HomeMy WebLinkAboutContract 35636 AMENDMENT NO. 2
STATE OF TEXAS § CITY SECRETARY CONTRACT NO.
(M&C Needed)
COUNTY OF TARRANT §
WHEREAS, the City of Fort Worth (City) and URS Corporation (Engineer) made
and entered into City Secretary Contract No. 31731 (the Contract) which was authorized
by the City Council by M&C C-20492 on the 18th day of January, 2005; and
subsequently revised by one previous Amendment No. 1 for $138,058.00 on April 4,
2006 (M&C C- 21390); and
WHEREAS, the Contract involves engineering services for the following project:
Engineering Contract for Updating the Federal Aviation Regulation — Part
150 Noise Compatibility Study for Fort Worth Alliance Airport.
WHEREAS, it has become necessary to execute Amendment No. 2 to said
Contract to include an increased scope of work and revised maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through their duly
authorized representatives, enter into the following agreement, which amends the
Contract:
1.
Article I of the Contract is amended to include the additional engineering services
specified in a proposal letter dated December 21, 2006, a copy of which is attached
hereto and incorporated herein. The cost to City for the additional services to be
performed by Engineer total $86,890.00.
2.
Article II of the Contract is amended to provide for an increase in the maximum
fee to be paid to Engineer for all work and services performed under the Contract, as
amended, so that the total fee paid by the City for all work and services shall not exceed
the sum of$524,828.00.
3.
All other provisions of the contract, which are not expressly amended herein, shall
remain in full force and effect.
Won
Z�ORIGIIYAL
EXECUTED on this the day of , 2007, in Fort
Worth, Tarrant County, Texas.
APPROVAL RECOMMENDED: APPROVED:
INAP477� " &
#DoEgg"lasRademaker,P.E. wmc
Director,Department of Assistant City Manager
Engineering
URS Corporation
ENGINEER
ATTEST:
Marty Hendri , City Secretary
By: (54;/ /ter- 0-
, =Crl
Cont a t Authorizatiolk
Name:
Date
APPRO S T
O FOR GALITY:
Assistant ity Attorney
END
N. WORTH, TEX.
ALLIANCE AIRPORT
FAR PART 150 NOISE COMPATIBILITY PROGRAM UPDATE
URS CORPORATION
SCOPE OF SERVICES
ADDITION OF F-5 OPERATIONS
Revised— December 21, 2006
SCOPE OF SERVICES Alliance Airport - FAR Part 150 Update
ALLIANCE AIRPORT
REVISE PART 150 STUDY TO ADD F-5 OPERATIONS
SCOPE OF SERVICES
PHASE 1 — NOISE EXPOSURE MAPS
TASK 1 MOBILIZATION AND PROJECT MANAGEMENT
Task 1.1 Mobilization
This task involves the mobilization, coordination and management of the non-
technical aspects of Phase 1 of the project. This includes the coordination with
Alliance Airport, the City of Fort Worth, Alliance Aviation Center for Excellence
(AACE), the US Air Force Air Education and Training Command (AETC), and the US
Air Force Center for Environmental Excellence (AFCEE/TDN) regarding the addition
of F-5 operations at AFW. It includes a meeting in Fort Worth to discuss the addition
of the F-5 operations. Revisions to the Workplan will be prepared and distributed if
appropriate.
Task 1.2 Project Management
Throughout the duration of the project, the Project Manager and Deputy Project
Manager will be coordinating as necessary with Airport staff, City representatives
and others to ensure that the project and schedule are progressing as planned. This
on-going coordination will provide the Airport staff with a consistent, single point-of-
contact throughout the duration of the project. Included under this task will be any
coordination meetings required outside the scope of the meetings with the Technical
Advisory Committee and all project review meetings.
TASK 2 LAND USE MAPPING
NOTE: This task will not require revision as a result of adding F-5 operations. Therefore,
there is no additional cost for this task in this scope of services.
