCR\F\Fort Worth\FTW17312\Amd#1\Amendment Letter.docx
rM NICHOLS FORTWORTH.
Fort Worth Water Department
An AMENDMENT#2 to the Water Efficiency and Condition Assessment Program Year 2
Scope of Services
4/18/2019
Project Understanding:
The Fort Worth Water Department (FWWD) has retained Freese and Nichols (FNI) to develop the Water
Efficiency Condition Assessment Program (WECAP). The WECAP program is a proactive approach that
utilizes a support decision-making tool for identifying and prioritizing inspection,rehabilitation and renewal
strategies for raw water transmission, water distribution, and wastewater collection pipelines. This
amendment covers the development of a departmental asset management policy. FNI will utilize sub-
consultant AMCL for support in the development of the policy.
WECAP Year 2 Amendment Scope of Work:
• FWWD Asset Management Policy Development
Task A.Asset Management Policy Development
A.1 Working Group Session 1: The FNI team will facilitate a working group session with FWWD's asset
management team to development the key asset management principles for inclusion and to
develop the draft policy. This session also includes developing a communication plan for releasing
the policy pending FWWD senior leadership approval.
A.2 Working Group Session 2: The FNI team will facilitate a working group session with the FWWD
senior leadership to review and comment on the draft policy and communications plan.
A.3 Finalize Asset Management Policy:Once comments are received and addressed,the FNI team will
finalize the policy and make available for inclusion into the FWWDs Asset Management Program.
A.4 Prepare Asset Management Policy portion of the WECAP Report:The FNI team will document and
include the asset management policy development portion of the overall WECAP project report.
A.5 Executive Training Session:The FNI team will conduct an executive training session (up to a half
day)for FWWD staff using the IAM principles and practices.
4/18/2019 Page 1 of 1 WECAP Year 2
EXHIBIT B-2
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
Water Efficiency Condition Assessment Program-Year 2 WATER FUNDS
City Project No.49066
Labor hours Ex
Task No. Task Description Principal Project Project EIT GIS r22
abor Subconsultant rise Total Expense Task Sub Total
Manager Engineer Analyst [ Travel Reprotluctlon Cost
Rate $281 $223 $176 E124 $90 MWBE Non-MWBE
A Year 2 Kickoff and Data Collection 6 8 3 6 2 $0 $10,500 $0 $215 $10,715 $15,637
Al Workina Group Session#1 1 2 7 1 27 $0 $4,000 $32 $4.032 $5,059
A2 Worklna Group Session#2 1 2 7 1 =$4.000 $32 $4.032 $4,883
A3 AnalaeAssetMana merit Policy 1 1 1 1 4 $38 $1,538 $2342
A4 Prepare Asset Management Policy portion of 1 1 1 2 8 $0 $0 $928
the WECAP Report
A5 Executive Trainin Session 2 2 1 2 12 $115 $1,115 $2427
Totals 6 8 3 6 2 $4,922 $215 $10,716 515,637
Water Line Footage Project Summary
Sewer Line Foota a Total Hours 25
0 0% Total Labor $4,922
Total Expense $10,715
(A) Total Fee $16 162 MBE/SBE Subcan-Rant $0
(B) Survey Fee $0 _ Nan-MBE/SBE Subconsultant $10,500
(C Total Fee-surve Fee $16,162 5% Sub Markup $525
Water Fee(50%af C) Sewer Fee(50%of C) MBE/SBE Partici aM1on 0.0%
$8,081.00 $8,081.00 Total Pro ect Cost $16,162.00
Description I WP I Water I Sewer
Conceptual Design(100%) $8,081.00 $8.08100
Preliminary Design(0%) $o 00 $0.00
Final Design
Survey(0%) $0.00 $0,00
Subtotal $8,081.00 $8.081.00
Total $16,162.00
EXHIBIT B-2
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
Water Efficiency Condition Assessment Program-Year 2 SEWER FUNDS
City Pr o'ect No.49066
Labor hours Ex nse
Task No. Task Description principal Profit project EIT GIS Total Labor Subconsultant Total Expense Task Sub Total
Manager Engineer Analyst Cost Travel Reproductlon Cos[
Rate $281 $223 $176 $124 $90 MWBE FN on-MWBE
A Year 2 Kickoff and Data Collection 6 8 3 6 2 $4,922 $0 $10,500 $0 $215 $10,715 $15,637
A.1 Working Group Session#1 1 2 1 1 $1,027 $0 $4,000 $32 $4,032 $5,059
A.2 Working Group Session#2 1 2 1 $851 $C $4,000 $32 $4,032 $4,883
A.3 Final¢e Asset Management Policy 1 1 I 1 $804 $0 $1,500 $38 $1538 $2.342
A 4 Prepare Asset Management Policy portion of 1 1 1 2 $928 $0 $0 $0 $0 $928
Me WECAP Report
A.5 Executive Trainin Session 2 2 1 2 $1,312 $0 $1,000 $115 $1,115 $2,427
Totals 6 8 3 6 1 2 $4,922 $0 $10,500 $0 $215 $10,715 $15,637
Water Line Footage Project Sum
Sewer Line Fooia is,. Total Hours 25
0 0% Total Labor $4,922
Total Ex a $10,715
(A) Total Fee $16,162 MBE/SBE,.bconsul[ant $0
(BJ Survey Fee $0 Non-MBE/SBE Subconsukant $10,500
(C Total Fee-surve Fee $16,162 5% Sub Markup $525
Water Fee(50%of C) Sewer Fee(50%pf CJ MBEJSBE Partici aeon 0.0%
$8.081.00 $8,081.00 Total Project Costj $16,162.00
Descnption WP Water Sewer
Conceptual oesisn 000-A
Desi $s.oal.00 as osl oo
Preliminary gn(0%) $0,00 1 $0.00
Final Design(0%) $0.00 1 Saw
Survey(0%) 1 $0.00 1 $aoo
Subtotal $8,081,00 1 $8,081.00
Total $16,162.00
® m
o
F a >
W
H
ate+
F � �
jy a
(r1
L Z
CL
O �
c
GJ 7
H 7J
Q v Y i
N d ;e ;e o ;e ;e ea ;e �e ;e �e ;e ;e ;e o ;e ;e o
O U a 000,o 000000000 o ;e o 00 o80.
}� O O ca O 0 0 0 0 0 0 0 0 0 4 O c o
'i 14 �1'0 t rl ei 'i 'i 'i 'i rl ei ei ri 14 TV .ti .ti .ti
c a u i 3 I
O •�
0 d
N
5 'p
71
L7 A
W 0
O
w 4- IM
W L
L � �
L
�d N
3 E o
0 y `1 c N
C O 'n f0 d Oi
Q o w 14
fO — H
rw 0 H R c
W= Y
U
cc!V Y — :� 0
r C G 0)LL
t Ga1 u�i ;t f0M u p o
a o Q 5j
I I I I I v a s
Q a0 CJ vt 0 r: u+ E m m
LIY Ih u m y
sc C se n 3c v c
"' ii a
.
r r �- I-� t- W I • • •