Loading...
HomeMy WebLinkAboutContract 50124-AR3 CITY SECRETARY CONTRACT NO.•_5 O�a 4*K13 FORTW4RTH. City of Fort Worth *_� Construction Allowance Request Construction FOA# Date 5/13/2019 City Sec# 1 50124 Client Project#(s)l02694 FAC#(s)J 59601/59607/3941213401600430/700430/200431-5740010-0O2694-001783/CO2483 Project Name 2014 CIP Year 3 Contract 5,Combined Street Paving Improvements and Water and Sanitary Sewer Main Replacements Descriptionl—project Contractor JLB Contracting City Inspector Daniel Roy Funding Water Unit 1 Sewer Unit 2 T/PW Unit 3 Select Day Type Allocation Account Totals Original Contract Amount $1,859,812.75 $967,037.88 $1,864,066.79 $4,690,917.42 425 Extras to Date $83,919.40 $83,919.40 Credits to Date Current Contract Amount $1,859,812.75 $967,037.88 $1,947,986.19 $4,774,836.82 1 425 Amount of Proposed Allocation $0.00 $22,038.00 $0.00 $22,038.00 1 21 Original Allowance Available for Allocation $150,000.00 $60,000.00 $100,000.00 $310,00 .00 Allowance Funds Previously Allocated $21,000.00 $21,000. Remaining Funds Available for this Allocation $150,000.00 $39,000.00 $100,000.00 $289,000.0 IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL:Furnish all labor and material as per attached proposed Construction Allowance Request(with attachments)to the Construction Allowance Request Added Manhole Changes that are out of the original scope that require time and mobili C u Transition is to cover the small amount of work to repave around the manhole after it is replaced. 1g • 0. Attest �y w. ;.� Mary J. Kay , Ci Cretary tt It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request.Contract Time will be adjusted on the basis of the time shown on this Construction Allowance Request by a later Change Order,if necessary. 5/23/20 n- tq OFFICIAL RECORD CITY SECRETARY FT. WORTH,TX FORT WORTH, City of Fort Worth Construction Allowance Request Construction FOA# C 3� Date 5/13/2019 City Sec# 50124 Client Project#(s)l 02694 FAC#(s)l 59601/59607/39412/3401600430f7004301200431-574001O-CO2694-COl783/CO2483 Project Name 2014 CIP Year 3 Contract 5,Combined Street Paving Improvements and Water and Sanitary Sewer Main Replacements project Description Contractorl JLB Contracting City Inspector Daniel Roy ADDITIONS ITEM UEbGHIH I ION p y Unit Units oa Mobilization ewer n 5 'Major Manhole Adjustment ewer nit EA 5 Manhole w B Back fill ewer Unit A 55 HMAC Transitions Sewer Unit 2 T N 7777 Water Unit 1 0.00 Sewer Unit 2 $22,038.00 T/PW Unit 3 Sub Total Additions Change Order Additions Page 2 of 4 FORT WORTH. City of Fort Worth Construction Allowance Request Construction FOA# 0 Date 5/13/2019 City Sec# 50124 Client Project#(s)l 02694 FAC#(s)J 59601/59607/39412/3401600430/700430/200431-5740010-0O2694-001783/CO2483 Project Name 2014 CIP Year 3 Contract 5,Combined Street Paving Improvements and Water and Sanitary Sewer Main Replacements project Description Contractorl JLB Contracting City Inspector Daniel Roy CONSTRUCTION ALLOWANCE ITEMS TO BE REDUCED ITEM DESCRIP I ION DepUFAC Qty Unit Units o a 29 Construction Allowance ewer wer ni Water Unit 1 $0.00 Sewer Unit 2 $22,038.00 T/PW Unit 3 $0.00 Sub otal Deletions IVIMBE Breakdown for this Construction Allowance Request MWBE Sub Type of Service Amount for this FOA Total $0.00 Previous Construction Allowance Requests CO# DATE AMOUNT Total $0.00 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. a✓ / Name 9f Employee/Signature Title ❑ This form is N/A as No City Funds are associated with this Contract Printed Name Signature OFFICIAL RECORD CITY SECRETARY FT. WORTH,TX