December 21, 2006 Page 1 of 20
SCOPE OF SERVICES Alliance Airport - FAR Part 150 Update
TASK 3 INVENTORY OF AIRPORT AND AIRCRAFT OPERATIONS
Task 3.1 Collect Aircraft Operations Data
Data will be collected to aid in the determination of proposed F-5 aircraft operational
characteristics. The primary sources of F-5 operational data will be Alliance Aviation
Center for Excellence (RACE), the US Air Force Air Education and Training
Command (AETC), and the US Air Force Center for Environmental Excellence
(AFCEE/TDN). The operational data will form the basis for revision of the noise
contours.
Data to be collected and analyzed will include the following:
• Number and type of operations
• Flight tracks and usage
• Ground run-up and maintenance activities
• Airspace and air traffic
• Day/night usage
• Departure, arrival, touch-and-go, and overhead approach flight profiles
Military operations will also be reviewed to determine accuracy of future fleet mix and
number of operations by T-6 and T-37 aircraft.
Anticipated cargo operations using B-747 aircraft will be reviewed to determine
current accuracy for inclusion in the future fleet mix.
Task 3.2 Review Existing Aviation Plans and Studies
AETC's Description of Proposed Actions and Alternatives
Task 3.3 Working Paper B
The Response to FAA Proposed 2006 Terminal Area Forecast (TAF) for AFW
document will be revised to incorporate the additional F-5 operations, and potential
reduction in B747 operations. The revised forecast document will be submitted to
FAA for review and approval. FAA approval of the revised forecast is required prior
to revision of the NEMs.
Working Paper B became Section 3, Airport and Aircraft Activity in the Noise
Exposure Maps and Supporting Documentation.
Section 3, Airport and Aircraft Activity in the Noise Exposure Maps and
Supporting Documentation will be revised to incorporate the additional F-5
operations and reduction in B747 operations.
December 21, 2006 Page 2 of 20
SCOPE OF SERVICES Alliance Airport - FAR Part 150 Update
• An electronic copy (PDF format) of revised Section 3, Airport and Aircraft
Activity in the Noise Exposure Maps and Supporting Documentation will
be submitted to Alliance Airport staff.
• URS will be responsible for all preparation of Section 3, Airport and Aircraft
Activity in the Noise Exposure Maps and Supporting Documentation and
will provide an electronic copy (PDF format) to a DBE Subconsultant for
reproduction of all hard copies.
TASK 4 EXISTING NOISE CONTOURS
NOTE: This task will not require revision as a result of adding F-5 operations, providing that
the revised Noise Exposure Maps and Supporting Documentation is completed and
submitted to FAA for review and acceptance prior to commencement of F-5 operations.
Therefore, there is no additional cost for this task in this scope of services.
TASK 5 FUTURE NOISE CONTOURS
Task 5.1 Develop 2010 Noise Contours
The proposed F-5 operations, identified in Task 3, will be compiled and analyzed to
determine the operational characteristics for the average annual day for the five-year
(2010) forecast period. This information will be formatted for input into the FAA's
Integrated Noise Model (INM), Version 6.1. In addition, potential reduction in B747
operations, as well as potential fleet mix adjustments of the T-6 and T-37 aircraft will
be included.
INM does not contain standard default departure, arrival, touch-and-go, or overhead
approach profiles for the F-5. However, INM does contain the noise data for the F-5.
URS will coordinate with the US Air Force Center for Environmental Excellence
(AFCEE/TDN) to obtain F-5 profiles from an existing AICUZ study. The NOISEMAP
profiles obtained from the AICUZ study will be adjusted as appropriate for AFW
operations. Interviews with Alliance Aviation Center for Excellence (RACE), the US
Air Force Air Education and Training Command (AETC), and the US Air Force Center
for Environmental Excellence (AFCEE/TDN) will be conducted, as appropriate, to
confirm profiles for use at AFW. The custom F-5 profiles will be added to the INM
database.
The Fort Worth Alliance Airport Part 150 Noise Compatibility Program, Fixed
Wing Aircraft & Helicopter Custom Profile Development and 2011 Noise
Exposure Map & Echo Report will be revised to include the F-5 documentation.
Copies of the revised document will be submitted to AFW and the FAA for review
and approval. A total of 5 hard copies and 10 CDs will be produced.
