HomeMy WebLinkAboutContract 50124-AR1 CFW Construction Allowance Request Approval CAAppr-01 Pagel of 3
CITY SECRETARY
Routing
CONTRACT No. 5 0 t a y -ArA
Assigned To: Due Date:
Assigned By: Due Time:
Links 1
fortworthgov/Infrastructure Proiects/02694-2014 CIP Year 3 - Contract 5/Contractor/Change Orders/2694 2014 CIP
Year 3 Contract 5- allowance request 1.x1sm
Attachments(0)
No Attachments have been added to this form.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH,TX
https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=5150O&ProcessI... 6/29/2018
CFW Construction Allowance Request Approval CAAppr-OI Page 2 of 3
CITY SECRETARY
MNITRACTNO."5012 �-
FORT WORTH @ C'ty of Fort Worth
—r•� Construction Allowance Redi.iest Approval
(Construction Allowance Breakdown Available in Links)
For Construction Allowance Submittal No.:
Construction Allowance Request Approval No.: CAAppr-01
Date Started:,2018-06-11 Date Due:12018-07-31
City Sec. No.: 50124
Project Name: 2014 CIP Year 3 - Contract 5
Project Numbers: 02694 DOE Numbers:
Project 2014 CIP Year 3 Contract 5- Combined street paving
Description: improvements and water and saintary sewer main replacemnets in
jNorthside area.
Project/Contract
Compliance Mary Hanna City Irspector: Daniel Roy
Manager:
Contractor: ]LB Contracting, LLC
COST AND DAYS SUMMARY:
Requested
Department: Cost($) Fund Account Center: Days:
TPW $ 2,550.00 39412/34014-200431-5740010-c02( 0
Total Cost: $ 2,550.00 Total Requested Days: 0
Approval Status:
https://projectpoint.buzzsaw.com/ bz web/Forms/ForrnPrint.aspx?";ite1d=51500&ProcessI... 6/29/2018
CFW Construction Allowance Request Approval CAAppr-01 Page 3 of 3
Approved: Yes
Comments:
User: Lane Zarate
Date: 2018-06-12 9:32 PM
IApproved: Yes
iComments:
:User: Ricardo Matute
Date: 2018-06-13 12:35 PM
Approved: Yes
Comments:
User: Doug Wiersig
Date: 2018-06-13 3:55 PM
jApproved: Yes
'Comments:
User: Doug Black
Date: 2018-06-15 5:12 PM
.Approved: Yes
Comments:
User: Susan Alanis
Date: 2018-06-28 8:12 PM
Action Required: Please review and approve
Cn,
FT
https:Hprojectpoint.buzzsaw.com/ bz web/Forms/ForrnPrint.aspx?Site1d=51500&ProcessI... 6/29/2018
FORT WORTH City of Fort Worth
�f`vpro� Construction Allowance Request Breakdown
Construction CA# Date 6/7/2018 City Sec# 1 50124
Client Project#(s)l 02694
FAC#(s)1 59601/59607/39412/34014-600430/700430/200431-574001 O-CO2694-CC 1783/CO2483
Project Name 2014 CIP Year 3 Contract 5-Combined street paving improvemnts and water and saintary sewer main replacemnets in
Description Northside area
Contractorl JLB Contracting,LLC City Inspector Daniel Roy
Funding Water Unit 1 Sewer Unit 2 Paving Unit 3 Contract Time
Allocation Account Totals D
Original Contract Amount $1,859,812.75 $967,037.88 $1,864,066.79 $4,690,917.42 425
Extras to Date
Credits to Date _
Current Contract Amount $1,859,812.75 $967,037.88 $1,864,066.79 $4,690,917.42 425
Amount of Proposed Allocation $0.00 $0.00 $2,550.00 $2,550.00 0
Original Allowance Available for Allocation $150,000.00 $60,000.00 $100,000.00 $310,000.00
Allowance Funds Previously Allocated _
Remaining Funds Available for this Allocation $150,000.00 $60,000.00 $100,000.00 $310,000.00
JUSTIFICATIQN SUMMARY_
IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL:Furnish all labor and material
as per attached proposed Construction Allowance Request(with attachments)to the Construction Allowance Request: Due to high bank on
Market,additional sloping was required to achieve acceptable slopes. As a result,a water meter and mailbox needed to be relocated.
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and
represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request.Contract Time will be adjusted on the
basis of the time shown on this Construction Allowance Request by a later Change Ordgr,if necessary,
FORT WORTH_, City of Fort Worth
411111� Construction Allowance Request Breakdown
Construction i 0 Date 6/712018 City Sec# 50124
Client Project#(s)l 02694
FAC#(s)l 59601/59607/39412/34014-600430/700430/200431-574001O-CO2694-COl783/CO2483
Project Name 2014 CIP Year 3 Contract 5-Combined street paving improvemnts and water and saintary sewer main replacemnets in Northside area
Description
Contractorl JLB Contracting,LLC City Inspector Daniel Roy
ADDI I IUi
Dept/FAG y Unit UnitCost o a
Additional yard sloping 777gM
77—Relocate Water Meter Box aving mt .
Relocate Mailbox av ng Tnit
Water Unit 1 $0.00
Sewer Unit 2 $0.00
Paving Unit 3 $2,550.00
Sub Totalions
Change Order Additions Page 2 of 5
ORT WO T City of Fort Worth
Construction Allowance Request Breakdown
Construction FOA# Date 6/7/2018 City Sec# 50124
Client Project#(s)J 02694
FAC 9(s) 59601159607/39412/34014-600430/700430/200431-5740010-0O2694-001783/CO2483
Project Name 2014 CIP Year 3 Contract 5-Combined street paving improvemnts and water and saintary sewer main replacemnets in Northside area
Description
Contractorl JLS Contracting,LLC City Inspector Daniel Roy
GONSI RUG ION ALLOWANCE If EMS TO UE REUUCEU
ep — y Unit UnitCost o a
construction Allowance among among ni
Water Unit 1 0.00
Sewer Unit 2 $0.00
Paving Unit 3 $2,550.00
u Totala etions
Change Order Deletions Page 3 of 5
MIWBE Breakdown for this Construction Allowance Request
MWBE Sub Type of Service Amount for this FOA
Total $0.00
Previous Construction Allowance Requests
CO# DATE AMOUNT
Total $0.00