HomeMy WebLinkAboutContract 51569-AR1 JON 17 2019 CITY SECRETARY c� UN 7 3 T WORNH. 07ySrCRrwoR City of Fort Worth CONTRACT NO. �J(5to - R 1 7YSEC8rwU ; CRObnstruction Allowance Request Breakdown �n�sECRErApy , Construction CA# Date 5/16/2019 City Sec# 1 51569 Client Project#(s)l 100830, 100740 FAC#(s)l 56016-0600430-5740010-100830-001780;39406-0200431-5740010-100740-002480 Project Name Water and Sanitary Improvements for Lake Shore Streets;a combined water utilities and paving project. Description Contractorl Woody Contractors, Inc. City Inspector Steven Aguirre Funding Water Sewer TPW Select Day Type Allocation Account Totals Original Contract Amount $850,911.50 $687,113.00 $1,609,695.00 $3,147,719.50 365 Extras to Date Credits to Date Current Contract Amount $850,911.50 $687,113.00 $1,609,695.00 $3,147,719.50 365 Amount of Proposed Allocation $9,520.00 $600.00 $15,168.00 $25,288.00 Original Allowance Available for Allocation $80,000.00 $60,000.00 $127,220.00 $267,220.00 Allowance Funds Previously Allocated Remaining Funds Available for this Allocation $80,000.00 $60,000.00 $127,220.00 $267,220.00 IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL:Furnish all labor and material as per attached proposed Construction Allowance Request(with attachments)to the Construction Allowance Request: Appropriated Construction Allowance funds are being requested to be used for construction items that were inadvertently omitted from the bit item lists. It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request.Contract Time will be adjusted on the basis of the time shown on this Construction Allowance Request by a later Change Order,if necessary. OFFICIAL RECORD CITY SECRETARY FT. WORTH,TX - - - 0 m co in O CD o 0 o O o 0 CD 0 0 0 0 o O o 0 Q o c) CD o o � 691 rn a) 69, ao U C G691 �r a) > C � Q) U Li Q Q Y Lj > > u- J W W Cl) U) CO U aJ O O ca' U ZA O CDO O CD O CD O O O O O O O O c U) p CV CV O ((O C T O Cl) co O O O cB N �C co (n +- cC d o 16- O 0 a) m m d - r cc N o CD 3 a O CD � — N o a) � LID o Z m cc m ca m d a a. d += C) Q O U M p LL o Cl ° O O 3 o ° o 0 0 CO M CO � C o Y U O °o Ca _ 1� J � O U o � o w S.. M c N C) E 0 � o � O o 0 U o E ca O O O O :-. U a) E` ca CD CO O� O -O O a) a) CO = U 0 o m > a) C U [[►+��+ C GO o A) C-' O Ocu O L O O O a) CD 41 C Cn (6 N OO C N (i3 -O O J Q) *k $k ca zQ (U6 jCE3V L CO (O Q C: LU (9 Q Q UCL) +-- U U•-• Ud U Q) O U O =CD OO LL U U O Cv ON aE) a) E C a) N C a) U v N C O N CO -Y N N U CD 0 0 0 0 0 0 0 0 0 00 00 CV O CO 00 Lo CO N 6; 6" _U-5 U-) £A N u7 O a 0 F- .fl CO N O N N W (O d N C O Q L Qj L O Qj W (O U f \ 2 ¥ # < \ _} 5 co o ® w \ 7 0 q ® /o LU � LU (aCDcoQ @ G m y / S e 2 $ n / Q \ R co a * Q : o c / / \ 2 ° § R \ \ U \ 2 z 5 o S ? ecc « Q % 0 3: \ / ^ / A 2 \ « u o b z / c Cl) 6 7 o a) u 2 / \ c § k 2 � U 6 / CL CD / \ � 0 3 3 t 9 co \ / \ \ CO 2 a R ® ® / / \ \_ = e o ~ LL 0 ± E 2 \ 0 0 0 0 0 0 0 0 0 oocoo c 0 ~ o H O N N UO l0 d N C O a v L v L O Q� UO c U MMBE Breakdown for this Construction Allowance Request MWBE Sub. Type of Service Amount for-this FOA Total $0:00 Previous Construction Allowance Requests 00#- DATE AMOUNT Total $0.00 v m v a ti Qi o V4 —4 u ¢ 3 O i N '' •• �' �'n z .. i �n ` u�i 9 LL of c ' iJ _ m ¢ I N a1 I � I rn I � 00 I M ( O II CA ti i N O co M F O I s � 10 a u .V��•� i,e i fY N cn Imo ' s' N d ................ .. �Q E J� N z `f ¢ c E N d � O u pQ E \ bb E m N 3 � N o Cd o I > •• cn a I o QWO O c _ � u `" 3 Q m LL o U Sk b o p d �. _ ca Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Kristian Su grim / Name of Employee/Signature Project Manager Title This form is N/A as No City Funds are associated with this Contract Kristian Su rim Printed Name Signa re OHICIAI,R :¢ , CITY SECRETAa FT. WORTHP C X Soto, Vania Elizabeth From: Black, Doug Sent: Monday,June 17, 2019 2:32 PM To: Soto, Vania Elizabeth; Sugrim, Kristian Subject: RE:Vendor Signature Yes. That will work. Thanks, Doug From:Soto, Vania Elizabeth Sent: Monday,June 17, 2019 14:30 To: Black, Doug<Douglas.Black@fortworthtexas.gov>;Sugrim, Kristian <Kristian.Sugrim@fortworthtexas.gov> Subject: RE: Vendor Signature Doug, Attached is the email Kristian provided. Please let me know if you are okay with this taking place of the vendor signature. Thank you. Vania E. Soto Administrative Assistant City Secretary's Office 817-392-6090 Vania.SotoAfortworthtexas.goov From: Black, Doug Sent: Monday,June 17, 2019 10:07 AM To: Soto, Vania Elizabeth <Vania.Soto@fortworthtexas.gov>; Sugrim, Kristian <Kristian.Sugrim@fortworthtexas.gov> Cc: Prieur, Lauren L<Lauren.Prieur@fortworthtexas.gov>; Zarate, Lane M <La ne.Za rate @fo rtworthtexas.gov> Subject: RE:Vendor Signature Importance: High Not necessarily. The Contractor is supposed to acknowledge the extra work. How do we know he agreed to do it? It's unfortunate that a program we use constricts the processes we're to follow. If Kristian has an email or some other acknowledgement from the contractor agreeing to do this work, we can attach that to the document. Thanks, Doug From:Soto,Vania Elizabeth Sent: Monday,June 17, 2019 9:31 To:Sugrim, Kristian<Kristian.Sugrim@fortworthtexas.gov>; Black, Doug<Douglas.Black@fortworthtexas.gov> Cc: Prieur, Lauren L<Lauren.Prieur@fortworthtexas.gov>; Zarate, Lane M<Lane.Za rate @fortworthtexas.gov> Subject: RE: Vendor Signature Doug, i Sugrim, Kristian From: Sugrim, Kristian Sent: Monday,June 10, 2019 3:08 PM To: Troy Woody Cc: Aguirre, Steven Elias Subject: RE: IAke Shore Change order. Attachments: CA#1 Request Approval Troy, The Construction Allowance is still within our Legal Dept.; I've asked for it to be processed, see attached. Regarding the Change Order#1, I'll include the additional sidewalk and etc. for Elgin St. If at all possible, please help me understand the ramps; I believe we have included 12 on Elgin. Also, curb inlet tops are included, which we discussed to be replaced. Thanks. OPEN 3 Construction Invoice Submittal Wor— Construction invoice Submittal Wor— Tro, OPEN Construction Allowance Approval WM Construction Allowance Approval W... Kri: From: Troy Woody[mailto:twoody2020@aol.com] Sent: Monday, June 10, 2019 2:06 PM To: Sugrim, Kristian Cc: Aguirre, Steven Elias Subject: Re: LAke Shore Change order. Kristian, This looks fine but what happened to the first change order adding the sidewalk on Elgin. I have not seen anything on it. I have attached it to this email. I think that needs to be added to this change order too unless you have changed your mind about doing that work. . It has two new items for the tree removal and double ADA ramps. I don't want to run out of funds at the end of this job. that delays closing them out. Let me know your thoughts. Thanks, Troy Woody Woody Contractors Inc. 817-483-4787 Cell-817-401-1901 -----Original Message----- From: Sugrim, Kristian <Kristian.Sugrim@fortworthtexas.gov> To: Troy Woody<twoody2020@aol.com> Cc: Aguirre, Steven Elias <Steven.Aguirre@fortworthtexas.gov> Sent: Fri, Jun 7, 2019 3:26 pm Subject: RE: LAke Shore Change order. Is this about right with you guys? Thanks. i From: Troy Woody [mailto:twoody202O@aol.com] Sent: Tuesday, June 04, 2019 10:54 AM To: Sugrim, Kristian Subject: Re: LAke Shore Change order. It never hurts to have it. There is a lot of