Loading...
HomeMy WebLinkAboutContract 35554-A1Amendment No. 1 STATE OF TEXAS § CITY SECRETARY NO.3b55 " A COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Teague Nall and Perkins, Inc., (Engineer) made and entered into City Secretary Contract No. 35554 the Contract) which was authorized by the City Council by M&C &22181 on the 12th day of June 2007; and WHEREAS, the Contract involves engineering services for the following project: Quail Run Drainage Improvements Project No. 00629 WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract. 1. Article I of the Contract is amended to include the revised scope in engineering services specified in a proposal letter .dated October 28, 2008, a copy of which is attached hereto and incorporated herein. The cost to City for the -additional services to be performed by Engineer total $11,060.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $54,276.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. qFFtQiALRECOR� GITY SECRETARY FT. WORTH, TX Contract Amendment No. 1 Page 1 of 2 Executed on this the '�� '� day of �� � 2008, in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: Gre mon P.E. Actin ctor Transp nation and Public Works Teague Nall and Perkins, Inc. ENGINEER Name: Ty Hilton, P.E. Vice President 1100 Macon Street Fort Worth, Texas 76102 APPROV Assistant City Attorney APPROVED: Fernando Costa Assistant City Manager ATTEST: i�� Marty City Secretary 1'�O ���,��� �'.'�I�t1�tl'g��� �`(: �_ �,-�__—�_�_T_ �t��a�� �` r,t�� 5 CI7�(���;Rfi=ARY FT, �'�C�?T�l, TX � Contract Amendment No. 1 Page 2 of 2 Civil Engineering Surveying ,; Landscape Architecture z Planning October 28, 2008 Mr. RichardArgomaniz, P.E. City of Fort Worth Department of Engineering 1000 Throckmorton Street Fort Worth; Texas 76102 Re: Quail Run Drainage Improvements City Project No. 00629 Contract Amendment No. 1 TNP No. FTW 06301 Dear Mr. Argomaniz: Teague Nall and Perkins, Inc. is submitting this Amendment to the above referenced contract based on additional services requested. The following is a brief description and cost for the additional services provided on this project: Additional Services for Quail Run Drainage Improvements During the course of design and City review of the project, it became apparent that no records are available for a private neighborhood (Highland Pcm that drains onto the project location. Field verification will be required to record the existing storm drain infrastructure and determine how drainage areas affect Quail Run. In addition, the original project scope did not cover the entire length of Quail Run, however new development on the far west end of the street creates a need to evaluate drainage patterns on the west end of the street. Topographic survey also needs to be extended to the east to verify drainage patterns at the intersection of Burton Hill. Finally, an existing 18" storm drain line located between 5320 and 5324 Quail Run that was to be replaced with a larger pipe does not appear to have a drainage easement based on record drawing research. ■ Additional Engineering Design $ 5,400 ■ Drainage Easements $ 660 ■ Additional Topographic Surveying on Quail Run Summary of Contract Fee: Original ContractAmount: $ 43,216 Amendment No. 1: $ 11.060 Revised Contract Amount $ 54,276 T/PW Subtotal $ 111060 Water Subtotal $ 0 Sewer Subtotal $ 0 T/PW Work Phase Revisions: Original Revised 51 $ 5,000 $ 10,660 31 $ 11,466 $ 13,086 32 $ 22,929 $ 26,169 33 $ 3,821 $ 4,361 TOTAL $ 43,216 $ 54,276 1100 Macon Street •Fort Worth, Texas 76102 • 817.336.5773 phone • 817.336.2813 fax www. tnp-ont ine. com Mr. Richard Argomaniz, PE, October 28, 2008, Page 2 of 2 In addition to the fee changes above, a revised schedule has also been prepared and is included in an attachment. Thank you for consideration of this contract amendment request. If you have any questions, please do not hesitate to call me. Sincerely, D PERKINS9 INC. Att: Revised Project Schedule Copy: Mr. Ty Hilton, PE - TNP o:\projects\t1w06301\dots\contract\_contract amend 01.doc City of Fort Worth = Quail Run Amendment Additional Engineering Design Highland Park Record Drawin Research 3 Field Visits to verify Highland Park drainage (2 trips) 18 Drainage Area Map Revisions 2 Additional Design for increased street length 22 QA/QC, Proj. M mt. 4 Additional Printing $ 350 Subtotals $ 5 Drainage Easement _ Metes & Bounds and Exhibit $ 660 Subtotal $ 660 Additional Topographic Survey Quail Run/Burton Hill Topo (725 LF @ $5.50/LF) $ 4,000 Highland Park Topo (Selected areas only) $ 11000 Subtotal $ 59000 Total � $ 11