December 21, 2006 Page 3 of 20
SCOPE OF SERVICES Alliance Airport - FAR Part 150 Update
Noise contours will be generated at DNL 60, 65, 70, and 75 dB. The INM standard
grid analysis feature will be used to re-calculate DNL values at up to 20 noise-
sensitive sites.
The future noise contours will be developed for the proposed 11,000-foot runway
lengths.
F-5 aircraft engine run-up operations data, identified in Task 3, will be compiled and
analyzed to determine the operational characteristics for the average annual day.
This information will be formatted for input into the FAA's Integrated Noise Model
(INM), Version 6.1. INM standard database engine run-up identifiers will be used to
model F-5 engine run-up operations at AFW.
Revised noise contours including both F-5 flight operations and engine run-up
operations will be generated at DNL 60, 65, 70, and 75 dB. The INM standard grid
analysis feature will be used to re-calculate DNL values at up to 20 noise-sensitive
sites.
The Feasibility Analysis for Noise Mitigation at N1SD Alliance Campus
Facilities will be revised to incorporate future noise contours and noise levels
including proposed F-5 operations. Copies of the revised document will be submitted
to AFW and the FAA for review and approval. A total of 10 hard copies and 25 CDs
will be produced.
Task 5.2 Evaluate Impacts of 2010 Noise Contours
The revised DNL 60, 65, 70 and 75 dB noise contours including the F-5 operations
which where developed in Task 5.1 will be incorporated into the GIS database in
order to more accurately quantify noise exposure in terms of population, households,
and land use. Tables will be developed from the GIS to describe the noise exposure
estimates for the revised future conditions. Graphics will be prepared to illustrate the
revised noise contours superimposed over the base mapping and land use. Noise
compatibility will be determined by comparing the anticipated DNL noise levels with
existing land use and the FAA land use compatibility guidelines provided in Table 1
of Appendix A of FAR Part 150.
Task 5.3 Working Paper D
Working Paper D became Section 5, Future Conditions: Year 2010 Noise
Exposure in the Noise Exposure Maps and Supporting Documentation.
Section 5, Future Conditions: Year 2010 Noise Exposure in the Noise Exposure
December 21, 2006 Page 4 of 20
SCOPE OF SERVICES Alliance Airport - FAR Part 150 Update
Maps and Supporting Documentation will be revised to incorporate the additional
F-5 operations.
• An electronic copy (PDF format) of revised Section 5, Future Conditions;
Year 2010 Noise Exposure in the Noise Exposure Maps and Supporting
Documentation will be submitted to Alliance Airport staff.
• URS will be responsible for all preparation of Section 5, Future Conditions:
Year 2010 Noise Exposure in the Noise Exposure Maps and Supporting
Documentation and will provide an electronic copy (PDF format) to a DBE
Subconsultant for reproduction of all hard copies.
TASK 6 NEM CONSULTATION AND PUBLIC INVOLVEMENT
TASK 6 NEM CONSULTATION AND PUBLIC INVOLVEMENT
Consultation and public involvement for the revised NEMs will be incorporated with the NCP
public involvement described in Task 14. Several of the presentation boards previously
produced for the NEM Public Workshop will be re-produced with the revised NEMs. The cost
of re-producing the presentation boards is included in this task.
TASK 7 NEM REPORT PREPARATION
Sections 3 through 6, revised in tasks above, will be incorporated into the Noise Exposure
Maps and Supporting Documentation, which will be submitted to FAA for their
consideration under FAR Part 150. Three versions of the revised NEM document will be
prepared over the course of the study. Quantities of each version are estimates of the City
of Fort Worth's needs. The cost estimate is based on the quantities indicated below. If
additional copies are determined to be necessary, they will be printed and charged to the
City of Fort Worth on a per copy basis.
Task 7.1 Prepare NEM Version 1
Version 1 of the revised Noise Exposure Maps and Supporting Documentation
will be submitted to the Alliance Airport and City of Fort Worth Aviation Department
staff for review and comment.
Task 7.2 Prepare NEM Version 2
Version 2 of the revised Noise Exposure Maps and Supporting Documentation
will incorporate comments from Alliance Airport and City of Fort Worth Aviation
Department staff, and will be the version submitted to the FAA for their review and
acceptance.