concrete work to be done. Thanks, Troy Woody Woody Contractors Inc. 817-483-4787 Cell- 817-401-1901 -----Original Message----- From: Sugrim, Kristian <Kristian.Su grim @fortworthtexas.g ov> To: Troy Woody <twoody202O@aol.com> Cc: Aguirre, Steven Elias <Steven.Ag u i rre @fo rtworthtexas.gov> Sent: Tue, Jun 4, 2019 10:50 am Subject: RE: LAke Shore Change order. Troy, You're wrapping up the utility work on this contract and we're into about the 7th month; so, we still have 5 mths., do you still want to have the 7 days added?Thanks. From: Troy Woody[mailto:twoody202O@aol.com] Sent: Monday,June 03,2019 5:48 PM To: Sugrim,Kristian Cc: Aguirre, Steven Elias;Hamilton,Lawrence; Sholola, Tony Subject: Re: LAke Shore Change order. Kristian, The 53 SY is in several spots on the east side of Handley between Church street and Lancaster. It includes several driveway transitions and an area behind the sidewalk. My post TV does not include any services but we do not TV services so we should be fine. I will instruct my crews to proceed with the added sewer.As previously discussed we will have a pretty big over run on TEMP HMAC on the sewer section that may eat up quite a bit of the allowance.. You may want to make this request a change order.Also,please add 7 calendar days to my request. Thanks, Troy Woody Woody Contractors Inc. 817-483-4787 Cell- 817-40I-1901 -----Original Message----- From: Sugrim, Kristian<Kristian.Sugrim@fortworthtexas.gov> To:Troy Woody<twoody202O@aol.com> Cc: Aguirre, Steven Elias<Steven.Aguirre@fortworthtexas.gov>;Hamilton,Lawrence<Lawrence.Hamilton@fortworthtexas.gov>; Sholola, Tony<Anthony.Sholola@fortworthtexas.gov> Sent: Mon,Jun 3,2019 4:33 pm Subject: FW: LAke Shore Change order. Hi Troy, We concur with your request.However, is the 53 SY. 14MAC for the driveway at 3109 Handley Dr? If so, I don't believe it's more than about 16 SY.; would you please verify that quantity.Also, does your quantity for item 22 (Post TV) include the services for the second SS line on Elgin? So,just let me know once you verify these items and I would generate the 2 upload for BIM 360. I'm thinking about using the construction allowance, since we'll have enough under unit 2(SS)and unit 6(Handley Dr.paving).Any different thoughts?Thanks. From: Troy Woody[mailto:twoody202O@aol.com] Sent:Monday,June 03,2019 3:04 PM To: Sugrim,Kristian Cc:Aguirre, Steven Elias Subject:LAke Shore Change order. Kristian, Attached is a change order request for Lake shore for the added sewer line. It is all existing items except for the remobilization item.If you can give me an email saying to proceed by late tomorrow you can delete the remob item and we can do this line before we move off. The 3"HMAC is over on Handley behind the curb. Westhill installed it for us.Call me if you have any questions. Thanks, Troy Woody Woody Contractors Inc. 817-483-4787 Cell-817-401-1901 -----Original Message----- From:twoody202O@aol.com<sharpprinter20@gmail.com> To:twoody202O<twoody202O@aol.com> Sent:Mon,Jun 3,2019 2:56 pm Subject: Scanned image from MX-M365N Reply to:twoody202O@aol.com 02O@aol.com<twoody202O@aol.com> Device Name:Not Set Device Model:MX-M365N Location:Not Set File Format:PDF(Medium) Resolution:200dpi x 200dpi Attached file is scanned image in PDF format. Use Acrobat(R)Reader(R)or Adobe(R)Reader(R)of Adobe Systems Incorporated to view the document. Adobe(R)Reader(R)can be downloaded from the following URL: Adobe,the Adobe logo,Acrobat,the Adobe PDF logo,and Reader are registered trademarks or trademarks of Adobe Systems Incorporated in the United States and other countries. hqp://www.adobe.com/ 3