HomeMy WebLinkAboutContract 49565-CO2 FORT WORTH city of Fort Worth ����C���P���'� Change Order Request Project Name:1 Marine Creek Interceptor Improvements Phase I,Part 1 City Sec No.: 49565 Project No.(s): 59607-0700430-CO2223-001783 1 DOE No. 7214 City Proj.No.: 02223 Project Description: Pipe enlargement to upgrade and replace an existing deteriorated sanitary sewer main located within the Marine Creek Basin beginning from Bowman Roberts Road/Cromwell Marine Creek Road Contractor.I William J.Schultz,Inc dba Circle C Construction Change Order# Date: 8/25/2018 City Project Mgr.1 Roberto C.Sauceda, P.E. City Inspector: I Virginia Garcia Phone Number: 817-392-2387 Phone Number 817-223-2259 Dept. Sewer Totals Contract Time (Calendar days) Original Contract Amount $1,634,700.00 $1,634,700.00 320 Extras to Date $56,400.00 $56,400.00 030 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $1,691,100.00 $1,691,100.00 350 Amount of Proposed Change Order $7,970.00 $7,970.00 030 Revised Contract Amount $1,699,070.00 $1,699,070.00 380 Original Funds Available for Change Orders $81,800.00 $81,800.00 Remaining Funds Available for this CO ��,400.00 $25,400.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 3.94% MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $2,043,375.00 Change Order No. 2 will provide for the relay of a 468 foot segment of the project 24-inch sewer main due to direct conflict with an Atmos gas main that was encountered during construction.The relay will lower the sewer main 2 feet below the gas main.The change order will also allow for the removal and reinstallation of one manhole to accommodate the pipe relay. y OF Fps OFFICIAL RECORD AVI CITY SECRETARY O FT.WoffM,TX Mary J. , elty Se .� e 'WS U It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. MIM William J.Schultz,Inc dba Circle C Construction Teri Skelly / 7 Z- / 17 i t+ f15ST$,tctiii Ufleitvf + _gam M&C Number NSA M&C Date Approved NIA FOi2T WC3RTH City of Fort Worth 1W Change Order Additions Project Name Marine Creek Interceptor Improvements Phase I,Part 1 City Sec No.: 1 49565 Project No.(s): 59607-0700430-CO2223-CO1783 DOE No. 7-2—14--1 City Proj. No.: 02223 Project Pipe enlargement to upgrade and replace an ebsting deteriorated sanitary sewer main located within the Marine Creek Description Basin beginning from Bowman Roberts Road/Cromwell Marine Creek Road Contractor William J.Schultz, Inc dba Circle C Construction Change Order:=2 Date: 8/25/2018 City Project Mgr. Roberto C.Sauceda,P.E. City Inspector Virginia Garcia ADDITIONS DEPT MY Unit ktrlit Coat Total 26 4'MH Extra Depth Sewer 15.00 LF $150.00 $2,250.00 37 Remove and reinstall 24-inch SS pipe by open cut Sewer 468.00 LF $65.00 $30,420.00 38 Remove and reinstall 4'MH Sewer 1.000 Ea $5,300.00 $5,300.00 Sewer $37,970.00 Page 2 of 4 Additions Sub Total 1$37,97000 FORT WbT aTH City of Fort Worth Change Order Deletions Project Name Marine Creek Interceptor Improvements Phase I,Part 1 City Sec No.: 49565 Project No.(s): 59607-0700430-CO2223-CO1783 DOE No. 7214 City Proj.No.: 02223 Project Description Pipe enlargement to upgrade and replace an existing deteriorated sanitary sewer main located within the Marine Creek Basin beginning from Bowman Roberts Road/Cromwell Marine Creek Road Contractor William J.Schultz, Inc dba Circle C Construction Change Order: EEI Date 8/25/2018 City Project Mgr. Roberto C.Sauceda,P.E. City Inspector: Virginia Garcia DELETIONS ITEM DESCRIPTION DEPT (sty Ur;1t Unit Cost Total 35 Construction Allowance Sewer 0.75 LS $40,000.00 $30,000.00 Sewer $30,000.00 Page 3 of 4 Deletions Sub Total 1$30,000.00 MWWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00 Page 4 of 4 Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. (0�� A � �O V CC Del Signature -7, l S � L � Name of Employee I�P2l� gnu .e Title