WHEREAS, the City of Fort Worth (City) and CH2M Hill, Inc. ,
(Engineer) made and entered into City Secretary Contract No. 35696,
(the Contract) which was authorized by the City Council by MSC
C-22312 on the 14t' day of August, 2007 and subsequently revised by
one previous amendment; and
WHEREAS, the Contract involves engineering services for the
following project:
M-244B Emergency Sanitary Sewer Rehabilitation.
WHEREAS, it has become necessary to execute Amendment No. 2 to
said Contract to include an increased scope of work and revised
maximum fee;
NOW THEREFORE, City and Engineer, acting herein by and through
their duly authorized representatives, enter into the following
agreement which amends the Contract:
1.
Article I of the Contract is amended to include the additional
engineering services specified in a proposal letter dated September
271, 2010, a copy of which is attached hereto and incorporated
herein. The cost to City for the additional design services to be
performed by Engineer total $22,508.15.
2 .
Article II of the Contract is amended to provide for an
increase in the maximum fee to be paid to Engineer for all work and
services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall not
exceed the sum of $314,658.15. OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
3.
All other provisions of the Contract which are not expressly amended
herein shall remain in full force and effect.
EXECUTED on this the day of Q)Q)G bX.. 2010, in Fort Worth,
Tarrant County, Texas.
ATTEST:
L L L-1-"� -
Marty Hendri ,y'd 'FO
City Secretary p 0'oposcaofl®pp�®��
:1'wo c ¢
o° Ff
APPROVAL RECOWENDED: � r oo° � APPROVED:
0 y
/ dt o,00 000 009 TAy
thEi
S. Frank Crumb, P.E. Fernando Costa
Director, Water Department Assistant City Manager
CH2M HILL, INC.
Engineer
NO M&C REQUIRED
By:
Name:Ken C. Hall P.E. Vice President
309 West 7 Street, Suite 1020
Fort Worth, TX 76102
APPROVED AS TO FORM AND LEGALITY:
Assistant City Attorney
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
-2-
CH2M HILL
309 West 7"Street
Suite 1020
Fort Worth,TX 76102
C H 2M H I LL Tel 817-870-1129
Fax 817-8785753
September 27,2010
Mr. Liam Conlon,P.E.
City of Fort Worth Water Department
1000 Throckmorton
Fort Worth,Texas 76102-6311
Subject: M-244B Emergency Sanitary Sewer Rehabilitation
City Project No. 00834
Amendment No.2
Dear Mr.Conlon:
The purpose of this letter is to request authorization for an additional$36,111.90. Because
there is$13,603.75 of unauthorized funds remaining on the project,the requested additional
contract funding is$22,508.15. The additional funding is needed to address additional
design services.
Project History
The M-244B Emergency Sanitary Sewer Rehabilitation project has been successfully
designed,bid and awarded. During construction,a portion of existing reinforced concrete
pipe (RCP) failed during sliplining operations with high density polyethylene pipe (HDPE).
The City has requested CH2M HILL evaluate the failure and provide additional design
services for supporting the HDPE piping.
Request for Additional Funding
The following outlines our request for additional funding.
Additional Meetings
Since October,2008,over five additional meetings were held with the City to discuss
options for supporting the HDPE piping.
Labor
Labor Category Hours Hourly Rate Total
Project Manager 24 hrs $150 $3,600.00
Labor Subtotal $3,600.00
Additional Design
CH2M HILL developed two design options for the City's consideration. Additional
geotechnical information was required to facilitate the design.CH2M HILL will deliver
signed and sealed drawings for the selected option of drilled pier supports and concrete
encasement of the piping.
Labor
Labor Category Hours Hourly Rate Total
Project Manager 48 hrs $150 $7,200.00
Project Engineer 45 hrs $155 $6,975.00
Staff Engineer 21 hrs $101 2,121.00
Office , 12 hrs $66 $792.00
Estimating 13 hrs $118 $1,534.00
Technician 32 hrs $120 $3,840.00
Senior Consultant 8 hrs $210 $1,680.00
Labor Subtotal $24,142.00
Expense
Geotech (Fugro) $7,609.00
10%Mark-up $760.90
Expense Subtotal $8,369.90
A summary of the total project is as follows:
Contract Description Fee
Original Contract Design, bid, and construction services for M-244B Sanitary Sewer $292,150.00
Rehabilitation Project
Amendment No. 1 Additional Bidding and Construction Assistance $0.00
Amendment No.2 Additional Design Services $22,508.15
TOTAL PROJECT $314,658.15
a The actual cost of Amendment No. 1 was$24,648.00. However,since there was$38,251.75
of unused funds left in the original contract, the actual cost of Amendment No. 1 was
deducted leaving a balance of$13,603.75
b The actual cost of Amendment No.2 is$36,111.90. However,since there is$13,603.75 left
in the contract,the actual cost of Amendment No. 2 has been deducted necessitating
$22,508.15 in additional funding.
Sincerely,
CH2M HILL CH2M HILL
:� C_ • `A�e
Chad Simmons,P.E. Ken C.Hall,P.E.
Project Manager Vice President
Encl.: Amendment No. 2 Breakdown
cc: Mr. Robert Terrell w/ encl.