Task 7.3 Prepare NEM Version 3
December 21, 2006 Page 5 of 20
SCOPE OF SERVICES Alliance Airport - FAR Part 150 Update
Version 3 of the revised Noise Exposure Maps and Supporting.Documentation
will incorporate the FAA's notice of acceptance, and will be the final NEM document
for the project.
NOTE: Task 7.3 and its associated cost, which have not been completed, were
included in the original scope services. Therefore, there is no additional cost for this
task in this scope of services.
Alliance Airport City of Fort Worth Consultant FAA
NEM Version 1 1 copy 1 copy 2 copies 0 copies
NEM Version 2 2 copies 2 copies 2 copies 5 copies
NEM Version 3 10 copies 5 copies 3 copies 1 copy
In addition to the hard-copies, an electronic copy (PDF format) of all versions will be
provided to Alliance Airport staff on a CD. Electronic copies (PDF format) of Version 2 will be
provided on CDs for distribution to the FAA and TAC. URS will be responsible for all
preparation of the NEM document and will provide an electronic copy (PDF format)to a DBE
Subconsultant for reproduction of all hard copies. Version 3 will be provided on CDs in
addition to the hard copies.
TASK 8 PROCEDURAL REQUIREMENTS TO LIMIT RECOVERY OF DAMAGES
NOTE: Task 8 and its associated cost, which have not been completed, were included in the
original scope services. Therefore, there is no additional cost for this task in this scope of
services.
December 21, 2006 Page 6 of 20
SCOPE OF SERVICES Alliance Airport - FAR Part 150 Update
PHASE 2 - NOISE COMPATIBILITY PROGRAM UPDATE
TASK 9 PROJECT MANAGEMENT
This task involves the mobilization, coordination and management of the non-technical
aspects of Phase 2 of the project. Progress reports will be prepared as needed and
provided to the Alliance Airport and City of Fort Worth Aviation Department staff. Project
management meetings will be held in Fort Worth to coordinate with the Alliance Airport staff
regarding Phase 2 of the project.
TASK 10 OPERATIONAL NOISE ABATEMENT MEASURES
Operational measures which are required by the FAA to be considered as part of the Part
150 process will be evaluated for their applicability and effectiveness at AFW.
Task 10.1 Model Alternative Scenarios
Operational noise abatement alternatives previously identified and modeled will be
revised to include the proposed F-5 operations,
Task 10.2 Evaluate Noise Impacts of Alternative Scenarios
Noise exposure for the alternative scenarios will be re-calculated with the GIS and
quantified in terms of population, households and land use.
Task 10.3 Working Paper F
Preliminary text, tables and exhibits on operational noise abatement measures will
be revised in the form of Working Paper F.
NOTE: The remaining portion of Task 10.3 and its associated cost, which have not
been completed, were included in the original scope services. Therefore, there is no
additional cost for the remainder of this task in this scope of services.
TASK 11 LAND USE NOISE MITIGATION MEASURES
Land use noise mitigation measures which are required by the FAA to be considered as part
of the Part 150 process will be evaluated for the applicability and effectiveness at AFW.
December 21, 2006 Page 7 of 20
SCOPE OF SERVICES Alliance Airport - FAR Part 150 Update
Task 11.1 Evaluate Remedial Land Use Mitigation Measures
Existing non-compatible land uses will be identified in detail within the revised NEM
and potential corrective land use measures will be evaluated.
Task 11.2 Evaluate Preventive Land Use Measures
The preventive land use measures currently under evaluation will be re-evaluated in
light of the revised NEM.
Task 11.3 Working Paper G
Preliminary text, tables and exhibits on land use measures will be revised in the form
of Working Paper G.
NOTE: The remaining portion of Task 11.3 and its associated cost, which have not
been completed, were included in the original scope services. Therefore, there is no
additional cost for the remainder of this task in this scope of services.
TASK 12 CONTINUING NOISE PROGRAM MEASURES
NOTE: Task 12 and its associated cost, which have not been completed, were included in
the original scope services. Therefore, there is no additional cost for this task in this scope
of services.
TASK 13 NOISE COMPATIBILITY PROGRAM RECOMMENDATIONS
NOTE: Task 13 and its associated cost, which have not been completed, were included in
the original scope services. Therefore, there is no additional cost for this task in this scope
of services.
