HomeMy WebLinkAboutContract 50132-CO1 CITY SECRETARY l3 Z C01 FORT WORTH, City of Fort Worth CONTRACT NO. �1 — Change Order Request Breakdown ProjectNamel City of Fort Worth-Gateway Park Synthetic Turf Resurfacing I City Sec# F 50132 Client Project#(s)J 30100-0800450-5740010-100569-004280133002-0800450-5740010-100569-004280 Contractorl Hellas Construction,Inc. PM I Scott Penn Inspector nla Change Order Submittal# Date 611712018 Contract Time Dept. PARD Totals CD Original Contract Amount $2,139,887.57 $2,139,887.57 Extras to Date $0.00 Credits to Date $0.00 Pending Change Orders(in M&C Process) Contract Cost to Date $2,139,887.57 $2,139,887.57 Amount of Proposed Change Order $43,689.70 $43,689.70 Revised Contract Amount 2,183,577.27 $2,183,577.27 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) $43,689.70 $43,689.70 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 2.04% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $2,674,859.46 6"depth subgrade remediation for the attached areas;1)Remove the existing turf layer,a-layer and cut out the existing liner,2)Excavate 6"below the HDPE liner and stablize the affected subgrade area with 6"of new drain stone,3)Repair and seal the HDPE liner and backfill the gravel layer,4)Re-pour in-place a new a-layer system and cover with turf,and 5)Dispose of all excated spoils off-site. a City of Fort Worth Change Order Additions Project Name I City of Fat Worth-Gateway Park Synthetic Turf Resurfacing City Sec# 50132 Client Project# 1 30100-0800450-5740010-100569-004280133002-0800450-5740010-100569-004280 contractorl Hellas Construction,Inc. PM Scott Penn Inspectorl n1a Change Order Submittal# = Date 611712018 ADDITIONS ITEM DESCRIPTION JLVI ty Unit Unit Cost Total Soccer FiVArea 1- ccer ie ea 2- 7. ccer ie a 3- 6,465.00 ccer ieArea 4- 7,758.00 Rugby Field#3-Area 5- 12,2 00.00 Soccer ieArea 6- 3,999.60 Soccer Field#1-Area 7-100 SF PARD 1.00000000 ILS $3,333.00 8 additional-Fonds P 1. 000000 S 843.1 PARD $43,689.70 Sub Total Additions 3,6 99.70 Change Order Additions Page 2 of 5 FORT It City of Fort Worth Change Order Deletions Project Name I City of Fort Worth-Gateway Park Synthetic Turf Resurfacing City Sac# 50132 Client Project# I 301004800/50-5740010-100569-004280133002.0800450-5740010-100569-004280 ContracWj Hellas Conshuction,Inc. PM Scod Perin Inspaclor Na Change Order Submittal p O1 Date 6117f2018 DELETIONS ITEM DESCRIPTION DEPT ry Unit Unit Coit ota PARD $0.00 Sub Total Deletions 0.00 Change Order Deletions Page 3 of 5 MISBE Breakdown for this Change Order MISBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00 APPROVAL STATUS: Approved: Comments: r User: ebra Rose Date: Approved: Comments: User: Hellas C ns uction, Inc. Date: Approved: Comments: User: Scott E. Penn Date: Approved: Comments: User: Richard avala Date: (Q Lem Approved: Comments: User: Doug Black Date: 612fIt8 Approved: Comments: us J. �t� User: �. _anAl_nd! Date: � 7] 2 ig Approved: Comments: User: ary Kayser Date: 7���p'�p/� or�o :o ..... '�� Hellas Construction, Inc. 12710 Research Blvd.#240 . Austin,TX 78759 Phone:512-250-2910 Fax:250-1960 • • HellasConstruction.com info La hellasconstruction.com LETTER OF TRANSMITTAL Attn: Scott Penn, RLA Date: 6/20/2018 To: Park and Recreation Department Subject: PO-18-00102722 4200 South Freeway, Suite 2200 Gateway Park Synthetic Turf Fort Worth, Texas 76115 Surface—3 Soccer Fields Phone: 817) 392-5750 WE ARE SENDING YOU: ® Enclosed ❑ Under separate cover via ❑ 111 Class Mail ❑ Facsimile ® Federal Express the following items: ® Change Order ❑ Samples ❑ Contract ❑ Bonds ❑ Copy of Letter ❑ Plans ❑ Prop. Change Order ❑ Specifications ❑ Subcontract ❑ Submittal Data ❑ Other COPIES DESCRIPTION 1 Gateway Park—Subgrade Remediation—Change Order 1401 THESE ARE TRANSMITTED as checked below: ❑ For your files ❑ Approved as submitted ® For your signature ❑ Approved as noted ® As requested ❑ Returned for correction ® For approval ❑ Return 1 copy(s) to us If you have any questions, please contact me at 512-250-2910 or on my cell at 512-698-2593. Thanks, ZEawk Project Manager Capital Project Departmental Review Project Name: Synthetic Turf Replacement Park Name: Gateway Park Park Operations District: East District Project Manager: Scott Penn Routing Start Date: 6/18/2018 Project Scope: Change Order#1(only)-to repair subgrade issues on all three fields, not in original scope and discovered after new tun`was laid. Additional funds in the amount of$30,000 were identified in Pay Go(Gateway Wall) N/A Reviewer Date ❑ PRM-Admin. N/A evi r Date ❑ PRM-AD N/A Revie Date PARD-Director 8 Comments O� Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. P / Name of Employee/S' nature Title ❑ This form is N/A as No City Funds are associated with this Contract. Printed Name Signature i . t i