Project Name:1 Marine Creek Interceptor Improvements Phase I,Part 1 City Sec No.: 49565
Project No.(s): 59607-0700430-CO2223-001783 1 DOE No. 7214 City Proj.No.: 02223
Project Description: Pipe enlargement to upgrade and replace an existing deteriorated sanitary sewer main located within the Marine Creek Basin beginning
from Bowman Roberts Road/Cromwell Marine Creek Road
Contractor.I William J.Schultz,Inc dba Circle C Construction Change Order# Date: 8/25/2018
City Project Mgr.1 Roberto C.Sauceda, P.E. City Inspector: I Virginia Garcia
Phone Number: 817-392-2387 Phone Number 817-223-2259
Dept. Sewer Totals Contract Time
(Calendar days)
Original Contract Amount $1,634,700.00 $1,634,700.00 320
Extras to Date $56,400.00 $56,400.00 030
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $1,691,100.00 $1,691,100.00 350
Amount of Proposed Change Order $7,970.00 $7,970.00 030
Revised Contract Amount $1,699,070.00 $1,699,070.00 380
Original Funds Available for Change Orders $81,800.00 $81,800.00
Remaining Funds Available for this CO ��,400.00 $25,400.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 3.94%
MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $2,043,375.00
Change Order No. 2 will provide for the relay of a 468 foot segment of the project 24-inch sewer main due to
direct conflict with an Atmos gas main that was encountered during construction.The relay will lower the
sewer main 2 feet below the gas main.The change order will also allow for the removal and reinstallation of
one manhole to accommodate the pipe relay.
y OF Fps OFFICIAL RECORD
AVI
CITY SECRETARY
O FT.WoffM,TX
Mary J. , elty Se .�
e 'WS
U
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
MIM
William J.Schultz,Inc dba Circle C Construction Teri Skelly / 7 Z- /
17 i
t+
f15ST$,tctiii Ufleitvf
+ _gam
M&C Number NSA M&C Date Approved NIA
FOi2T WC3RTH City of Fort Worth
1W Change Order Additions
Project Name Marine Creek Interceptor Improvements Phase I,Part 1 City Sec No.: 1 49565
Project No.(s): 59607-0700430-CO2223-CO1783 DOE No. 7-2—14--1 City Proj. No.: 02223
Project Pipe enlargement to upgrade and replace an ebsting deteriorated sanitary sewer main located within the Marine Creek
Description Basin beginning from Bowman Roberts Road/Cromwell Marine Creek Road
Contractor William J.Schultz, Inc dba Circle C Construction Change Order:=2 Date: 8/25/2018
City Project Mgr. Roberto C.Sauceda,P.E. City Inspector Virginia Garcia
ADDITIONS
DEPT MY Unit ktrlit Coat Total
26 4'MH Extra Depth Sewer 15.00 LF $150.00 $2,250.00
37 Remove and reinstall 24-inch SS pipe by open cut Sewer 468.00 LF $65.00 $30,420.00
38 Remove and reinstall 4'MH Sewer 1.000 Ea $5,300.00 $5,300.00
Sewer $37,970.00
Page 2 of 4 Additions Sub Total 1$37,97000
FORT WbT aTH City of Fort Worth
Change Order Deletions
Project Name Marine Creek Interceptor Improvements Phase I,Part 1 City Sec No.: 49565
Project No.(s): 59607-0700430-CO2223-CO1783 DOE No. 7214 City Proj.No.: 02223
Project Description Pipe enlargement to upgrade and replace an existing deteriorated sanitary sewer main located within the Marine
Creek Basin beginning from Bowman Roberts Road/Cromwell Marine Creek Road
Contractor William J.Schultz, Inc dba Circle C Construction Change Order: EEI Date 8/25/2018
City Project Mgr. Roberto C.Sauceda,P.E. City Inspector: Virginia Garcia
DELETIONS
ITEM DESCRIPTION DEPT (sty Ur;1t Unit Cost Total
35 Construction Allowance Sewer 0.75 LS $40,000.00 $30,000.00
Sewer $30,000.00
Page 3 of 4 Deletions Sub Total 1$30,000.00
MWWBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
Page 4 of 4
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
(0�� A � �O V CC Del
Signature
-7, l S � L �
Name of Employee
I�P2l� gnu .e
Title