TASK 14 NCP CONSULTATION AND PUBLIC INVOLVEMENT
NOTE: Task 14 and its associated cost, which have not been completed, were included in
the original scope services. Therefore, there is no additional cost for this task in this scope
of services.
TASK 15 NCP REPORT PREPARATION
NOTE: Task 15 and its associated cost, which have not been completed, were included in
the original scope services. Therefore, there is no additional cost for this task in this scope
of services.
December 21, 2006 Page 8 of 20
SCOPE OF SERVICES Alliance Airport - FAR Part 150 Update
TASK 16 NEM / NCP SUMMARY BROCHURE PREPARATION
NOTE: Task 16 and its associated cost, which have not been completed, were included in
the original scope services. Therefore, there is no additional cost for this task in this scope
of services.
December 21, 2006 Page 9 of 20
n
+�U
+ ox
GNP am
1106
N
Ul
A W C
m O
_ OV
3388 it +'E �w n
L
- _I m a _
_� ri 9 �� IY c •4�! � � C# G l7 � � � � R
R
IPP �
R;;L5 14
3 _
CL
i s Y r
c
LO
LL co
W
y.
O e P u
Q N < y
N
LU
a a m z ,
a Q o gg
02
W 4 K W VWl
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL"ACTION: Approved on 5/9/2007
DATE: Tuesday, May 08, 2007
LOG NAME: 55URS AMEND 2 REFERENCE NO.: **C-22107
SUBJECT:
Authorize Execution of AmerKiment No. 2 to the Contract for Consulting Services with URS
Corporation in the Amount of $86,890.00 to Update the Forecast and Assess the Impacts of
Additional Uses Projected in Conjunction with the Update of the FAR Part 150 Noise Compatibility
Study at Fort Worth Alliance Airport
RECOMMENDATION:
it is recommended that the City Councit authorize the City Manager to authorize execution of Amendment
No. 2 to the contract for consulting services with URS Corporation in the amount of $86,890.00 to update
the forecast and assess the impacts of additional uses projected in conjurmtion with the update of the FAR
Part 150 Noise Compatibility Study at Fort Worth Alliance Airport.
DISCUSSION:
in 1991 the City conducted FAR Part 150 Noise Compatibif'rty Studies at Meacham and Alliance
Airports. Since that time the activity at Alliance Airport has changed significantly and development around
the airport has been occurring. An update of the FAR Part 150 Noise Compatibility Study is needed.
On January 18, 2005, (M&C C-20492) City Council authorized the City Manager to execute a contract for
consulting services with URS Corporation in the amount of$299,880.00 to.update the FAR Part 150 Noise
Compatibility Study for Fort Worth Affiance Airport. The City had previously accepted a grant from the.
Federal Aviation Administration (FAA) for this work.
On April 4, 2006, (M&C C-21390) City Council authorized Amendment No. 1 in the amount of$138,058.00
to conduct custom profiles for military aircraft to conduct noise monitoring.
By letter dated March 2, 2007, to Alliance Air Services, Northern General Leasing, LLC, and Lockheed
Martin Corporation, with the support and oversight of the United States Air Force, have advised of their
desire to set up a pilot training program for lead-in pdoot training to allied countries at Fort Worth Affiance
Airport. This training would be conducted with civilian owned F-5 aircraft. This activity will create a
significant number of additional aircraft operations and the forecasts and impacts need to be incorporated
into the FAR Part 150 Noise Compatibility Study. The FAA has approved the addition of this information into
the study. By letter Agreement dated January, 24, 2007, Northern General Leasing, LLC, has agreed to
reimburse the $86,890.00 for the cost of this additional work to URS Corporation directly at the City's
direction. There will be no impact on City funds.
Fort Worth Alliance Airport is located in COUNCIL DISTRICT 2.
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that this action will have no material effect on City funds.
TO Fund/Account/Centers FROM Fund/AccounVCenters
Submitted for City Manager's Office by: Marc Ott (8476)
Originating Department Head: Angie Highland (Acting) (5402)
Additional Information Contact: Angie Highland (5402)