HomeMy WebLinkAboutContract 35742 S Amendment No. 1 Lin STATE OF TEXAS § CITY SECRETARY NO. (No M&C Needed) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and HDR Engineering, Inc. (Engineer) made and entered into City Secretary Contract No. 35500 (the Contract) which was authorized by the City Council by M&C C-22162; and WHEREAS, the Contract involves engineering services for the following project: Storm Water Utility Project Tony's Creek Detention Rehabilitation Study WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly-authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services and provide additional contract time as specified in a proposal letter dated August 6, 2007, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $24,780.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $57,090.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. ORIGINAL Contract Amendment No. 1 Page 1 of 2 Executed on this the day of 2007, in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: APPROVED: A. Douglas Rademaker, P.E. M c A. Ott Director, Department of Assistant City Manager Engineering HIDR Engineering, Inc.; ENGINEER ATTEST: N (k�;�o b�� Marty\ Hendrix, tity Secretary By: Name: Dennis Schulze�P.E. �-- Vice President ENOM&C INQUIRED 210 E. 3rd Street, Suite 300 Fort Worth, TX 76102-4002 APPRO AS TO AND LEGALITY: A y Ra e Assista ty Attorney Contract Amendment No. 1TO, EX, Page 2 of 2 ONE COMPANY Many Solutions August 6,.2007 Mr. Richard Argomaniz, P.E. Project Manager City of Fort Worth Engineering Department 1000 Throckmorton Street Fort Worth, Texas 76102 REF: Tony's Creek Detention Rehabilitation Project Request for Additional Services HDR Project No. 62089 Dear Mr. Argomaniz: HDE Engineering, Inc. is requesting the following additional scope and fee.for the 2006 Storm Water Program-Tony's Creek Detention Rehabilitation Project. STORM WATER UTILITY PROJECT TONY'S-CREEK DETENTION REHABILITATION PROFESSIONAL ADDITIONAL SERVICE FEE SUMMARY CITY PROJECT NO. 00486 CITY SECRETARY CONTRACT NO. 35500 DOE NO. 5426 Request for Additional Services: After meeting and discussions with the City of Fort Worth's staff on July 11, 2007, it has been determined that HDR Engineering will require the following additional services to meet the City's needs on the Storm Water Utility Project - Tony' Creek Detention Rehabilitation. These requested additional services will be in additional to the current City and HDR signed agreement of July 5, 2007. Scope of Services & Fees: Field survey, cross-sections and mapping of this portion of Tony's Creek to represent the existing 3 — 12' x 10' box culverts at N.E. 291h Street. These sections will be taken from N.E. 281h Street (S.H.'183) to N.E. 29'h Street at 0 1 I foot intervals and be approximately 100-feet in width. The total number of cross- sections will be ten. These sections will be used in the hydraulic modeling of the. upstream portion of Tony's Creek from the detention pond. 1. Field survey & office work mapping @ lump.sum = $5,500 • Hydraulic modeling of this potion of Tony's Creek that will be required for the preparation and submittal to the Federal Emergency Management Agency (FEMA) of the Tony's Creek"Letter-of Map Revision" (LOMR). This will include: - Acquisition and coordination of existing hydraulic and hydrologic models. 1. Project Manager 2 hours x$195 per hour=$390 2. Professional 4 hours x$125 per hour=$50-0 3. Technical Support 4 hours x$ 70 per hour=$280 4. Clerical 2 hours x$ 60 per hour= $120 - Addition of surveyed cross.sections to hydrologic model. 1. Project Manager 4 hours x$195 per hour= $780 2. Professional 8 hours x $125 per hour= $1,000 3. Technical Support 2-hours x$ 70 per hour= $140 4. Clerical 2 hours x$ 60 per hour= $120 - Re-delineation and potential mitigation.if there are negative impacts to creek. 1. Project Manager 2 hours x$195 per-hour= $390 2. Professional 4 hours x $125 per hour= $500 3. Technical Support 2 hours x$ 70 per hour= $140 4. Clerical 2 hours x$ 60 per hour=$120 Preparation & creation of report, forms and exhibits for-LOMR submittal. This includes additional coordination with FEMA. 1. .Project Manager 16 hours x$195 per hour.= $3,120 2. Professional 32 hours x$125 per hour=$4,000 3. Technical Support 32 hours x$ 70 per hour= $2,240 4, Clerical 10 hours x$ 60 per hour=$600 • FEMA review and approval fee + $4,400 x 10% markup--4,840 TOTAL ADDITIONAL FEE $24,78D r Thank you for your consideration in this matter. Sincerely, HDR En ' Dennis Schulze, P.E. Vice President M&C Request Review Page 1 of 2 FORTWORTH pity of Fart Forth Employee Intranet www-cfwnet.org Employee ... Ontine I Departments Print M&C COUNCIL ACTION: Approved on 6/5/2007 - Ordinance No. 17583-06-2007 DATE: 6/5/2007 REFERENCE NO.: **C-22162 LOG NAME: 30TONYSCREEK486 CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Engineering Agreement with HDR Engineering, Inc., for the Tony's Creek Detention Rehabilitation Study (Project No. 00486) and Adopt Appropriation Ordinance RECOMMENDATION: It is recommended that the City Council: 1. Authorize the transfer of$37,157.00 from the Storm Water Utility Fund to the Storm Water Capital Projects Fund; 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Storm Water Capital Projects Fund in the amount of$37,157.00; and 3. Authorize the City Manager to execute an engineering agreement with HDR Engineering, Inc., in the amount of$32,310.00 for the Tony's Creek Detention Rehabilitation Study. DISCUSSION: The Storm Water Management Program was established to reduce flooding in Fort Worth, preserve streams, minimize water pollution and to operate the storm water system in a more effective manner to fully comply with state and federal regulatory requirements. This will be accomplished by infrastructure reconstruction and system maintenance, master planning, enhanced development review, and increased public education and outreach. Tony's Creek Detention Pond is a City-owned facility which has deteriorated due to erosion and parking lot runoff. The scope of the project includes the preparation of a drainage study that will provide recommendations for the necessary improvements to Tony's Creek Detention Pond which has deteriorated due to erosion and surface runoff. HDR Engineering, Inc., proposes to perform the necessary study work for a lump sum fee of $32,310.00. City Staff considers this to be fair and reasonable for the scope of services proposed. In addition to the contract amount, $4,847.00 is required by the Engineering Department for project management. HDR, Engineering, Inc., is in compliance with the City's M/WBE Ordinance by cornmitting to-26 percent M/WBE participation. The City's goal on this project is 15 percent. http://www.cfwnet.org/council racket/mc_review.asp?refnum=C-22162 (2007 M&C Request Review Page 2 of 2 This project is located in COUNCIL DISTRICT 2. FISCAL INFORMATION/C RTIFICATION: The Finance Director certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds willbe available in the current capital budget, as appropriated, of the Storm Water Capital Projects Fund. TO FROM Fund/Account/Centers 1&2)P228 472069 2022800486ZZ $37,157.00 1)PE69 538070 0209206 $37,157.00 2)P228 531350 202280048610 808.00 3)P228 531200 202280048616 $32.310.00 2)P228 531200 202280048616 $32,310.00 2)P228 531350 202280048616 $3,231.00 2)P228 531350 202280048620 $808.00 Submitted for City Manager's Office by: Marc Ott (8476) Originating Department Head: A. Douglas Rademaker (6157) Additional Information Contact: Dena Johnson (7866) ATTACHMENTS 30TonysCreek486.doc http://www.cfwnet.org/council_packet/mc_review.asp?refnum=C-22162 8/23/2007