HomeMy WebLinkAboutContract 35731 AMENDMENT NO. 2 TO AGREEMENT
FOR ARCHITECTURAL DESIGN SERVICES
PAVILION FOR MEADOWBROOK GOLF COURSE
STATE OF TEXAS
CITY SECRETARY CONTRACT NO.W9 31
COUNTY OF TARRANT
WHEREAS, The City of Fort Worth and Nader Design Group (Architect) made and entered into City
Secretary Contract No. 32150 (The Contract)which was authorized by the City Council by M&C C-20844,
the 19th day of July,2005;and
WHEREAS, further amendment is necessary to reimburse the Architect for including two restroom
facilities located on the golf course as part of the design services agreement; and
NOW THEREFORE, City and Architect, acting herein by and through their duly authorized
representatives, enter into the following agreement which amends the Contract:
1.
Article 1.1, SECTION I-SERVICES OF THE ARCHITECT, a paragraph is added to read as follows:
"Provide additional design services to include electrical power and lighting to the two restroom
facilities located on the golf course for the Meadowbrook Golf Course. The cost of this additional
service is $1,000.00. The scope of services is described more fully in the Nader Design Group
EMail dated August 24, 2007, subject: Meadowbrook GC Restroom Facilities which is attached
hereto as Attachment"A"and made a part of this Agreement."
2.
Paragraph 1 of SECTION V-COMPENSATION TO ARCHITECT, is amended as follows:
"The total compensation for all of the assignments to be performed by Architect as described in
CHARACTER AND EXTENT of ARCHITECT'S SERVICES hereof shall be a fixed fee of
$46,500.00 plus up to$2,000.00 in reimbursable expenses."
3.
All other provisions of this Contract which are not expressly amended herein shall remain in full force and
effect.
EXECUTED this the day of 2007, in Fort Worth, Tarrant County, Texas.
NADER DESIGN GROUP APPR
By: By: 1 0 -ZIL
jOwamrR. a er Marc Ott
Assistant City Manager
APPROVAL RECOMMENDED: RECOJ�
By: �� By:
6vv-, Robert Go6de, PE, Director Marty Hendrix
Transportation &Public Works Department City Secretary
APPROVED TO ORM L ALITY: M&C Not Required
Contract Authorization
By: ;i
A y J am Date:
Assistant A omey
Murayama, Dalton ,A-fP0 MST `` %$
From: James R. Nader[james@naderdesign.com]
Sent: Friday, August 24, 2007 9:59 AM
To: Murayama, Dalton
Cc: Bunton, Nancy
Subject: Meadowbrook GC Rest Room Facilities
Dalton,
A few days ago we forwarded a couple of sets of documents on the above project to your office for final review and
comment before completion. Have you had the opportunity to look into that? We are only interested in keeping it moving.
In addition, we would like you to consider amending our agreement to reinsert the $1,000.00 in proposed fee that we
extracted before we began the work. We did so because, at that time, there was no electrical requirement in the project.
As you can see, we now have power and lighting for the buildings. We have no additional requirement personally, but our
consultant needs to be reimbursed for that design work.
Can you help with that please? I am copying this to Nancy Bunton for verification, so please "reply to all".
Thank you,
James
James R. Nader, AIA
Nader Design Group
410 West 7th Street, Suite 3
Fort Worth, Texas 76102
817.336.9010 Office
817.336.9015 Fax
lames naderdesign.com
08/28/2007